• 제목/요약/키워드: excavation method

검색결과 1,056건 처리시간 0.063초

버팀굴착에서 횡방향 토압에 대한 스트러트 주형보의 영향 (Effects of Main Girder Beams with Struts on Lateral Earth Pressure in Braced Excavation)

  • 김기범;반재기;조성호;정영수;김석철
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.606-611
    • /
    • 2009
  • MiStrut is a new method to establish structural stability in designing braced excavations by making a rigid connection between top-level steel beams and soldier beams. MiStrut has a function of working as a strut as well as supporting cover plates of top-level steel beams. The structural mechanism of MiStrut is supposed to reduce flexural deformation of soldier beams, which may lead to reduced lateral earth pressures behind excavation. In this research, for verification of the performance of MiStrut, shear-wave velocities of subsurface soil before and after excavation was compared. The rigid connection of main girder beams with soldir beams reduced shear-wave velocity by 67% and lateral earth pressures by 90%, which indicates that MiStrut is effective development in reducing lateral earth pressures on braced excavation.

  • PDF

원심모형실험에 의한 지하굴착 붕괴양상에 관한 계측 및 해석 (Monitoring & Analysis on Excavation Failure Modes by Centrifugal Model Experiment)

  • 허열;안광국;이처근
    • 한국안전학회지
    • /
    • 제13권3호
    • /
    • pp.135-142
    • /
    • 1998
  • This paper is to investigate the failure surface and modes in a soil mass by a excavation of the model ground. To study the failure surface for the excavated slope, centrifugal model tests were performed by changing the angle of the excavated slope(50, 75, $90^{\circ}$) and the ground condition($D_r$=60, 90%, dry and submerged ground). Excavation was simulated during the centrifuge tests by operating a valve that allowed the zinc chloride solvent to drain from the excavation. Results of model tests were compared with those obtained with theoretical solutions using limit equilibrium analysis method. The results of model tests show that, there is a failure to create a straight line in the low angle of excavated surface and a create a circle as the angle increases. Also, as the angle of excavated surface is increasing, the angle of the failure surface increases. The failure length in the submerged ground increases approximately 1.10~1.34 times more than that of the dry ground.

  • PDF

A Study on Behavioral Characteristics of Track Roadbed according to Steel Pipe Press-in Excavation during Construction of Underground Railway Crossing

  • Kim, Young-Ha;Eum, Ki-Young;Kim, Jae-Wang
    • International Journal of Railway
    • /
    • 제6권2호
    • /
    • pp.69-77
    • /
    • 2013
  • In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.

기계굴착공법을 적용한 현장타설말뚝 시공시 부조화 발생요인 분석 및 대응 방안 (Analysis and Countermeasures for the Trouble Factors of the Spot Installation Pile Using Machine Excavation Method)

  • 박홍태;손창백
    • 한국건축시공학회지
    • /
    • 제9권4호
    • /
    • pp.75-83
    • /
    • 2009
  • 현재 기계굴착공법인 올케이싱, 어스 드릴, 역순환공법이 널리 활용되고 있음에도 불구하고, 시공 현장에서 발생되는 부조화로 인하여 말뚝의 품질이 저하되거나 부실시공이 빈번히 발생되고 있다. 본 연구에서는 이 문제를 줄이는 방법으로 올케이싱, 어스 드릴, 역순환공법을 중심으로 현장 콘크리트타설 말뚝 시공시 발생되는 부조화 종류별로 부조화 발생요인을 현장기술자들을 대상으로 설문조사를 수행 하였다. 그리고 설문분석결과를 토대로 부조화 종류별로 빈번히 발생되는 부조화 요인을 분석함으로서 대응방안을 제시하였다. 본 연구에서 분석된 자료는 향후 건설현장에서 기계굴착공법으로 시공될 때, 부조화를 최소화 할 수 있는 효과적인 자료가 될 것으로 사료된다.

실트질 지반에 굴착된 NATM 터널의 시공사례 연구 (A Case Study on Construction of a Tunnel Excavated in Silty Ground by the NATM)

  • 박종호;윤효석;박종인;이원규
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 1999년도 가을 학술발표회 논문집
    • /
    • pp.139-146
    • /
    • 1999
  • Geological and geotechnical surveys, in general, should precede the excavation to ensure the stability of the tunnel md should be followed up according to the various geological condition during the excavation. However actually the standard support patterns which were decided during the design phases used be insisted for the whole excavation phases in spite of the various geological conditions. When $\bigcirc$$\bigcirc$ tunnel was excavated up to 25m long, the severe displacement was generated in the Portal area of $\bigcirc$$\bigcirc$ tunnel and the tunnel face was pally collapsed. Therefore, this paper present the case study on construction associated with the Umbrella Arch Method used in silty ground by the NATM.

