• Title/Summary/Keyword: facility layout

Search Result 201, Processing Time 0.026 seconds

An Integrated AHP-VIKOR Methodology for Facility Layout Design

  • Shokri, Hamidreza;Ashjari, Behzad;Saberi, Morteza;Yoon, Jin Hee
    • Industrial Engineering and Management Systems
    • /
    • v.12 no.4
    • /
    • pp.389-405
    • /
    • 2013
  • A facility layout design (FLD) problem can be generally introduced as assignment of facilities (departments) to a site such that a set of criteria are satisfied or some objectives are minimized (maximized). Hence, it can be considered as a multi-criteria problem due to the presence of qualitative criteria such as maintenance or flexibility and quantitative criteria such as the total cost of handling material. The VIKOR method was developed to solve multiple criteria decision making problems with conflicting and non-commensurable (different units) criteria, assuming that compromising is acceptable for conflict resolution, the decision maker wants a solution that is the closest to the ideal, and the alternatives are evaluated according to all established criteria. This paper proposes a hierarchical analytic hierarchy process (AHP) and VIKOR approach to solve the FLD problem. A computer-aided layout-planning tool is adopted to generate the facility layout problems, as well as their quantitative data. The qualitative performance measures are weighted by AHP. VIKOR is then used to solve the FLD problem. Finally, the proposed integrated procedure is applied to three real-time examples.

Optimization Algorithms for Site Facility Layout Problems Using Self-Organizing Maps

  • Park, U-Yeol;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.664-673
    • /
    • 2012
  • Determining the layout of temporary facilities that support construction activities at a site is an important planning activity, as layout can significantly affect cost, quality of work, safety, and other aspects of the project. The construction site layout problem involves difficult combinatorial optimization. Recently, various artificial intelligence(AI)-based algorithms have been applied to solving many complex optimization problems, including neural networks(NN), genetic algorithms(GA), and swarm intelligence(SI) which relates to the collective behavior of social systems such as honey bees and birds. This study proposes a site facility layout optimization algorithm based on self-organizing maps(SOM). Computational experiments are carried out to justify the efficiency of the proposed method and compare it with particle swarm optimization(PSO). The results show that the proposed algorithm can be efficiently employed to solve the problem of site layout.

A Study on Facility Layout for Optimamization of Material Flow System (물류시스템 최적화를 위한 설비배치에 관한 연구)

  • Park, Se-Joon;Lee, Young-Hae;Hur, Sun;Lee, Moon-Hwan;Yu, Ji-Yong
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1998.10a
    • /
    • pp.162-165
    • /
    • 1998
  • We consider a facility layout problem for optimized material flow system design in the automated production system design. Existing facility layout algorithm have a weak point that arranged facilities have irregular shape or don't preserve their own shape and size. The proposed algorithm give a layout which is minimize total material handling cost and maximize space utility under preserving each facilities' own shape and size.

  • PDF

Ant Algorithm Based Facility Layout Planning (설비배치계획에서의 개미 알고리듬 응용)

  • Lee, Sung-Youl;Lee, Wol-Sun
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.13 no.5
    • /
    • pp.142-148
    • /
    • 2008
  • Facility Layout Planning is concerned with how to arrange facilities necessary for production in a given space. Its objective is often to minimize the total sum of all material flows multiplied by the distance among facilities. FLP belongs to NP complete problem; i.e., the number of possible layout solutions increases with the increase of the number of facilities. Thus, meta heuristics such as Genetic Algorithm (GA) and Simulated Annealing have been investigated to solve the FLP problems. However, one of the biggest problems which lie in the existing meta heuristics including GA is hard to find an appropriate combinations of parameters which result in optimal solutions for the specific problem. The Ant System algorithm with elitist and ranking strategies is used to solve the FLP problem as an another good alternative. Experimental results show that the AS algorithm is able to produce the same level of solution quality with less sensitive parameters selection comparing to the ones obtained by applying other existing meta heuristic algorithms.

