Effects of Main Girder Beams with Struts on Lateral Earth Pressure in Braced Excavation (버팀굴착에서 횡방향 토압에 대한 스트러트 주형보의 영향)

  • Kim, Gi-Beom;Ban, Jae-Ki;Joh, Sung-Ho;Chung, Young-Soo;Kim, Seok-Chul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.606-611
    • /
    • 2009
  • MiStrut is a new method to establish structural stability in designing braced excavations by making a rigid connection between top-level steel beams and soldier beams. MiStrut has a function of working as a strut as well as supporting cover plates of top-level steel beams. The structural mechanism of MiStrut is supposed to reduce flexural deformation of soldier beams, which may lead to reduced lateral earth pressures behind excavation. In this research, for verification of the performance of MiStrut, shear-wave velocities of subsurface soil before and after excavation was compared. The rigid connection of main girder beams with soldir beams reduced shear-wave velocity by 67% and lateral earth pressures by 90%, which indicates that MiStrut is effective development in reducing lateral earth pressures on braced excavation.

  • PDF

Monitoring & Analysis on Excavation Failure Modes by Centrifugal Model Experiment (원심모형실험에 의한 지하굴착 붕괴양상에 관한 계측 및 해석)

  • Heo, Y.;Ahn, K.K.;Lee, C.K.
    • Journal of the Korean Society of Safety
    • /
    • v.13 no.3
    • /
    • pp.135-142
    • /
    • 1998
  • This paper is to investigate the failure surface and modes in a soil mass by a excavation of the model ground. To study the failure surface for the excavated slope, centrifugal model tests were performed by changing the angle of the excavated slope(50, 75, $90^{\circ}$) and the ground condition($D_r$=60, 90%, dry and submerged ground). Excavation was simulated during the centrifuge tests by operating a valve that allowed the zinc chloride solvent to drain from the excavation. Results of model tests were compared with those obtained with theoretical solutions using limit equilibrium analysis method. The results of model tests show that, there is a failure to create a straight line in the low angle of excavated surface and a create a circle as the angle increases. Also, as the angle of excavated surface is increasing, the angle of the failure surface increases. The failure length in the submerged ground increases approximately 1.10~1.34 times more than that of the dry ground.

  • PDF

A Study on Behavioral Characteristics of Track Roadbed according to Steel Pipe Press-in Excavation during Construction of Underground Railway Crossing

  • Kim, Young-Ha;Eum, Ki-Young;Kim, Jae-Wang
    • International Journal of Railway
    • /
    • v.6 no.2
    • /
    • pp.69-77
    • /
    • 2013
  • In this study, numerical analysis and model experiments were conducted to analyze behavioral characteristics acting on the track roadbed with excavation through steel pipe injection, a non-exclusive method of crossing construction under railroad as primary target. In model experiments that simulate injection excavation behaviors with an increase in the depth of soil cover, the upper displacement was measured by construction of the first and the second pipes in order to predict actual behaviors, and the behavior characteristics were verified through numerical analysis. The investigation results showed that surface displacement was smaller under the condition of higher soil cover. In the case of injecting two pipes, when the first pipe was injected, deformation of the surface increased linearly in both settlement and uplift experiments. However, when the second pipe was injected, the amount of change was found to be very small due to the relaxation and plastic zones around the first pipe. In addition, the results of numerical analysis on the same cross section with the model experiment found that the results of investigation into settlement ratio and volume loss were in very good agreement with those obtained by the model experiment.

Analysis and Countermeasures for the Trouble Factors of the Spot Installation Pile Using Machine Excavation Method (기계굴착공법을 적용한 현장타설말뚝 시공시 부조화 발생요인 분석 및 대응 방안)

  • Park, Hong-Tae;Son, Chang-Baek
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.75-83
    • /
    • 2009
  • Although a range of machine excavation methods are in wide use, including casing, earth drill and reverse circulation drilling, deterioration in pile quality and faulty construction can be often found these days because of trouble in the construction field. For this study, research was conducted in the form of a survey of construction engineers working in the field in order to identify the types and the causes of trouble by focusing on all casing, earth drilling and reverse circulation drilling. By analyzing the causes of trouble, countermeasures could be presented. The data and the analysts presented in this study could be effectively used for minimizing trouble in future machine excavation work during construction.

A Case Study on Construction of a Tunnel Excavated in Silty Ground by the NATM (실트질 지반에 굴착된 NATM 터널의 시공사례 연구)

  • 박종호;윤효석;박종인;이원규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.10a
    • /
    • pp.139-146
    • /
    • 1999
  • Geological and geotechnical surveys, in general, should precede the excavation to ensure the stability of the tunnel md should be followed up according to the various geological condition during the excavation. However actually the standard support patterns which were decided during the design phases used be insisted for the whole excavation phases in spite of the various geological conditions. When $\bigcirc$$\bigcirc$ tunnel was excavated up to 25m long, the severe displacement was generated in the Portal area of $\bigcirc$$\bigcirc$ tunnel and the tunnel face was pally collapsed. Therefore, this paper present the case study on construction associated with the Umbrella Arch Method used in silty ground by the NATM.

