• Title/Summary/Keyword: failure modes

Search Result 1,338, Processing Time 0.033 seconds

Behavior of Reinforced Concrete Slabs Connected with Hinge Joints of Remodelling Buildings (리모델링 건물의 활절점에 의하여 연결된 철근콘크리트 바닥판의 거동 평가)

  • Sim Kyu-Kwan;Kim Sang-Sik;Lee Jung-Yoon;Choi kwang-Ho;Im Juhyeuk
    • Journal of the Korea Concrete Institute
    • /
    • v.17 no.5 s.89
    • /
    • pp.761-768
    • /
    • 2005
  • Lately outmoded and functionally obsolete buildings constructed in 1960s and 1970s are often remodelled and restored. Even though there are not serious structural defects in the existing buildings, many old buildings have been reconstructed to improve residence quality or to extend residence area of the buildings. The experimental or theoretical research on plane expansion of RC apartments is quite scare. In this research, 12 specimens and 19 RC slabs connected by hinged joints were tested. The new slab was connected to the existing slab by hinge joints injecting dowel bars between two slabs. Main parameters of the slabs are types of the dowel bars (D13 and D19), spacing of the dowel bars (150mm, 300mm, and 450mm), and the locations of the steel bars in the existing slabs. The test results indicated that the shear strength of the RC test slabs having various types of dowel bars was about twice that calculated by the ACI 318-02 code. All slabs failed in concrete spatting and the dowel steel bars did not reach their yield strengths.

Development of Short-span Precast Concrete Panels for Railway Bridge (철도교용 단지간 프리캐스트 콘크리트패널의 개발)

  • Seol, Dae-Ho;Lee, Kyoung-Chan;Kim, Ki-Hyun;Youn, Seok-Goo
    • Journal of the Korea Concrete Institute
    • /
    • v.28 no.5
    • /
    • pp.545-553
    • /
    • 2016
  • This paper presents experimental static test results of the precast concrete panels developed for short-span concrete bridge deck form. Different from LB-DECK, concrete rib attached to the bottom surface of concrete panel, and Top-bar is not used at the top surface of concrete panel. Number of concrete ribs and cross-section details of concrete rib are determined from the analytical results of parametric study considering the span length and the thickness of concrete bridge decks. Shear rebars are installed at the top surface of concrete panel for composite action between precast concrete panel and cast-in-place concrete. In order to evaluate the safety and the serviceability of the developed short-span concrete panel subjected to design load, static load test is conducted. Three test panels with span length of 1.6m are fabricated, and during the load test displacements, strains and cracks of test panels are measured and final failure modes are investigated. Serviceability of the test panels is evaluated based on the results of displacements, cracking load, and crack width at the design load level. Safety is also evaluated based on the comparison of the ultimate strength and the factored design load of test panels. Based on the test results, it is confirmed the short-span precast concrete panel satisfies the serviceability and safety regulated in design codes. In addition, the range of span length of concrete bridge decks for the short-span concrete panel is discussed.

A Study for Lifespan Prediction of Expansion by Temperature Status (온도상태에 따른 신축관 이음의 수명예측에 관한 연구)

  • Oh, Jung-Soo;Lee, Bong-Soo
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.424-429
    • /
    • 2018
  • In this study, an expansion joint that is susceptible to waterhammer was tested for its vibration durability. The operation data for the hydraulic actuator was the expansion length of the expansion joint when the waterhammer occurred. In the case of the vibration durability test, the internal temperature status of the expansion joint was assumed to be a stress factor and a lifespan prediction model was assumed to follow the Arrhenius model. A test was carried out by increasing the internal temperature status at $30^{\circ}C$, $50^{\circ}C$, and $65^{\circ}C$. By a linear transformation of the lifespan data for each temperature, a constant value and activation energy coefficient was induced for the Arrhenius equation and verified by comparing the value of a lifetime prediction model with the experimental value at $85^{\circ}C$. The failure modes of the ongoing or finished test were leakage, bellows separation, and internal deformation. In the future, a composite lifespan prediction model, including two more stress factors, will be developed.

