Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site (TBM 굴착 공법 적용 현장의 생산성 분석을 통한 암질별 굴진속도 및 직접공사비 분석)

  • Song, Young Sun;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.637-643
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based Oil the data analyzed TBM operating productivity, This research derived and presented excavation speed (m/day) by TBM diameter (3.0m, 3.5m, 3.8m) and rock. Also, based on the excavation speed (m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. When we perform a similar geological construction in the future, excavation speed and direct construction cost which were derived by TBM diameter and rock is thinking the effective utilization data to estimate construction cost and plan schedule management before the start of construction.

Analysis of Standard Cost and the Construction Period Applied TBM Excavation Method (TBM 굴착 공법 적용 구경별 표준 공사비 및 공사기간 분석 연구)

  • Park, Hong Tae
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.319-327
    • /
    • 2012
  • This research collected work drilling report of TBM method site developed by WRITH company to TBM equipment company in Germany and analyzed work operating productivity. Based the data analyzed TBM operating productivity, This research derived and presented excavation speed(m/day) by TBM diameter (2.6m, 3.0m, 3.5m, 5.0m, 8.0m) and rock. Also, based on the excavation speed(m/day) by TBM diameter, This research estimated a day direct construction cost and total direct construction costs by applying a direct construction cost which spent on per 1m. Based on hard rock 40.0%, soft rock 30.0%, usually rock 20%, weathered rock 10.0%, TBM boring velocity, m per cost, total construction period shall estimate the construction cost and the construction period by the effective use by diameter when future applying TBM method to the basic planning stages and in the preliminary design phase.

Analysis of Excavation Speed and Direct Construction Cost Based on the Operating Productivities of TBM Method Site - Diameter 5.0m Target (수로터널공사의 효율성 분석을 통한 굴진속도 및 직접공사비 분석 - 구경 5.0m 중심으로)

  • Park, Hong Tae;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.8 no.4
    • /
    • pp.328-335
    • /
    • 2012
  • The resource-based estimating based on standard unit price of construction work was estimated by multiplying the price per standard unit of work on the amount of labor, material, equipment use time. However, limitation of the resource-based estimating way does not adequately reflect the actual transactions prices. On the subject of water tunnel excavation as a new attempt to overcome these limitations, this study analyzed productivity by work type into cutter inspection/ exchange, TBM maintenance, TBM inspection/refueling, subsequent installations, tramcar, operating change, a cave-underground reinforcement / rock reinforcement, safety / meetings and analyzed actual cost estimating and the net advance rate based on this analysis result. Actual cost estimating calculation approach presented in this study can be utilized as a useful tool to predict the actual cost estimating in the TBM water tunnels field.

Laboratory Experimental Test of the Applicability of a Trench Shield Machine for Open-cut Excavation Technology (개착 시공을 위한 트렌치 쉴드장비의 적용성 평가를 위한 실내실험)

  • Lee, Young-Min;Sagong, Myung;Kim, Cheol-Han;Song, Seung-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.19 no.2
    • /
    • pp.213-223
    • /
    • 2016
  • Traffic jams occur frequently due to the dense populations of cities. Accordingly, the discomfort of citizens has increased. In order to minimize traffic inconveniences, various public transportation facilities have been suggested. In this paper, for the economical construction of a near-surface railway system, the design of a trench shield is developed and a review of its applicability is done by creating and testing trench shield equipment on a small scale. The trench shield consists of an excavation part, a shield part and an advancement part. To examine the applicability of the trench shield, a laboratory test is carried out. The results of the laboratory test confirm the possibility of reducing the construction time at open-cut construction sites through the excavation of the trench shield. Although the laboratory test is an indoor and relatively small-scale experiment, it is considered to be possible to secure a construction speed of 3m/day when the trench shield equipment is used.