  • PDF

The Construction Quality Comparison and Analysis by Electric Poles Construction Method (건주 시공법에 따른 시공품질 비교 분석)

  • Kim, Jeom-Sik;Kwon, Se-Won;Park, Yong-Beom;Mun, Sung-Won;Jo, Seong-Mun;Kim, Do-Young;Ko, Ji-Hoon
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.247-249
    • /
    • 2009
  • Electric pole construction of distribution place is mainly operated by excavation work using auger crane and backhoe. Even though construction quality is affected by electric pole construction method and amount of excavation, construction is operated by workers' convenience in most of construction place. Therefore, in this paper, we analyze and compare effectiveness of electric pole quality using auger crane and backhoe when mechanized excavation through displacement experience of electric pole with ground strength.

  • PDF

A Study on the Influence of Ground Subsidence and Stability of Buildings by Tunnel Excavation in Urban Area using Numerical Analysis and Neural Network Method (수치해석 및 인공신경망 기법을 이용한 도심지 터널 굴착에 의한 침하영향 및 연도변 건물 안정성 평가)

  • Park, Sung-Ryong;Kim, Eun-Kyum;Sa, Gong-Myung
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.585-594
    • /
    • 2007
  • This paper presents the methods which estimate the influence of ground subsidence and the stability of buildings by tunnel excavation in urban area. First, we study the behaviour of ground subsidence using neural network and numerical method. And we analyze the characteristic of both methods. Using the both methods, we evaluate the stability of buildings by subway tunnel excavation and we compare the results of the neural network and numerical analysis.

  • PDF

Numerical Analysis on the Behavior of a Colluvium Slope Reinforced with Soil Nails and Anchors (소일네일과 앵커로 보강된 붕적층 비탈면의 거동에 관한 수치해석)

  • Jang, Myoung-Hwan;Kim, Hoon-Tae;Yoo, Nam-Jae
    • Journal of Industrial Technology
    • /
    • v.33 no.A
    • /
    • pp.73-80
    • /
    • 2013
  • This paper is results of numerical analysis on the behavior of colluvium slope with combinations of soil nails and earth anchors during excavation. In order to maintain the stability of the colluvium cut, being composed of gravel and boulder and thus local in stability being expected during slope cut, temporary reinforcing method of soil nailing with shotcrete might be used. Subsequent method of cast-in-place facing with earth anchors can be used to maintain cut slope stable permanently. For the cut slope where these methods had been applied, the numerical techniques were applied to their behaviors and investigate the stability of the slope. Limit equilibrium methods were used to confirm to maintain the slope stability during and after excavation and application of those reinforcing methods. Another numerical technique of FEM was also used to find the stress and strain as well as deformation distribution in reinforcing materials and slope ground during excavation.

  • PDF

Load Carrying Capacity of Top Down Prefounded Columns on Different Excavation Schedule (굴착순서에 따른 Top Down 선기둥 지지력 산정)

  • Rhim, Hong-Chul;Hwang, Hee-Sun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.4 s.22
    • /
    • pp.45-52
    • /
    • 2006
  • Top Down method is more widely used in downtown construction, recently. As underground construction constitutes a significant portion of the total construction cost and time in Top Down construction, it is important to develop a construction method to reduce the time required in underground works. The purpose of this study is to analyze load carrying capacity of Top Down prefounded columns on different excavation schedule. When several floors are excavated, the valid buckling length of prefounded column is increased and allowable buckling stress is decreased. The result shows that all columns are safe in buckling down to B3 story whether 2 or 3 stories are excavated. However, several columns are not safe from B4 story when 2 or 3 stories are excavated straightly. With these results, a process can be designed that the first three stories in the basement are excavated, and then excavate B4 story after placing concrete on B1 and B2 floor.

The Slope Stability Establishment with P.C. Anchoring Method (P.C. Anchoring 공법을 활용한 사면안정대책)

  • 박철숙;손재호;인영길;장두희
    • Proceedings of the KSEG Conference
    • /
    • 2002.04a
    • /
    • pp.61-73
    • /
    • 2002
  • Daegok dam is Concrete Face Rockfill Dam(C.F.R.D) of which 52m height, 190m length, that construction in beneath 306, Chanjeon-Ri, Dudong-Myeon, Ulju-Gun, Ulsan Metrocity. Left slope excavation of spillway have related to Daegok dam construction are developing crack in Sta. No. 1~2, EL. 134~137m after 67.0mm rainfall from 2000. 7. 23. 13:00 to 7. 24. 04:00. Surface geological survey and slope stability investigation with stereographic projection method in order of slope stability establishment. Partial supplement excavation and SSL. P. C. Anchoring method is able to pre-stressing are think about unstable element after excavation. This slope stability establishment is very successfully completion.