• Title/Summary/Keyword: excavation method

Search Result 1,056, Processing Time 0.025 seconds

Case Analyses of the Selection Process of an Excavation Method (지하공사 사례를 기반으로 한 터파기 공법 선정프로세스 분석)

  • Park, Sang-Hyun;Lee, Ghang;Choi, Myung-Seok;Kang, Hyun-Jeong;Rhim, Hong-Cheol
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.101-104
    • /
    • 2007
  • As the proportion of underground construction increases, the impact of inappropriate selection of a underground construction method for a construction size increases. The purpose of this study is to develop an objective way of selecting an excavation method. There have been several attempts to achieve the same goal using various data mining methods such as the artificial neural network, the support vector machine, and the case-based reasoning. However, they focused only on the selection of a retaining wall construction method out of six types of retaining walls. When we categorized an underground construction work into four groups and added more number of independent variables (i.e., more number of construction methods), the predictability decreased. As an alternative, we developed a decision tree by analyzing 25 earthwork cases with detailed information. We implemented the developed decision tree as a computer-supported program called Dr. underground and are still in the process of validating and revising the decision tree. This study is still in a preliminary stage and will be improved by collecting and analyzing more cases.

  • PDF

A two-step interval risk assessment method for water inrush during seaside tunnel excavation

  • Zhou, Binghua;Xue, Yiguo;Li, Zhiqiang;Gao, Haidong;Su, Maoxin;Qiu, Daohong;Kong, Fanmeng
    • Geomechanics and Engineering
    • /
    • v.28 no.6
    • /
    • pp.573-584
    • /
    • 2022
  • Water inrush may occur during seaside urban tunnel excavation. Various factors affect the water inrush, and the water inrush mechanism is complex. In this study, nine evaluation indices having potential effects on water inrush were analysed. Specifically, the geographic and geomorphic conditions, unfavourable geology, distance from the tunnel to sea, strength of the surrounding rock, groundwater level, tidal action, cyclical footage, grouting pressure, and grouting reinforced region were analysed. Furthermore, a two-step interval risk assessment method for water inrush management during seaside urban tunnel excavation was developed by a multi-index system and interval risk assessment comprised of an interval analytic hierarchy process, fuzzy comprehensive evaluation, and relative superiority analysis. The novel assessment method was applied to the Haicang Tunnel successfully. A preliminary interval risk assessment method for water inrush was performed based on engineering geological conditions. As a result, the risk level fell into a risk level IV, which represents a section with high risk. Subsequently, a secondary interval risk assessment method was performed based on engineering geological conditions and construction conditions. The risk level of water inrush is reduced to a risk level II. The results agreed with the current tunnel situation, which verified the reliability of this approach.

Numerical study on stability and deformation of retaining wall according to groundwater drawdown

  • Hyunsung Lim;Jongjeon Park;Jaehong Kim;Junyoung Ko
    • Geomechanics and Engineering
    • /
    • v.33 no.2
    • /
    • pp.195-202
    • /
    • 2023
  • In this study, the ground settlement in backside of retaining wall and the behavior of the retaining wall were analyzed according to the method of groundwater drawdown due to excavation by using two-dimensional(2D) finite element analysis. Numerical analysis was performed by applying 1) fixed groundwater level, 2) constant groundwater drawdown, and 3) transient groundwater drawdown. In addition, the behavior of the retaining wall according to the initial groundwater level, ground conditions, and surcharge pressure in backside of retaining wall was evaluated. Based on the numerical analysis results, it was confirmed that when the groundwater level is at 0.1H from the ground surface (H: Excavation soil height), the wall displacement and ground settlement are not affected by the method of groundwater drawdown, regardless of soil conditions (dense or loose) and surcharge pressure. On the other hand, when the groundwater level is at 0.5H from the ground surface, the method of groundwater drawdown was found to have a significant effect on wall displacement and ground settlement. In this case, the difference in ground settlement presents by up to 4 times depending on the method of groundwater drawdown, and the surcharge load could increase the ground settlement by up to 1.5 times.

