• Title/Summary/Keyword: excavation speed

Search Result 94, Processing Time 0.026 seconds

A study on the slot cutting in granite by high speed water jet (초고압수에 의한 화강석절삭에 대한 연구)

  • ;;Ryu Chang-ha
    • Tunnel and Underground Space
    • /
    • v.4 no.2
    • /
    • pp.92-101
    • /
    • 1994
  • Water jet has been employed in extraacton of minerals for many years but the applications of low pressure jent s ar emodfined to some fields. With increasing strength of equipment it is possible to consider the use of high speed water jets for cutting hard rock. The high speed water jet technology is applied to various engineering fiels such as precessing rocks, quarrying rocks, mechanical fracturing as wel as rock excavation under the sea. For slot cutting in rocks with high speed water jets it is necessary to establish the empirical formula for estiamation of the cutting depth. The cutting depth is influenced by cutting parameters such as driving pressure, traverse speed, standoff distance, and shape and diameter of nozzel. Tests were carried out with a variety of cutting parameters on three types of granite. Nozzle pressures ranged from 1,200 to 2,800 bar, traverse speeds from 0.45 to 10.38 cm/min, standoff distances from 4.5 to 13.5 mm, and three types of nozzle diameter were used.

  • PDF

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

The Characteristics of Long-term Deformation Behavior During Tunnel Excavation in the Pyroclastic Rock (화산쇄설암 구간에서 터널 공사 중 장기변형거동 특성 연구)

  • Jang, Sukmyung;Han, Heuisoo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.23 no.8
    • /
    • pp.23-28
    • /
    • 2022
  • In Korea, 70% of the land is mountainous and structures occupy a high proportion in railway and road construction. In particular, in recent years, the construction of high-speed railways and highways for high-speed driving is rapidly increasing. At the same time, the construction of tunnels is also increasing. The number of tunnel construction cases in which long-term deformation occurs after tunnel excavation is completed is increasing. The stability of these tunnel structures depends entirely on the characteristics of the rock surrounding the tunnel excavation. In the case of pyroclastic rock, which is the subject of this study, it is generally vulnerable to weathering and has a characteristic that its strength decreases over a long period of time. Tunnel design and construction planning considering the strength characteristics of pyroclastic rocks are essential. This study analyzed the cases of over-deformation that occurred at the tunnel site in the pyroclastic section. Based on this study, a plan for tunnel design and construction management in an area where pyroclastic rock exist in the future is presented.

Study on Load Carrying Capacity of Top Down Prefounded Columns (Top Down 선기둥의 지지력 산정방법에 관한 연구)

  • Hwang Hee-Sun;Rhim Hong-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.05a
    • /
    • pp.137-140
    • /
    • 2006
  • As underground construction is a large component of the cost of construction and a term of works in Top-Down construction, it is important to reduce the term of works in underground construction. The purpose of this study is to analyse buckling stress and load of prefounded columns as the process of excavation is changed, and propose a suitable process of excavation to increase the speed of works. When several floors are excavated, the valid buckling length of profounded column is increase and allowable buckling stress is decreased. The result shows that all columns are safe in buckling down to B3th story whether 2 stories or 3 stories are excavated straightly. However, several columns are not safe from B4th story when 2 or 3 stories are excavated straightly. With these results, a process can be designed that first B3 stories are excavated straightly, and then excavate B4th story putting concrete on B1st and B2nd story.

  • PDF

A Case Study on the Field Monitoring of the Deep Rock Excavation Site in Urban Area (도심지 대심도 암반 굴착현장에서의 Face Mapping 적용사례)

  • Kim, Tae-Seob;Kim, Hyung-Min;Jo, Choong-Sick;Kang, Tae-Seong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1307-1316
    • /
    • 2009
  • In this case, powerfulness quorum of destruction side which we have expected are supposed general limit value for rock floor when retaining of earth on the section of rock floor in the urban area. For digging in the urban area, there are a lot of dislocations to be disadvantage for safety of digging ants. The displacement of the pondside didn't converged with the phase of the excavation. Also, the speed of displacement got higher than the percentages of risk in the construction. So, we put into operation Face mapping for checking special quality of dislocations which appear on the digging ants. This results were used to decide a destruction in the case of the final excavation by analyzing with other results. It was possible to know the unstable distribution of a fault line in Face Mapping and to get powerful lens of a surface of discontinuity by tests indoors and outdoors. The results were also used to make a solution. Therefore, It's a successful example using the Partial TopDown for stable digging. And it is important that Face Mapping have to be practiced for solving the uncertainty of ground organization when digging design in the urban city.

  • PDF

Application for Self-Supported Retaining Wall Using Deep Cement Mixing (DCM(심층혼합처리공법)에 의한 자립식 흙막이 적용사례)

  • Jeong, Gyeong-Hwan;Kim, Yong-Wan;Shin, Min-Sik;Han, Kyoung-Tae;Kim, Tae-Hyo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.257-267
    • /
    • 2006
  • The earth retaining wall systems for excavation works in a populated urban area or a poor soil deposit can be limited due to various restriction. Thus there are various methods to be applied for them such as the soldier pile method, the diaphragm wall with counterfort and so on. In this study, the self-supported earth retaining wall using the DCM(Deep Cement Mixing) method, including its merits, demerits and some important characteristics occured in the design and the construction stage, was introduced. It might be reference for the other design and construction procedures using the DCM method.

