• 제목/요약/키워드: facility safety management

검색결과 714건 처리시간 0.027초

속도저감형 시설이 차량 주행 속도에 미치는 영향 분석 (Effects on the Vehicle Running Speed Analysis according to the Speed Reduction Road Facilities)

  • 강수철;유순덕;조규철
    • 한국안전학회지
    • /
    • 제31권5호
    • /
    • pp.158-170
    • /
    • 2016
  • It has been applied several ways in order to prevent traffic accidents and speed management on the road which is one of very important factors to prevent accidents. In this study, it is analyzed whether the facility such as the flashing and crosswalk, speed cameras and intermittent warning signs affect on a driving deceleration or not. It has been shown that the flashing and crosswalk and speed cameras except intermittent warning signs play a role of reducing the driving speed. The result showed that these traffic safety facilities help to improve the average speed as well as velocity distribution which was derived by the speed deviation even if there were the difference between facilities. Speed limit display does not affect the deceleration of the driver. Therefore, it was founded in this research that there were the driving speed reduction effect due to the facilities on the road. In order to control the driving speed on the road, it is necessary to install facilities with appropriate location and spacing on the road. In addition, place that turns out suppressed speeding through speed management also are required adequate facilities such as speed cameras.

AHP 분석을 이용한 기계식 주차설비 건설 중 위험성 평가방안 연구 (Risk Assessment of Mechanical Parking Facility during Construction based on AHP Analysis)

  • 이정한;김용곤;이재원;김종훈
    • 한국안전학회지
    • /
    • 제37권5호
    • /
    • pp.33-41
    • /
    • 2022
  • As the number of automobile registrations increases yearly, parking spaces that are located in downtown areas are increasing, and mechanical parking facilities are also increasing. Therefore, there is a high risk of accidents when installing and repairing a mechanical parking facility. In the preceding six years (from 2012 to 2018), the statistics that pertain to accidental disasters indicated that a total of 137 disaster victims were generated by the construction sector, 33 accidents occurred, and 10 people died. However, only the safety management items pertaining to accidents that occur during maintenance work and the use of the installed mechanical parking facilities are being studied; furthermore, there is no ongoing research with respect to the risk management that is conducted at the construction site. In 2017, the Korea Occupational Safety and Health Agency (KOSHA) announced the "Guidelines for Safe Installation and Maintenance of Mechanical Parking Equipment"; however, it is a safety guideline that is limited to the installation of basic protective equipment and to facility installation. There is no model for mechanical parking facilities that is indicated in the "Risk Assessment Model by Construction Industry Type", which is issued by the Safety and Health Corporation and is widely utilized for risk assessment in the construction industry; moreover, elevator installation work CODE N0: 22 is the only major example of a disaster. In this study, "risk assessment through a focus group interview" was performed, and data was derived from the "risk assessment of Article 41 (2) of the Industrial Safety and Health Act", which reflects the characteristics of the construction industry based on AHP analysis. The results of this study can be utilized for the risk assessment that is conducted during the construction stage of mechanical parking facilities.

가스설비의 신뢰도데이터 수집방법에 관한 연구 (A Study on the Collecting Method of Reliability Database for Gas Facilities)

  • 이광원;윤익근;한상태;오신규;김태훈
    • 한국안전학회지
    • /
    • 제23권2호
    • /
    • pp.37-44
    • /
    • 2008
  • The safety assessment for facility industry is now being periodically performed. For the purpose of scientific safety management, QRA(Quantitative Risk Assessment) is also being performed, and reliability data of the facilities is essential to perform the assessment. Generally, the existing safety assessment is performed by using the values announced in other industry processes, which result in the drop of reliability. In order to solve this problem, there is an urgent need to establish reliability database for the facilities. The most appropriate method is to perform a direct reliability analysis towards the facilities undergoing safety assessment. In this study, in compliance with the assessment method and procedure of OREDA-2002 handbook, the facility reliability data are collected, which include the calendar time and operational time in terms of different facility items, the number of failures in terms of different failure mode, the mean, standard deviation, lower limit and upper limit of failure rate, and the failure rate. And the data process method for this special occasion is also proposed when the number of failure is 0.

