• Title/Summary/Keyword: estimate cost

Search Result 1,644, Processing Time 0.029 seconds

An Estimation of Cost and Profit Functions under Cobb-Douglas Production Technology in the Coastal Fishing (Cobb-Douglas 생산기술특성하의 연안어선어업의 비용 및 이윤함수의 추정)

  • 김기수;강용주
    • The Journal of Fisheries Business Administration
    • /
    • v.25 no.2
    • /
    • pp.47-58
    • /
    • 1994
  • This paper tries to estimate cost and profit functions under Cobb - Douglas production technology in the coastal fishing, using duality theory of production technology and cost function. Therefore this paper estimates in advance the production functions with two input variables, the number of working persons per tonage(WEMP) and the number of fishing equipment per tonage(WEQU). Then this paper estimates profit function and implicit cost function using the estimated coefficients from production functions. The results of this study show that the annual average profit pertonage of long bag set fishing and trap fishing amount to 4.1 million won and 3.9 million won respectively.

  • PDF

Cost-Utility Analysis of Bosentan Versus Iloprost in Korean Patients with Pulmonary Arterial Hypertension (우리나라 폐동맥고혈압환자에 대한 Bosentan과 Iloprost의 비용-효용 분석)

  • Sohn, Hyun-Soon;Lee, Tae-Jin
    • YAKHAK HOEJI
    • /
    • v.54 no.2
    • /
    • pp.126-133
    • /
    • 2010
  • This study was conducted to analyze cost-utility of bosentan versus iloprost indicated for pulmonary arterial hypertension (PAH) in a Korean healthcare setting from a payer's perspective. We constructed a Markov model to estimate total costs and outcomes for 1-year time horizon in a hypothetical cohort of 50-year-old patients with PAH. Base analysis showed that bosentan resulted in KW 5.5 billions saving and 18 quality-adjusted life year (QALY) gains per 100 patients compared to iloprost. Bosentan as a dominant strategy was found to be robust through various sensitivity analyses.

Cost-Effectiveness of Paclitaxel plus Cisplatin as a Neoadjuvant Chemotherapy for Locally Advanced Head and Neck Cancer (국소진행성 두경부암에서 선행항암화학요법제로 사용되는 Paclitaxel과 Cisplatin 병용요법의 비용-효과성)

  • Sohn, Hyun-Soon;Lee, Tae-Jin
    • Korean Journal of Clinical Pharmacy
    • /
    • v.20 no.1
    • /
    • pp.30-38
    • /
    • 2010
  • This study was conducted to analyze cost-effectiveness of neoadjuvant chemotherapy for locally advanced head and neck cancer in Korean healthcare setting. We constructed a decision analytical model to estimate total costs and outcomes of paclitaxel+cisplatin (PC) or docetaxel+cisplatin+5-FU (DCF) for 2 years time horizon in 100 patient cohort with locally advanced head and neck cancer. Base analysis showed that cost savings of PC regimen were 379 million Korean Won and 231 million Korean Won in societal and payer's perspectives, respectively, compared to DCF regimen, and life saved was 0.18. PC regimen as a dominant strategy was found to be robust through sensitivity analyses.

A Quantitative ERRC Analysis Method via Requirements Cost Estimation (요구사항의 비용산출을 통한 정량적인 ERRC 분석 방법)

  • Eom, Jeong-Yong;Kim, Neung-Hoe;Lee, Dong-Hyun;In, Hoh Peter
    • Journal of Information Technology Services
    • /
    • v.8 no.1
    • /
    • pp.113-124
    • /
    • 2009
  • Value-based requirements engineering process, called The ViRE(Value-Innovative Requirement Engineering) was suggested to create an uncontested market using ERRC(Eliminate, Reduce, Raise, Create) requirements analysis. But ViRE did not provides a quantitative data analysis method for ERRC decision so as to make objective decisions for customers. In this paper, to solve this problem, we suggest a quantitative ERRC analysis method by estimating requirements cost. Our method defines user requirements and decides their weight. Then, it makes quality level table for all the identified requirements and function modules and estimate implementation cost based on their quality levels. Finally, assess each requirement's impact and then evaluate ERRC value. We could get the more objective ERRC values by evaluate the requirement weight. functional module weight, and implementation cost. And we proved the efficiency of our model by a case study, smart student ID system.

Cost Analysis on Warranty Policies Using Freund's Bivariate Exponential Distribution

  • Park, Minjae;Kim, Jae-Young
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.1
    • /
    • pp.1-14
    • /
    • 2014
  • Purpose: In this paper, the minimal repair-replacement warranty policy is used to carry out a warranty cost analysis with warranty servicing times and failure times that are statistically correlated to bivariate distributions. Methods: Based on the developed approach by Park and Pham (2012a), we investigate the property of the Freund's bivariate exponential distribution and obtain the number of warranty services using the field data to conduct the warranty cost analysis. Results: Maximum likelihood estimates are presented to estimate the parameters and the warranty model is investigated using a Freund's bivariate exponential distribution. A numerical example is discussed to deal with the applicability of the developed approach in the paper. Conclusion: A novel approach of analyzing the warranty cost is proposed for a product in which failure times and warranty servicing times are used simultaneously to investigate the eligibility of a warranty claim.