  • PDF

Laboratory Experimental Test of the Applicability of a Trench Shield Machine for Open-cut Excavation Technology (개착 시공을 위한 트렌치 쉴드장비의 적용성 평가를 위한 실내실험)

  • Lee, Young-Min;Sagong, Myung;Kim, Cheol-Han;Song, Seung-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.213-223
    • /
    • 2016
  • Traffic jams occur frequently due to the dense populations of cities. Accordingly, the discomfort of citizens has increased. In order to minimize traffic inconveniences, various public transportation facilities have been suggested. In this paper, for the economical construction of a near-surface railway system, the design of a trench shield is developed and a review of its applicability is done by creating and testing trench shield equipment on a small scale. The trench shield consists of an excavation part, a shield part and an advancement part. To examine the applicability of the trench shield, a laboratory test is carried out. The results of the laboratory test confirm the possibility of reducing the construction time at open-cut construction sites through the excavation of the trench shield. Although the laboratory test is an indoor and relatively small-scale experiment, it is considered to be possible to secure a construction speed of 3m/day when the trench shield equipment is used.

Evaluation of Track Irregularity Effect due to Adjacent Excavation on Serviced Railway Line (철도시설물 인접굴착공사에 따른 운행선 궤도의 궤도틀림 영향 평가)

  • Choi, Jung-Youl;Park, Dong-Ryong;Chung, Jee-Seung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.4
    • /
    • pp.401-406
    • /
    • 2019
  • The three-dimensional precision numerical analysis was performed using the finite element model applied with the railway track model consisting of rails, sleepers, and track elastic springs(ballast, rail pad). As a result of analyzing the track deformation level of the existing tracks due to the excavation work adjacent to the railway facilities, it was found that the track irregularity evaluation criteria (allowed values) of both conventional and high-speed railways lines were satisfied. Based on the numerical analysis using the track model, it was analyzed that the results of the prediction of the track irregularity due to the excavation work and the level of the track deformation occurring at the actual site could be approximated as closely as possible.

Comparison of high speed rail tunnels in Korea with those on other high speed railways worldwide (국내와 외국고속철도 터널의 설계 및 시공사례 비교)

  • ;Kim, Byeong Ho;Choe, Jeong Hwan
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.3 no.2
    • /
    • pp.32-44
    • /
    • 2001
  • Most of the major aspects of the high speed rail tunnels in Korea, including such items as the tunnel geometry, excavation methods, primary support, final lining, drainage and waterproofing, are similar to the practices followed in other countries. The tunnels in Korea provide the largest net internal area $(107\;m^2)$ as compared to the other counties addressed in this paper. The effective adaptation and modification of international practices and designs, combined with the integration of domestic practices, has resulted in the successful construction of these large tunnels. The experience gained from the completed work to date on the high speed line in Korea, combined with international technology input, will help to ensure future tunnels are constructed in an efficient manner with adequate design measures implemented for the long-term operational life of the tunnels. As has occurred in these other countries, further improvements and modifications to the Korea high-speed railway tunnels will occur as experience is gained and new technology develops.

  • PDF

Analysis of the Correlation between the velocity speed of High-Speed Railways and the Suppressing Effect of lateral Displacement of retaining wall according to the Arrangement of Stabilizing Piles (억지말뚝의 배치에 따른 흙막이의 수평변위 억제효과와 고속철도의 속도와의 상관성 분석)

  • Son, Su-Won;Im, Jong-Chul;Seo, Min-Su;Hong, Seok-Woo
    • Journal of the Korean Geosynthetics Society
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2021
  • In urban areas, structures are installed deep underground in the lower part of the structure to utilize space. Therefore, a retaining wall is used to prevent earth pressure from the ground when constructing a structure. Due to the development of construction technology, retaining wall applied to excavation work are used to prevent danger such as falling rocks and landslides in temporary facilities when construction or retaining walls are installed. In general, the application of a retaining wall to a temporary facility during the embankment construction is the case of expanding an existing roads or railways. Therefore, it is necessary to study the retaining wall applied to the embankment construction such as the double-track site of the high-speed railway. In this study, two types of common one row H-pile retaining wall and two types of IER retaining wall were analyzed, and the stability of the retaining wall applied to the construction of double-track of the high-speed railway was analyzed. The earth retaining wall is a construction method that combines forced pile applied to the stabilization of the slope with the wall of the earth retaining wall. As a result of the analysis, the IER retaining wall had maximum lateral displacement of 19.0% compared to the type with H-plie installed only in the front while dynamic load was applied. In addition, the slower the speed of high-speed railway, the more displacement occurred, and the results show that more caution is needed when designing the ground in low-speed sections.