Total Management System for Earth Retaining Structures Using Observational Method (지반굴착 흙막이공의 정보화시공 종합관리 시스템)

  • 오정환;조철현;김기웅;백영식
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.2
    • /
    • pp.51-64
    • /
    • 2002
  • Observational results of ground movement during the construction were very different from those predicted during the analysis of design step because of the uncertainty of the numerical analysis modelling, the soil parameter, and the condition of a construction field, etc., however accurately numerical analysis method was applied for prediction of ground movement per the excavation step. Therefore, the management system through the construction field measurement should be achieved for grasping the situation during the excavation. Until now, the measurement system restricted by 'Absolute Value Management system'analyzing only the stability of present step has been executed. So, it was difficult to expect the prediction of ground movement fur the next excavation step. In this situation, this study developed 'The Management system TOMAS-EXCAV'consisted of 'Absolute value management system'analyzing the stability of present step and 'Prediction management system'expecting the ground movement of next excavation step and analyzing the stability of next excavation step by 'Back Analysis'. TOMAS-EXCAV could be applied to all the uncertainty of earth retaining structures analysis by connecting 'Forward analysis program'and 'Back analysis program'and optimizing the main design variables using SQP-MMFD optimization method through measurement results. The applicability of TOMAS-EXCAV was confirmed by back analysis selecting two earth retains construction fields.

A Study on the Restraint Effect on Lateral Displacement of an Inclined Earth Retaining Structure Integrated with Soil Nailing in Sandy Ground (사질토지반에 설치된 소일네일 복합형 IER의 수평변위 억제효과에 관한 연구)

  • Park, Tae-Keon;Im, Jong-Chul;Yoo, Jae-Won;Kim, Chang-Young;Kang, Sang-Kyun;Lee, Woo-Je
    • Journal of the Korean Geotechnical Society
    • /
    • v.33 no.10
    • /
    • pp.33-47
    • /
    • 2017
  • A self-supported temporary excavation method called IER is normally applicable to excavation depth ranging from 6.0 m to 7.0 m though the method depends on ground condition and overburden load. Combining IER with another method is required in deeper excavation depth in order to maintain the structural stability of the IER. In this study, we performed model tests and 3D FE analysis to check the stability of the IER adopting soil nailing method, and to propose its effective installation method. The lateral displacement of the IER using soil nailing decreased by 92% of that of IER without soil nailing. Optimum design is possible for both economic feasibility and stability when interval spacing and length of soil nails is $1.5m(S_h){\times}0.75m(S_v)$ and 86% of excavation depth, respectively. Excavation depth using IER increases 1.71 times by adopting soil nailing in increment of lateral displacement of IER right before the last excavation stage.

Improvement Plan of Excavation Performance Based on Shield TBM Performance Prediction Models and Field Data (쉴드 TBM 성능예측모델과 굴진자료 분석을 통한 굴진성능 개선방안)

  • Jung, Hyuksang;Kang, Hyoungnam;Choi, Jungmyung;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.11 no.2
    • /
    • pp.43-52
    • /
    • 2010
  • Shield method is the tunnel boring method that propels a steel cylinder in the ground and excavates tunnels at once. After Marc Isambard Brunel started using the method for the Thames Riverbed Tunnel excavation in London, many kinds of TBM (Tunnel Boring Machine) developed and applied for the construction of road, railway, electricity channel, pipeline, etc. In comparison with NATM concept that allows to observe ground condition and copes with difficulty. The machine selected before starting construction is not able to be changed during construction in shield TBM. Therefore the machine should be designed based on the ground survey result and experiment, so that the tunnel might be excavated effectively by controlling penetration speed, excavation depth and cutter head speed according to the ground condition change. This research was conducted to estimate penetration depth, excavate speed, wear of disc cutter on Boondang Railway of the Han Riverbed Tunnel ground condition by TBM performance prediction models such as NTNU, $Q_{TBM}$, Total Hardness, KICT-SNU and compare the estimated value with the field data. The estimation method is also used to analyze the reason of poor excavation efficiency at south bound tunnel.

