• Title/Summary/Keyword: estimating unit

Search Result 418, Processing Time 0.028 seconds

A Unit Touch Gesture Model of Performance Time Prediction for Mobile Devices

  • Kim, Damee;Myung, Rohae
    • Journal of the Ergonomics Society of Korea
    • /
    • v.35 no.4
    • /
    • pp.277-291
    • /
    • 2016
  • Objective: The aim of this study is to propose a unit touch gesture model, which would be useful to predict the performance time on mobile devices. Background: When estimating usability based on Model-based Evaluation (MBE) in interfaces, the GOMS model measured 'operators' to predict the execution time in the desktop environment. Therefore, this study used the concept of operator in GOMS for touch gestures. Since the touch gestures are comprised of possible unit touch gestures, these unit touch gestures can predict to performance time with unit touch gestures on mobile devices. Method: In order to extract unit touch gestures, manual movements of subjects were recorded in the 120 fps with pixel coordinates. Touch gestures are classified with 'out of range', 'registration', 'continuation' and 'termination' of gesture. Results: As a results, six unit touch gestures were extracted, which are hold down (H), Release (R), Slip (S), Curved-stroke (Cs), Path-stroke (Ps) and Out of range (Or). The movement time predicted by the unit touch gesture model is not significantly different from the participants' execution time. The measured six unit touch gestures can predict movement time of undefined touch gestures like user-defined gestures. Conclusion: In conclusion, touch gestures could be subdivided into six unit touch gestures. Six unit touch gestures can explain almost all the current touch gestures including user-defined gestures. So, this model provided in this study has a high predictive power. The model presented in the study could be utilized to predict the performance time of touch gestures. Application: The unit touch gestures could be simply added up to predict the performance time without measuring the performance time of a new gesture.

A Proposal of Modeling Guide of the Unit Space-based Preliminary Cost Estimation in Urban Renewal Mix-Used Development - Case Study on ○○ Transfer Station Complex - (복합용도 개발 도시재생 사업에서의 단위 공간 기반 개산견적 모델링 가이드 제안 - ○○시 ○○역 복합환승센터 사례를 중심으로 -)

  • Kang, Shin-Yeop;Ahn, Jae-Hong;Kim, Ju-Hyung
    • Journal of KIBIM
    • /
    • v.3 no.1
    • /
    • pp.11-20
    • /
    • 2013
  • Mix-used development in urban renewal project is done to effectively utilize the limited downtown. Generally unlike a single project, It features placing a large number of different facilities(residential, commercial, business, cultural, etc.) which is each other organically linked. The purpose of this study is to suggest the method of modeling guide for 3D preliminary cost estimation considering visual and intuitive judgement of space in mix-used development Urban Renewal project. In this research, introducing SME(Standard Module and Element) breakdown structure, FID(Finish Identity) for estimating building space unit-based quantity take off was implemented. It could narrow the discrepancy of opinion between the stakeholders with more accurate cost-estimates, comparing to the traditional methods.

A Study on the Resetting of Incremental Heat Rate Curve of Combined Cycle Unit by Combination (복합발전기 조합별 증분비 곡선 재설정에 관한 연구)

  • Hong, Sang-Beom;Choi, Jun-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.68 no.1
    • /
    • pp.8-12
    • /
    • 2019
  • Combined Cycle Unit(CC) generates the primary power from the Gas Turbine(GT) and supplies the remaining heat of the GT to the Steam Turbine(ST) to generate the secondary power from the ST. It plays a major role in terms of energy efficiency and Load Frequency Control(LFC). Incremental Heat Rate(IHR) curves of economic dispatch(ED) of CC is applied differently by GT/ST combination. But It is practically difficult because of performance test by all combinations. This paper suggests a reasonable method for estimating IHR curves for partial combinations(1:1~(N-1):1) using IHR curves when operating with GT alone(1:0) and with all(N:1) combinations of CC.

A Study on the Cost Estimate System Development Method for Nuclear Power Plant Construction Projects

  • Lee, Sang Hyun
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.133-137
    • /
    • 2017
  • Nuclear power plants in Korea are usually built based on a duplicated model; so the project cost data of the preceding unit can be used as reference when estimating the project cost for the succeeding unit. However, since the contracting method is oriented towards the price, empirical factors such as making top-down estimations using the reverse calculation method based on the completion cost of the preceding unit is dominant. In order to develop a project cost database to resolve such problems, the detailed cost boundary of the project cost data must be categorized by project and by system. This study proposes a method to connect the code of account with the base quantities and the IAEA account, and proposes a database structure for the development of a project cost estimation system. The estimation system developed in the future is expected to utilize the proposed project cost data structure.