  • PDF

건주 시공법에 따른 시공품질 비교 분석 (The Construction Quality Comparison and Analysis by Electric Poles Construction Method)

  • 김점식;권세원;박용범;문성원;조성문;김도영;고지훈
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2009년도 추계학술대회 논문집
    • /
    • pp.247-249
    • /
    • 2009
  • Electric pole construction of distribution place is mainly operated by excavation work using auger crane and backhoe. Even though construction quality is affected by electric pole construction method and amount of excavation, construction is operated by workers' convenience in most of construction place. Therefore, in this paper, we analyze and compare effectiveness of electric pole quality using auger crane and backhoe when mechanized excavation through displacement experience of electric pole with ground strength.

  • PDF

수치해석 및 인공신경망 기법을 이용한 도심지 터널 굴착에 의한 침하영향 및 연도변 건물 안정성 평가 (A Study on the Influence of Ground Subsidence and Stability of Buildings by Tunnel Excavation in Urban Area using Numerical Analysis and Neural Network Method)

  • 박성룡;김은겸;사공명
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2007년도 추계학술대회 논문집
    • /
    • pp.585-594
    • /
    • 2007
  • This paper presents the methods which estimate the influence of ground subsidence and the stability of buildings by tunnel excavation in urban area. First, we study the behaviour of ground subsidence using neural network and numerical method. And we analyze the characteristic of both methods. Using the both methods, we evaluate the stability of buildings by subway tunnel excavation and we compare the results of the neural network and numerical analysis.

  • PDF

소일네일과 앵커로 보강된 붕적층 비탈면의 거동에 관한 수치해석 (Numerical Analysis on the Behavior of a Colluvium Slope Reinforced with Soil Nails and Anchors)

  • 장명환;김훈태;유남재
    • 산업기술연구
    • /
    • 제33권A호
    • /
    • pp.73-80
    • /
    • 2013
  • This paper is results of numerical analysis on the behavior of colluvium slope with combinations of soil nails and earth anchors during excavation. In order to maintain the stability of the colluvium cut, being composed of gravel and boulder and thus local in stability being expected during slope cut, temporary reinforcing method of soil nailing with shotcrete might be used. Subsequent method of cast-in-place facing with earth anchors can be used to maintain cut slope stable permanently. For the cut slope where these methods had been applied, the numerical techniques were applied to their behaviors and investigate the stability of the slope. Limit equilibrium methods were used to confirm to maintain the slope stability during and after excavation and application of those reinforcing methods. Another numerical technique of FEM was also used to find the stress and strain as well as deformation distribution in reinforcing materials and slope ground during excavation.

  • PDF

굴착순서에 따른 Top Down 선기둥 지지력 산정 (Load Carrying Capacity of Top Down Prefounded Columns on Different Excavation Schedule)

  • 임홍철;황희선
    • 한국건축시공학회지
    • /
    • 제6권4호
    • /
    • pp.45-52
    • /
    • 2006
  • Top Down method is more widely used in downtown construction, recently. As underground construction constitutes a significant portion of the total construction cost and time in Top Down construction, it is important to develop a construction method to reduce the time required in underground works. The purpose of this study is to analyze load carrying capacity of Top Down prefounded columns on different excavation schedule. When several floors are excavated, the valid buckling length of prefounded column is increased and allowable buckling stress is decreased. The result shows that all columns are safe in buckling down to B3 story whether 2 or 3 stories are excavated. However, several columns are not safe from B4 story when 2 or 3 stories are excavated straightly. With these results, a process can be designed that the first three stories in the basement are excavated, and then excavate B4 story after placing concrete on B1 and B2 floor.

P.C. Anchoring 공법을 활용한 사면안정대책 (The Slope Stability Establishment with P.C. Anchoring Method)

  • 박철숙;손재호;인영길;장두희
    • 대한지질공학회:학술대회논문집
    • /
    • 대한지질공학회 2002년도 정기총회 및 학술발표회
    • /
    • pp.61-73
    • /
    • 2002
  • 울산광역시 울주군 두동면 천전리 306번지 일대에 건설되는 대곡댐은 높이 52m, 길이 190m의 표면차수벽형 석괴댐이다. 대곡댐 건설사업과 관련하여 여수로 좌안사면 굴착공사를 시행 중 2000. 7. 23 13:00~7. 24. 04:00 67.0mm의 강우가 있은 후 Sta. No. 1~2, EL. 137~134m 지점에 균열이 발생하였다. 안정대책을 수립하고자 지표지질조사 및 평사투영법에 의한 안정성을 검토하고 굴착 후 예상되는 불안정 요소를 고려하여 사면의 부분적인 추가절취 및 Pre-stress가 가능한 SSL PC Anchoring에 의한 억지공법을 수립, 시공하였다.

  • PDF