Prediction and Field Measurement on Behaviour of Soft Clay during Deep Excavation (연약점성토지반에서의 깊은굴착에 따른 지반거동의 예측과 현장계측)

  • 정성교;조기영;정은용
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.5
    • /
    • pp.111-124
    • /
    • 1999
  • When deep excavation adjacent to an existing structure is performed, it is very important to minimize damage on the structure through the prediction of ground movement. In this paper, finite element analysis was performed to predict the ground movement, based on the data from site investigation and laboratory tests, when deep excavation close to a buried water tank was carried out in soft clay ground. The movement and stabilities of the soil-cement wall(SCW) and the adjacent structure were checked using the results of the analysis and the field measurement. The comparison between the measured and the predicted ground movements showed the significance of the excavation procedure and lowering of water level in the analytical model. In the future, it is needed to improve the prediction method for better estimation of the ground movement.

  • PDF

Stability Evaluation of Sheet-pile Walls during Excavation Works in Soft Ground (연약지반 굴착시 강널말뚝 흙막이벽의 안정성 평가)

  • Hong, Won-Pyo;Kim, Dong-Wook;Song, Young-Suk;Lee, Jae-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1442-1447
    • /
    • 2005
  • Based on the field measuring data obtained from excavation sections in Inchon International Airport project, the relationships between the horizontal displacement of sheet-pile walls and the deformations of soft ground around the excavation were investigated. The horizontal displacements of walls according to supporting method are largely occurred in order of anchors, anchors with struts, and struts. The depths of maximum horizontal displacement are varied with supporting systems. If the stability number shows lower than ${\pi}$, the maximum horizontal displacement and the velocity of maximum horizontal displacement are respectively developed less than 1% of excavation depth and 1mm/day. When the stability number shows lower than ${\pi}+2$, the maximum horizontal displacement and the velocity are respectively developed less than 2.5% of excavation depth and 2mm/day. Also, when the stability number shows more than ${\pi}+2$, the maximum horizontal displacement and the velocity are rapidly increased.

  • PDF

Finite Element Method for the Analysis of Deep Excavation in Urban Environment (도심지 굴착에 따른 토류구조물 및 인접지반의 유한요소 해석기법)

  • Lee, Bong-Ryeol;Kim, Gwang-Jin;Kim, Hak-Mun
    • Geotechnical Engineering
    • /
    • v.13 no.5
    • /
    • pp.35-44
    • /
    • 1997
  • A finite element computer program is developed for the specific analysis of earth retaining structures in urban excavation. Unlike the existing multi -purpose FEM programs, the newly developed program (EM) consists of very simple and easy data processing system for the urban excavation. A non-linear material model(GDHM, Generalized Decoupled Hyperbolic Models is deviloped and implemented in the program EM. The results of large scale model tests for earth retaining structures are used for the vertification of EM along whit GDHM, and the results were satisfactory, but it was found that the program EM needs minor modification for the improvement of its accuracy.

  • PDF

A Control Value Analysis on the Horizontal Displacement of Braced Excavation Walls Used In Korea (국내 적용되고 있는 흙막이구조물의 수평변위에 대한 관리기준치 분석)

  • Jeong, Sang-Guk;Yang, Jae-Hyouk;Kim, Ju-Hyun;Kim, Jong-Soo
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.169-176
    • /
    • 2001
  • This study aims to present a more reasonable control value than the exiting one by comparing and analyzing control values and field instrument8tion values of the whole excavation depth of the four case sites, using geometric averaging as a statistical method. The range of the study is confined to the horizontal displacement of braced excavation walls among a variety of items, prescribed in the control values by approximately of the allowable and design values, and by safety factors. As a result, it is desirable to revise 70, 90, and 100 percent of LEVEL I, II, and III, respectively. The horizontal displacement values of the allowable and design values approximations should change to 104, 133, and 148 percent of the allowable and design values, respectively. In addition, modifying the horizontal displacement control value of the braced excavation walls is not needed. The horizontal displacement value, presented in the control value as a safety factor, is now 1.19, as it has a slight difference from the present value.

  • PDF