• Title/Summary/Keyword: facility safety management

Search Result 706, Processing Time 0.029 seconds

A Study on the Factors of Safety Competency Enhancement Education Influencing the Improvement of the Professionalism of the Supervisor of Public Institution Management Supervisor (공공기관 관리감독자 전문성 향상에 영향을 미치는 안전역량강화교육 요인에 관한 연구)

  • Sooil Bang;Changkwon Park;Gilsang Jang
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.4
    • /
    • pp.15-23
    • /
    • 2023
  • This study analyzed effective capacity building education plans for public institution management supervisors. A survey was conducted on 635 management supervisors of public institutions (99 institutions) subject to the safety management rating system to understand the characteristics of educational participants and the impact of educational satisfaction on professionalism improvement after capacity building education. As a result of statistical analysis, the professional improvement according to the affiliation of educational participants was higher in the workplace and construction site divisions than in the research facility division, and the professional improvement according to the working period was higher for more than 15 years than for less than 5 years and less than 15 years. In addition, the quality of education had a significant positive (+) effect on the degree of professional improvement. This study can be used as basic data for further research related to capacity building education for public institution management supervisors

Behavior Analysis of Small Size Elevator Brake (소형 승강기 제동장치의 거동해석)

  • LEE, Jong-Sun
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.2
    • /
    • pp.401-406
    • /
    • 2016
  • Elevator is very important transportation facility of modern society. But there have been frequent elevator accidents recently. In the view of safety management of elevator, the corresponding study must be done since accidents related elevator include not only actual accident but also possible accident in order to protect user from danger. A 3D design was developed using SolidWorks and behavior analysis using FEM Code.

A Study on the Effective Method of Fire Safety Management of Geriatric Hospitals (요양병원 소방안전관리의 효율화 방안에 관한 연구)

  • Lee, Young-Sam
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.1
    • /
    • pp.83-88
    • /
    • 2016
  • Currently many geriatric hospitals have been built in Korea because increasing aging rapidly. However the increasing geriatric hospitals make the increasing safety accidents. Therefore this study is conducted by survey and face-to-face talk with the fire safety managers for analyzing safety problem of geriatric hospitals which number is twelve among 15 geriatric hospitals in the north of Chung-buk area. The result of this study is that geriatric hospitals are very old. Fire safety managers holding the fire safety license are a level 2 issued by the Korea Fire Safety Association(KFSA). And the fire safety inspection ability of them is normal (58%). Furthermore a fire safety budget ratio is 83% (A little) in the company yearly budget. And ratio having the fire inspection equipment in the building is 42% (A little) and 33% (Nothing). Satisfaction ratio of their duty is 66% and they also get stress from heavy duty and heavy responsibility. In conclusion, CEO needs to invest and interest the improvement of job performance, satisfaction ratio and fire safety facility. Also government needs the improvement of system to support and supervise the fire safety of geriatric hospitals consistently.

A Study on Explosion Risk Management for Hot Oil Heater (열매체 가열기 설비에서의 폭발위험관리에 관한 연구)

  • Jang, Chul;Kwon, Jin-Wook;Hwang, Myoung-Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.3
    • /
    • pp.1-9
    • /
    • 2017
  • In the industrial field, various type of fuel have been used for product processing facilities. Recent for 10 years, the usage of natural gas (NG) was gradually increased. Because it has many merits; clean fuel, no transportation, storage facility and so on. There are common safety concept that strict explosion protection approaches are needed for facilities where explosive materials such as flammable liquid, vapor and gases exist. But some has an optimistic point of view that the lighter than air gases such as NG disperse rapidly, hence do not form explosion environment upon release into the atmosphere, many parts has a conventional safety point of view that those gases are also inflammable gases, hence can form explosion environment although the extent is limited and present. In this paper, the heating equipments (Hot Oil Heater) was reviewed and some risk management measures were proposed. These measures include hazardous area classification and explosion-proof provisions of electric apparatus, an early gas leak detection and isolation, ventilation system reliability, emergency response plan and training and so on. This study calculates Hazardous Area Classification using the hypothetical volume in the KS C IEC code.

Research Integrated Change Process for Configuration Management of Construction Nuclear Power Plant (건설원전 형상관리를 위한 통합변경프로세스 연구)

  • Park, Youjin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.231-232
    • /
    • 2016
  • Configuration Management (CM) is a process of identifying and documenting the characteristics of a Structures, Systems and Components (SSCs), and of ensuring that changes to these characteristics are properly assessed, approved, issued, implemented and verified. There are requirement management, change control, facility configuration information management for CM activities. In order to improve safety of Nuclear Power Plant(NPP), it is necessary to manage change item systematically. Existing CM concept is focused on the NPP in operation. On the other hand, NPP under construction is difficult to efficiently manage the change because of different change process from varoius stake-holders. This research considers method of consolidation change process for NPP to ensure that approved changes are accurately reflected in the design requirements, facility configuration information, and the physical configuration.