Peel strength of denture liner to PMMA and polyamide: laser versus air-abrasion

  • Korkmaz, Fatih Mehmet;Bagis, Bora;Ozcan, Mutlu;Durkan, Rukiye;Turgut, Sedanur;Ates, Sabit Melih
    • The Journal of Advanced Prosthodontics
    • /
    • v.5 no.3
    • /
    • pp.287-295
    • /
    • 2013
  • PURPOSE. This study investigated the effect of laser parameters and air-abrasion on the peel strength of silicon-based soft denture liner to different denture resins. MATERIALS AND METHODS. Specimens (N=180) were prepared out of three different denture base resins (Rodex, cross-linked denture base acrylic resin; Paladent, heat-cured acrylic resin; Deflex, Polyamide resin) ($75mm{\times}25mm{\times}3mm$). A silicon-based soft denture liner (Molloplast B) was applied to the denture resins after the following conditioning methods: a) Air-abrasion ($50{\mu}m$), b) Er,Cr:YSGG laser (Waterlase MD Turbo, Biolase Technology) at 2 W-20 Hz, c) Er,Cr:YSGG laser at 2 W-30 Hz, d) Er,Cr:YSGG laser at 3 W-20 Hz, e) Er,Cr:YSGG laser at 3 W-30 Hz. Non-conditioned group acted as the control group. Peel test was performed in a universal testing machine. Failure modes were evaluated visually. Data were analyzed using two-way ANOVA and Tukey's test (${\alpha}$=.05). RESULTS. Denture liner tested showed increased peel strength after laser treatment with different parameters ($3.9{\pm}0.4-5.58{\pm}0.6$ MPa) compared to the control ($3.64{\pm}0.5-4.58{\pm}0.5$ MPa) and air-abraded groups ($3.1{\pm}0.6-4.46{\pm}0.3$ MPa), but the results were not statistically significant except for Paladent, with the pretreatment of Er,Cr:YSGG laser at 3 W-20 Hz. Polyamide resin after air-abrasion showed significantly lower peel strength than those of other groups ($3.1{\pm}0.6$ MPa). CONCLUSION. Heat-cured acrylic resin, PMMA, may benefit from Er,Cr:YSGG laser treatment at 3 W-20 Hz irradiation. Air-abrasion of polyamide resins should be avoided not to impair their peel bond strengths to silicon-based soft denture liners.

Flexural Behavior of Reinforced Recycled Aggregate Concrete Beams (순환골재를 사용한 철근콘크리트 보의 휨거동 특성)

  • Song, Seon-Hwa;Choi, Ki-Sun;You, Young-Chan;Kim, Keung-Hwan;Yun, Hyun-Do
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.4
    • /
    • pp.431-439
    • /
    • 2009
  • These days the amount of demolished concrete waste has been increasing due to reconstruction and redevelopment of aged buildings. So the use of recycled aggregates is recommended to solve environmental problems. Some investigations have been carried out to study the flexural behavior of reinforced concrete beams with recycled aggregates. But these have some limitation due to the use of low quality recycled aggregates and small-scale specimens in the laboratory. The purpose of this experimental study is to evaluate the flexural behavior of simply supported RC beams subjected to four-point monotonic loading and made with recycled aggregates. Seven full-scale RC beams were manufactured with different replacement level of recycled aggregates. The main parameters of the study are combination of aggregates. From the test results, the flexural behavior of the beam is described in terms of crack patterns and failure modes. And the flexural strength of RC beam with different types of recycled coarse aggregates and recycled fine aggregates is compared with the provision of KCI code.

An Early Spectrum Sensing for Efficient Radio Access in Cloud-Conceptual Base Station Systems (클라우드 기지국 시스템에서 효율적 무선 접속을 위한 이른 스펙트럼 감지 기법)

  • Jo, Gahee;Lee, Jae Won;Na, Jee-Hyeon;Cho, Ho-Shin
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.38A no.1
    • /
    • pp.68-78
    • /
    • 2013
  • In this paper, we propose an early spectrum sensing(ESS) as an advance preparation for radio-access trial, which enables multi-mode terminals to access the most appropriate radio-access system in a cloud-conceptual base station system where multiple radio access technologies(RATs) coexist. Prior to a random access to one of RATs, a multi-mode terminal conducts a spectrum sensing over entire frequency bands of whole RATs, then select the RAT with the lowest sensing power, that is likely to have the most available spectrum. Thus, an access failure caused by that the selected RAT has no available radio spectrum could be avoidable in advance. In computer simulation, we consider as various RATs as possible. First, circuit and packet systems are taken into consideration. In addition, the packet systems are classified according to the feasibility of carrier aggregation(CA). In case of terminal, three modes are considered with circuit-only, packet-only, and multi-mode. Subsequently, packet traffic is classified into real-time and non-real-time traffic with three different tolerable delay levels. The simulation includes a call process starting with a call generation and ending up with a resource allocation reflecting individual user's QoS requirements and evaluates the proposed scheme in terms of the successful access probability, system access time, system balancing factor and packet loss probability.

A Comparison Study of Input ESD Protection schemes Utilizing Thyristor and Diode Devices (싸이리스터와 다이오드 소자를 이용하는 입력 ESD 보호방식의 비교 연구)

  • Choi, Jin-Young
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.47 no.4
    • /
    • pp.75-87
    • /
    • 2010
  • For two input-protection schemes suitable for RF ICs utilizing the thyristor and diode protection devices, which can be fabricated in standard CMOS processes, we attempt an in-depth comparison on HBM ESD robustness in terms of lattice heating inside protection devices and peak voltages developed across gate oxides in input buffers, based on DC, mixed-mode transient, and AC analyses utilizing a 2-dimensional device simulator. For this purpose, we construct an equivalent circuit for an input HBM test environment of a CMOS chip equipped with the input ESD protection circuits, which allows mixed-mode transient simulations for various HBM test modes. By executing mixed-mode simulations including up to six active protection devices in a circuit, we attempt a detailed analysis on the problems, which can occur in real tests. In the procedure, we suggest to a recipe to ease the bipolar trigger in the protection devices and figure out that oxide failure in internal circuits is determined by the junction breakdown voltage of the NMOS structure residing in the protection devices. We explain the characteristic differences of two protection schemes as an input ESD protection circuit for RF ICs, and suggest valuable guidelines relating design of the protection devices and circuits.