  • PDF

A Layout Plan of a Pressure-fed Hot-firing Test Facility for the Performance Evaluation of a Combustion Chamber (연소기 성능평가를 위한 가압식 연소시험설비의 배치 계획)

  • Lee, Kwang-Jin;Cho, Nam-Kyung;Han, Young-Min
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2012.05a
    • /
    • pp.465-467
    • /
    • 2012
  • A layout plan of a pressure-fed test facility to carry out hot-firing test of liquid rocket engine combustion chamber and purpose of rooms located in the test building were proposed. The layout plan of suggested infrastructure in this paper was determined depending on the design of a vertical test facility to use the natural lay of the land and simulate the initial position of flight model.

  • PDF

FLASOM - Facility Layout by a Self-Organizing Map (FLASOM - 자기조직화 지도를 이용한 시설배치)

  • Lee, Moon-Kyu
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.2
    • /
    • pp.65-76
    • /
    • 1994
  • The most effective computer algorithms for facility layout that have been found are mainly based on the improvement heuristic such as CRAFT. In this paper, we present a new algorithm which is based on the Kohonen neual network. The algorithm firstly forms a self-organizing feature map where the most important similarity relationships among the facilities are converted into their spatial relationships. A layout is then obtained by a minor adjustment to the map. Some simulation results are given to show the performance of the algorithm.

  • PDF

A Study on the development of facility layout using practical constraints (현실제약조건을 이용한 설비배치안 개발 방법 연구)

  • Moon, Gee-Ju
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.19 no.1
    • /
    • pp.31-38
    • /
    • 1993
  • This paper presents a possible methodology to develop a facility layout using practical constraints. Those factors considered in the system are not only used for the evaluation of layout but also for the search to solution on the design process. Necessarily, this method develops practically feasible solutions with less iterations since the infeasible alternative layouts are rejected by the practical constraints before evolutions. The suggested method is implemented in FORTRAN for experimental purposes and the results are discussed in detail.

  • PDF

Cut tree approach for facility layout problem

  • Kim, Chae-Bogk
    • Korean Management Science Review
    • /
    • v.11 no.3
    • /
    • pp.55-65
    • /
    • 1994
  • Given the flow matrix, plant size and department sizes, the algorithms in this paper provide the layout with rectilinear distance. To construct automated facility design, cut tree approach is employed. A branch and bound computer code developed by Tillinghast is modifided to find the feasible fits of departments without shape distortion in the plant rectangle.

  • PDF

Detailed Analysis of the KAERI nTOF Facility

  • Kim, Jong Woon;Lee, Young-Ouk
    • Journal of Radiation Protection and Research
    • /
    • v.41 no.2
    • /
    • pp.141-147
    • /
    • 2016
  • Background: A project for building a neutron time-of-flight (nTOF) facility is progressing. We expect that the construction will start in early 2016. Before that, a detailed simulation based on the current architectural drawings was performed to optimize the performance of our facility. Materials and Methods: Currently, several parts had been modified or changed from the original design to reflect requirements such as the layout of the electron beam line, shape of the vacuum chamber producing a neutron beam, and the underground layout of the nTOF facility. Detailed analysis for these modifications has been done with MCNP simulation. Results and Discussion: An overview of our photo-neutron source and KAERI nTOF facility were introduced. The numerical simulations for heat deposition, source term, and radiation shielding of KAERI nTOF facility were performed and the results are discussed. Conclusion: We are expecting that the construction of the KAERI nTOF facility will start in early 2016, and these results will be used as basic data.

Preliminary study for Vertical Dynamic Site Layout Planning of High-Rise Building Construction (고층공사 가설시설물의 동적수직배치 최적화를 위한 기초연구)

  • Pyo, Kiyoun;Lee, Dongmin;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.39-40
    • /
    • 2018
  • The goal of site layout planning(SLP) is to maximize the productivity and efficiency of the construction by reducing travel distance and material handling cost and manpower. However, SLPs are static layout schemes, which cannot be reorganized during the construction process to correspond with errors, phase transition, changing working environments on the site. To solve this problem, researches on dynamic site layout planning(DSLP) are emerging. This preliminary study clarifies characteristics of temporary facility's variables to develop the vertical DSLP algorithm of high-rise building construction.

  • PDF