  • PDF

Evaluation of Effective Rainfall Ratio Method for Estimating Unit Load from Paddy Fields (비우량 방법에 의한 논 오염부하 원단위 산정시 적용성 평가)

  • Jung, Jae-Woon;Yoon, Kwang-Sik;Yoon, Suk-Gun;Choi, Woo-Jung;Choi, Woo-Young;Huh, Yu-Jeong;Cho, Kyeong-Min;Hong, Jung-Jin
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.6
    • /
    • pp.849-854
    • /
    • 2009
  • Pollutant unit load (unit-load) reported by Ministry of Environment (MOE) in 1995 has been a useful method for watershed management and environmental policy decision. The unit-load has been estimated using effective rainfall ratio method. However, reliability of unit-load determined by the method has been criticized especially for paddy field and upland conditions. In this paper the unit-load of paddy field estimated by effective rainfall ratio method was compared with continuous monitoring data. Annual loads was simulated by the method choosing 5~6 storm events randomly from whole events collected. Probability distribution of difference between results by the method and measured data was investigated. The results showed that unit-load derived by the method was generally lesser than measured unit-load and showed wide variations. Therefore, unit-load estimation of paddy fields by effective rainfall ratio method need caution.

Tunnel Cost Estimating Model Based on Standard Section and Cost Variance Index (I) - Analysis Of Critical Cost Factors - (표준단면을 이용한 터널 공사비 예측모델 개발 (I) - 공사비 영향요인 분석 -)

  • Cho, Jeongyeon;Kim, Kyong Ju;Kim, Kyoungmin;Kim, Sang Kwi
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.665-675
    • /
    • 2008
  • The objective of this paper is to provide an approximate cost estimating model for tunnel that can be utilized both in quick construction cost estimating for design alternatives, and in evaluating efficiently the cost effects according to the environmental changes during design and construction stage. To meet this requirement, this study analyzes critical cost factors influencing tunnel construction costs. The cost factors include 7 elements such as rock drilling method, advancing method, type of detonator, loader capacity, unit weight and soil volume change factor, length of tunnel. This paper investigates the cost variance according to the change of the cost factors. The result is expected to be used in formulating approximate tunnel cost estimating model.

The Algorithm of Improvement of Production cost using Function based cost estimating (기능 분석에 따른 제품 원가 구조개선 알고리즘에 대한 연구)

  • Seo, Ji-Han;Lee, Jea-Myung;La, Seung-Hoon
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.4
    • /
    • pp.207-213
    • /
    • 2010
  • Now days, the marketing environment is rapidly changed. Therefore, a lot of companies try to reduce production cost. Especially, Design is a important activities in new product development. While the concepts of design for manufacturable and concurrent engineering have made significant advances in integrating the design function with other areas in the firm. There are still major gaps in timely and accurate costing information available to designers. Inappropriate design could result in high redesign cost and delay in product relation. The generation of design and improvement is a time-consuming and mentally exhaustion process. It involves combining design features to generate as many potential design as possible. As not all features combinations are feasible, decision-makers have to narrow down the potential solutions and subsequently select appropriate design for further development. This new study is composed of 3 steps aiming at the Low Cost Design of the product. The three steps are consisted that setting up the target Cost, estimating the current functional cost, the design of a unit's reviewing according to the priority of the difference between the target cost and the functional cost.

Simplified Model for the Weight Estimation of Floating Offshore Structure Using the Genetic Programming Method (유전적 프로그래밍 방법을 이용한 부유식 해양 구조물의 중량 추정 모델)

  • Um, Tae-Sub;Roh, Myung-Il;Shin, Hyun-Kyung;Ha, Sol
    • Korean Journal of Computational Design and Engineering
    • /
    • v.19 no.1
    • /
    • pp.1-11
    • /
    • 2014
  • In the initial design stage, the technology for estimating and managing the weight of a floating offshore structure, such as a FPSO (Floating, Production, Storage, and Off-loading unit) and an offshore wind turbine, has a close relationship with the basic performance and the price of the structure. In this study, using the genetic programming (GP), being used a lot in the approximate estimating model and etc., the weight estimation model of the floating offshore structure was studied. For this purpose, various data for estimating the weight of the floating offshore structure were collected through the literature survey, and then the genetic programming method for developing the weight estimation model was studied and implemented. Finally, to examine the applicability of the developed model, it was applied to examples of the weight estimation of a FPSO topsides and an offshore wind turbine. As a result, it was shown that the developed model can be applied the weight estimation process of the floating offshore structure at the early design stage.

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

Productivity Analysis on the Standard Quantity-Per-Unit Costing Method and Work Crew Combination Method : Focused on Non-Vibration Mass Excavation Method (무진동굴착공법의 일위대가방식과 작업조방식의 생산성 비교 분석)

  • Lee, Dong Wook;Cho, Hong Jun;Lee, Keun Jo;Kim, Nam-Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.457-468
    • /
    • 2011
  • Recently, the non-vibration mass excavation method is used on sewage pipes and road construction sites in Jeju. However, a construction cost estimation based on the unit quantity does not provide a proper unit price. In this study, a comparison of the productivity of the standard quantity-per-unit costing method and the one of the work crew combination method was made based on the site monitoring of the non-vibration mass excavation method that is used in construction sites near Jeju. For this, data of 35 sites were collected: a regression equation was derived from the 30 data, and verification was carried out through the remaining 5 data. The analysis concluded that a day's workload is $16.43m^3$. In addition, a combination of the equipment considering the site conditions and the amount of labor, which varies with the number of work crew was obtained in order to estimate the construction cost of the work crew combination method. The construction cost was calculated based on the one-day workload ($16.43m^3$) derived from the regression analysis. The cost then was analyzed and compared with the standard quantity-per-unit costing method.