Structure & Installation Engineering for Offshore Jack-up Rigs

  • Park, Joo-Shin;Ha, Yeong-Su;Jang, Ki-Bok;Radha, Radha
    • Bulletin of the Society of Naval Architects of Korea
    • /
    • v.54 no.4
    • /
    • pp.39-46
    • /
    • 2017
  • Jack-up drilling rigs are widely used in offshore oil and gas exploration industry. It is originally designed for use in the shallow waters less than 60m of water depth; there is growing demand for their use in deeper water depth over 150m and harsher environmental conditions. In this study, global in-place analysis of jack-up rig leg for North-sea oil well is performed through numerical analysis. Firstly, environmental conditions and seabed characteristics at the North-sea are collected and investigated measurements from survey report. Based on these data, design specifications are established and the overall basic design is performed. Dynamic characteristics of the jack-up rig for North-sea are considered in the global in-place analysis both leg and hull and the basic stability against overturning moment is also analyzed. The structural integrity of the jack-up rig leg/hull is verified through the code checks and the adequate safety margin is observed. The uncertainty in jack-up behaviour is greatly influenced by the uncertainties in the soil characteristics that determine the resistance of the foundation to the forces imposed by the jack-up structure. Among the risks above mentioned, the punch-through during pre-loading is the most frequently encountered foundation problem for jack-up rigs. The objective of this paper is to clarify the detailed structure and installation engineering matters for prove the structural safety of jack-up rigs during operation. With this intention the following items are addressed; - Characteristics of structural behavior considering soil effect against environmental loads - Modes of failure and related pre-loading procedure and parameters - Typical results of structural engineering and verification by actual measurement.

  • PDF

Study on the Improvement Impaired Driving Environment of the IT Convergence-based Road Safety at Road Construction Sites with a Robot Protector (IT 융합기반 도로안전지킴이로봇을 통한 도로 건설 현장에서의 장애인운전환경 개선 연구)

  • Lee, S.Y.;Kim, D.O.;Rhee, K.M.
    • Journal of rehabilitation welfare engineering & assistive technology
    • /
    • v.9 no.1
    • /
    • pp.17-21
    • /
    • 2015
  • There have been sustained developments of advanced technologies using traffic safety facilities recently and techniques for identifying failure modes and devices which could result in fatal outcomes. The purpose of this research is aimed at improving the driving conditions in advance through analyzing the IT convergence, driving education, researches for vehicles, field of construction and robotics. The researchers evaluate on usability tests of the driving with 26 candidates through focusing on safety, convenience, efficiency, effectiveness. Using specialized LED panel to enhance driving performances of disabled people are for cautious road conditions like foggy weather or heavy rain. As a result, there were improvements in the driving conditions, and candidates reported this system was helpful. It allows them for maintaining proper driving all times and was especially informative for people with low vision or visually impaired. This system plays a pivotal role as a prevention mechanism not only for regular drivers but also for further delict of traffic violations or accident offenders who already have former record on tort.

  • PDF

Pull-out Capacity of Cast-in-place Anchor for Construction of Precast Concrete Segment Arch (프리캐스트 콘크리트 패널 분절 아치 시공을 위한 선설치 앵커의 인발 강도 평가)

  • Ahn, Jin-Hee;Yim, Hong Jae;Bang, Jin Soo;Jeon, Seok Hyeon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.2
    • /
    • pp.94-102
    • /
    • 2020
  • Precast concrete segment arch system has an economic and construct ability that combined with advantage of precast concrete and arch behavior. A precast concrete segment arch system with outrigger is consisted of segmented precast panels, a steel outrigger rib, and V-strip to connect precast panels with a steel outrigger rib and cast-in-place anchors in precast panels to connect V-strip should have sufficient pull-out capacity to form its arch shape by site lifting for assembled precast panels and outriggers. However, it is difficult to secure its embedment depth due to the relatively shallow thickness of precast panel. It can be also occurred that flexure deformation of precast panels caused by its pull-out behaviors. In this study, pull-out capacity of cast-in-place anchor was examined for construction of precast concrete segment arch system with outriggers. Therefore, a total of 24 precast panel specimens were fabricated to examine pull-out capacities of cast-in-place anchor in precast panels, and installation depth of anchors, diameter of anchors and wire mesh effects for the precast panel were examined. From this pull-out tests, its pull-out capacities and failure modes were evaluated and the type of the cast-in-place anchor applicable to the precast concrete segment panel arch system with outriggers was determined from comparison of the design specification values.