  • PDF

Scheduling Optimization for Safety Decommissioning of Research Reactor (연구로 안전 해체를 위한 스케쥴링 최적화)

  • Kim, Tae-Sung;Park, Hee-Seoung;Lee, Jong-Hwan;Chang, Sung-Ho;Kim, Sang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.3
    • /
    • pp.67-75
    • /
    • 2006
  • Scheduling of dismantling old research reactor need to consider time, cost and safety for the worker. The biggest issue when dismantling facility for research reactor is safety for the worker and cost. Large portion of a budget is spending for the labor cost. To save labor cost for the worker, reducing a lead time is inevitable. Several algorithms applied to reduce read time, and safety considered as the most important factor for this project. This research presents three different dismantling scheduling scenarios. Best scenario shows the specific scheduling for worker and machine, so that it could save time and cost.

A Study on the Cost Analysis of risk facilities using e-Consequence Analysis - Focusing Steel pipe Industry (e-CA(e-Consequence Analysis)를 활용한 위험설비의 비용 분석에 관한 연구 : 강관제조업 사례를 중심으로)

  • Kwon, Hyeok Min;Hwang, Yong Woo;Lee, Ik Mo;Chun, Young Woo;Choi, Young Hun
    • Journal of the Korea Safety Management & Science
    • /
    • v.20 no.3
    • /
    • pp.27-36
    • /
    • 2018
  • The steel pipe manufacturing industry deals with facilities and materials. Especially thermal facilities are close to vapor cloud explosion (VCE) and may cause secondary damage to facilities because they deal with corrosive substances such as hydrofluoric acid, sulfuric acid and acid, fire, explosion, leakage etc. It is in danger. In this study, hazard identification method was conducted using HAZOP techniques and quantitative risk analysis was conducted using e-CA, a program that supports accident impact analysis. Equipment in the influence range of ERPG - 3 was determined to be a facility requiring replacement. It was decided that neutralization is necessary using slaked lime. Based on the cost of loss, We presented the proper replacement which is the timing of the dangerous facility. As a result, It was ideal to replace the facilities with 20 years of heat treatment facilities, one year of hydrofluoric acid storage tank, 20 years of sulfuric acid storage tank, and 5 years of hydrochloric acid storage tank.

A Study on the Improvement of Safety Management for Preventing Laboratory Accidents (연구실 사고 예방을 위한 안전관리 개선방안 연구)

  • Lee, Eun-Byul;Yoo, Byung-Tae;Yoon, Jun-Heon
    • Journal of the Korean Institute of Gas
    • /
    • v.24 no.4
    • /
    • pp.1-9
    • /
    • 2020
  • The Act on the Establishment of Laboratory Safety Environment was enacted in 2015 to prevent safety accidents occurring in laboratories. However, it is time for fundamental and comprehensive safety management measures since various systems for laboratory safety are operated at the same time. The purpose of this study is to propose effective improvement methods in terms of the safety management inspection system. The laboratory's safety management statutes were investigated and compared, and problems arising from differences in inspection systems were derived. Further, specific inspection items were compared separately from the facility aspect and the management aspect. The improvement method was proposed. As a result, although it was the same lab, it was managed by different tests at different times. There were differences in inspection items that focused on the structure and performance of chemical facilities, or on the management criteria such as storage of reagents and management of toxic materials. The problems and suggestions considered in this study are expected to help develop the safety management system for preventing laboratory accidents.

Development of underground facility information collection technology based on 3D precision exploration (3차원 정밀탐사 지하시설물 정보 수집 기술 개발)

  • Jisong RYU;Yonggu JANG
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.26 no.4
    • /
    • pp.56-66
    • /
    • 2023
  • Safety accidents are increasing, such as changes in groundwater levels due to construction work or natural influences, or ground cave-ins caused by soil runoff from old water supply and sewage pipes. In addition, underground facility management agencies must make efforts to improve the accuracy of underground information through continuous investigation and exploration in accordance with the Special Act on Enhanced Underground Safety Management. Accordingly, in this study, we defined the configuration of equipment and data processing method to collect 3D precise exploration underground facility information and developed 3D underground facility information collection technology to ensure accuracy of underground facilities. As a result of verifying the developed technology, the horizontal accuracy improved by an average of 6cm compared to the existing method, making it possible to acquire 3D underground facility information within the error range of the public survey work regulations.

3-D Temporary Facility Visualization Using BIM(Building Information Modeling) Technology

  • Kim, Hyun-Joo;Ahn, Hong-Seob;Kim, Woo-Young
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.37-42
    • /
    • 2011
  • The key role in safety management is to identify any possible hazard before it occurs by identifying any possible risk factors which are critical to risk assessment. It is well known that falsework (temporary facilities) in construction projects is fundamentally important. This planning/assessment process is considered to be tedious and requires a lot of attention due to the following reasons: firstly, the installation and dismantling of those facilities are one of the high risk activities in the job sites. Secondly, temporary facilities are generally not clearly delineated on the building drawings. Therefore, it is our strong belief that safety tools have to be simple and convenient enough for the jobsite people to manage them easily and be flexible for any occasions to be occurred at various degrees. In order to develop a safety identification system of temporary facilities, this research utilizes the BIM technology in retrieving important information by importing data from BIM models and use it in the safety planning stage.