설비 운영의 에러 분석을 통한 인자 및 모델연구 -반도체 산업중심- (The study on factor and model through error analysis to equipment operation (Focused on the Semiconductor industry))

  • 윤용구;박범
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2009년도 추계학술대회
    • /
    • pp.187-201
    • /
    • 2009
  • Semiconductor industry is based on equipment industry and timing industry. In particular, semiconductor process is very complex and as semiconductor-chip width tails and is becoming equipment gradually more as a high technology. Equipment operation is primarily engaged in semiconductor manufacturing (engineers and operator) of being conducted by, equipment errors have also been raised. Equipment operational data related to the error of korea occupational safety and health agency were based on data and production engineers involved in the operator's questionnaire was drawn through the error factor. Equipment operating in the error factor of 9 big item and 36 detail item detailed argument based on the errors down, and 9 big item the equipment during operation of the correlation error factor was conducted. Each of the significance level was correlated with the tabulation and analysis. Using the maximum correlation coefficient, the correlation between the error factors to derive the relationship between factors were analyzed. Facility operating with the analysis of error factors (big and detail item) derive a relationship between the model saw. The end of the operation of the facility in operation on the part of the two factors appeared as prevention. Safety aspects and ergonomics aspects of the approach should be guided to the conclusion.

  • PDF

응급실 간호사의 환자안전문화에 대한 인식과 환자안전관리활동 (Emergency Room Nurses' Recognition of Patient Safety Culture and their Safety Management Activity)

  • 이지은;이은남
    • 중환자간호학회지
    • /
    • 제6권1호
    • /
    • pp.44-56
    • /
    • 2013
  • Purpose: The purpose of this study was to investigate emergency room nurses' recognition of patient safety culture and their performance of safety management activity. Methods: Data were collected from July 1 to August 31, 2012 on 292 emergency room nurses working at 25 general hospitals located in B city in G province. The Hospital Survey on Patient Safety Culture was used to measure patient safety culture, and an 82-item questionnaire was developed to measure safety management activity. Results: the performance of safety management activity were significantly associated with the total career years, whether the nurses had undergone safety training, and whether the nurses has been working in the regional emergency care facility. Of 6 subcategories of the patient safety culture, the perception of a directly commanding senior/manager, frequency of accident reports, and hospital environment were associated with the performance of safety management activity. Conclusion: For improving performance of safety management activity among emergency room nurses, it is necessary to develop an educational program of safety management activity by their level of performance.

  • PDF

야간공원 이용자 공공안전성평가(1994/2008) 비교분석 (Public Safety Comparative Analysis for Night Park Users (1994/2008))

  • 이종성;이덕재
    • 한국환경과학회지
    • /
    • 제18권5호
    • /
    • pp.551-559
    • /
    • 2009
  • This study aims to find out negative factors against public safety in urban parks. Longitudinal data between 1994 and 2008 were analyzed to suggest management implication for high quality security and safety in urban park. Results are summarized as follows. Firstly, investigation of visitor to the park at night reveals that visitors who were elderly, walking out, and family group increased, and that most visitors took a stroll for one hour around 8:00pm. Olympic park (e.g. leisure facility 66.7%), Hyo-won park (e.g. vacant lot 23.8%), Jang-an park (e.g. near hedge 30.1%), and Mae-tan park (e.g. leisure facility 20.8%) were revealed as latent places of serious criminals. Secondly, both in 1994 and in 2008, principal factors of public safety were summarized as fear for violence(X1) and fear for closed space(X3). These factors took 3.22 followed by 3.07 respectively in the overall mean of public safety of parks. Thirdly, overall mean of public safety takes 2.22 in 1994 and 2.96 in 2008, which shows uncertainty of effective management of facilities with a viewpoint of visitors. All parks shows negative trend in public safety, in short.

시설물 안전 및 유지관리 성과 평가에 관한 연구 - 시설물 안전등급 변화를 중심으로 - (A Study on Performance Evaluation of Infrastructure Safety and Maintenance)

  • 강상혁;최석인;김화랑;이정석
    • 한국건설관리학회논문집
    • /
    • 제17권2호
    • /
    • pp.80-89
    • /
    • 2016
  • 최근 인프라 투자는 신규 건설 중심에서 기 시공된 시설의 효율적인 운영과 유지관리로 패러다임이 전환되고 있다. 이와 함께 시설물 노후화에 따른 안전에 대한 국민적 관심이 증폭되고 있다. 본 연구에서는 한국시설안전공단의 시설물관리종합정보시스템에 등록되어 있는 1994년부터 2014년까지의 시설물 유지관리 관련 데이터를 바탕으로 점검진단지수와 보수보강지수 등의 정량적 분석 방법론을 적용하여 유지관리 활동의 성과를 평가하였다. 또한 과거에 비해 현재 시설물의 안전도가 어느 정도 향상되었는지 안전등급 데이터를 토대로 분석을 실시하였다. 분석 결과 우리나라 시설물의 안전성은 과거 대비 크게 향상된 것으로 나타났으며 안전성이 향상된 요인으로는 정기적인 안전점검과 그에 따른 보수 보강 활동의 결과로 추정해 볼 수 있다. 본 연구를 통해 도출 된 결과는 향후 시설물의 유지관리 정책 및 전략 수립에서 기초적 자료로 활용이 가능할 것으로 판단된다.

자산관리관점에서 터널시설물의 서비스 수준 평가항목에 관한 연구 (Assessment Items for the Level of Service for Tunnel Facilities from an Asset Management Perspective)

  • 정성윤;나혜숙;최원식
    • 한국콘텐츠학회논문지
    • /
    • 제12권1호
    • /
    • pp.68-79
    • /
    • 2012
  • 한국은 경제 부흥을 꾀하기 위해 1980년대 말부터 도로시설물 건설을 확대해 왔다. 그 결과, 2010년 이후부터는 시설물의 보수, 보강 수요가 급증할 것으로 예측된다. 따라서 제한된 예산을 가지고 사용자의 만족도를 높이면서 시설물의 관리 기술을 혁신하기 위해 자산관리정보시스템을 연구하고 있다. 본 연구는 터널시설물의 유지관리를 대상으로 서비스 수준을 평가하는 항목을 제시하는 내용으로서, 이를 위해 사용자와 관리자를 구분하여 평가항목의 중요도에 대해서 설문조사를 실시하였다. 설문조사 결과를 토대로 Satty가 제시한 AHP(Analytical Hierarchy Process) 기법을 사용하여 평가항목들의 상대적 중요도를 파악하였다. 사용자관점에서의 중요도는 안정성-이동성-접근성-편리성-관리 효율성-쾌적성-지역 활성화-환경성-정보성 순서로 파악되었다. 또한 관리자관점에서의 중요도는 안정성-이동성-접근성-환경성-지역 활성화-편리성-관리 효율성-정보성-쾌적성 순서로 파악되었다. 이는 도로가 갖는 가장 기본적인 기능인 이동성보다 터널시설물의 안전성에 대한 관심이 더 높다는 것을 의미한다. 따라서 터널시설물의 유지관리 투자계획을 수립할 때 안전성을 확보할 수 있도록 보다 많은 관심과 노력을 기울려야 할 것으로 사료된다.

철도 신호제어 시스템의 AHP 기법 적용을 통한 성능평가 대상설비 항목 개선 및 안전성 확보에 관한 연구 (On the Improvement of Facility to Performance Evaluation and Security of Safety through the Application of AHP Method in Railroad Signal Control System)

  • 황선우;김주욱;김영민;김형철;이수환
    • 대한안전경영과학회지
    • /
    • 제23권1호
    • /
    • pp.71-79
    • /
    • 2021
  • The railroad facilities are intended for long-term operation as the initial acquisition costs necessary for infrastructure construction are high. Therefore, regular maintenance of railroad facilities is essential, and furthermore, system reliability through systematic performance evaluation is required. In this study, the signal control system of railroad electrical equipment was selected as the subject of research and the performance evaluation target facility selection study was conducted using AHP. The results of the study can contribute to the reliability of the signal control system as well as to the reliability of the railroad system, which is a higher system.

Indicator of Facility Performance Evaluation (FPE) for Educational Facilities of BTL Projects

  • Lee, Kwan-Jong;Lee, Chun-Kyong;Park, Tae-Keun
    • Architectural research
    • /
    • 제14권1호
    • /
    • pp.35-44
    • /
    • 2012
  • Build-Transfer-Lease (BTL) was introduced to the domestic construction market in 2005. Now, seven years later, the BTL model is most active for educational facilities. In 2011, 93 educational facility projects entered the maintenance stage. Considering the characteristics of today's BTL projects for educational facilities, the main issues are the initial performance and maintenance of educational facilities and the service-providing status for the 20-year operational management period, in relation to providing safety and convenience to students, the facility users. Seeking a solution, local education offices and departments in charge of BTL under the Ministry of Education, Science, and Technology have been exploring various methods of evaluating operational maintenance performance from various perspectives. For educational facility BTL projects, however, the appropriateness of initial operation performance evaluation, rather than considering the 20-year operational management period, is controversial in regards to sustainability. On this account, performance evaluation items in four areas-operational maintenance evaluation, facility performance status evaluation, maintenance subject evaluation, and sustainable change response evaluation-should be extracted. An indicator of facility performance evaluation is presented in this study through an AHP survey targeting experts, as part of establishing an operation performance evaluation system for educational facility BTL projects.