A Study on the Estimation Model of Cost of Energy for Wind Turbines (풍력발전기의 에너지 비용 산출에 대한 고찰)

  • Chung, Taeyoung;Moon, Seokjun;Rim, Chaewhan
    • New & Renewable Energy
    • /
    • v.8 no.4
    • /
    • pp.3-12
    • /
    • 2012
  • Large offshore wind farms have actively been developed in order to meet the needs for wind energy since the land-based wind farms have almost been fully developed especially in Europe. The key problem for the construction of offshore wind farms may be on the high cost of energy compared to land-based ones. NREL (National Renewable Energy Laboratory) has developed a spreadsheet-based tool to estimate the cost of wind-generated electricity from both land-based and offshore wind turbines. Component formulas for various kinds and scales of wind turbines were made using available field data. In this paper, this NREL estimation model is introduced and applied to the offshore wind turbines now under designing or in production in Korea, and the result is discussed.

Impact of shear wall design on performance and cost of RC buildings in moderate seismic regions

  • Mahmoud, Sayed;Salman, Alaa
    • Earthquakes and Structures
    • /
    • v.21 no.5
    • /
    • pp.489-503
    • /
    • 2021
  • This research aims to investigate the seismic response of RC shear wall buildings of 5-, 6-, 7-, 8-, 9-, and 10-story designed as conventional and ductile and located in moderate seismic zone in Saudi Arabia in accordance with the seismic provisions of the American code ASCE-7-16. Dynamic analysis is conducted using the developed models in ETABS and the design spectra of the selected zone. The seismic responses of a number of design variations are evaluated in terms of story displacements, drift, shear and moments of both conventional and ductile building models as performance measures and presented comparatively. In addition, pushover analysis is also performed for the lowest and highest building models. Cost estimate of ductile and conventional walls is evaluated and compared to each other in terms of weight of reinforcement bars. In addition, due to the complexity of design and installation of ductile shear walls, sensitivity analysis is performed as well. It is observed that conventional design considerably increases induced seismic responses as well as cost compared to ductile one.

USING QUANTITY ESTIMATE STATISTICAL MODELS FOR INFRASTRUCTURE LONG RANGE COST MANAGEMENT

  • Jui-Sheng Chou;Min Peng;James T. O'Connor;Khali R. Persad
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.808-813
    • /
    • 2005
  • Effective cost management requires reliable cost estimates at every stage of project development. The primary purpose of this research is to develop systematic modeling procedures and an automatic computing program for infrastructure estimating in the Texas Department of Transportation (TxDOT). The computing system toggles between project input information and segregated district unit prices for highway work item quantity estimates associated with earthwork and landscape, subgrade treatments and base, surface courses and pavement, structures, miscellaneous construction, and lighting, signing, markings and signals. This quantity-based approach was chosen because of the conventional approach lacking of quantity information until primary design is complete.

  • PDF

A Cost-aware Scheduling for Reservation-Based Long Running Transactions (예약기반 장기수행 변동처리를위한 비용인지 시간계획)

  • Lin, Qing;Pham, Phuoc Hung;Byun, Jeong Yong
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.1248-1251
    • /
    • 2011
  • Web Service technologies make the automation of business activities that are distributed across multiple enterprises possible. Existing extended transaction protocols typically resort to compensation actions to regain atomicity and consistency. A reservation-based transaction protocol is proposed to reduce high compensation risk. However, for a serial long running transaction processing, the resource that is reserved in the early stage may be released due to resource holding time expires. Therefore, our analysis theoretically illustrates a scheduling scheme that tries to prevent the loss of resource holding as well as gain an optimized execution plan with minimum compensation cost. In order to estimate cost of different schedules, we set up a costing model and cost metric to quantize compensation risk.

Design-Build Change Order Impacts in Highway Projects

  • Ryu, Kyeong Rok;Choi, Kunhee;Ryoo, Boong Yeol;Kang, Julian H.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.371-375
    • /
    • 2015
  • Design-Build (DB) has gained in popularity in roadway projects due to its defining advantage to improve communication and fast-track project delivery. However, very little is known about the impact of change order frequency and occurrence timing pertaining to DB projects. The study analyzes their impacts on project time and cost performance by conducting a rigorous numerical analysis drawing on 530 3R (rehabilitation, reconstruction, and resurfacing) projects completed between 2002 and 2011 in Florida by using a multiple linear regression. The results indicate that DB outperformed Design-Bid-Build in project cost as well as time. Critically, the regression analysis signifies that earlier change order occurrence caused more unfavorable impacts on schedule and cost. The proposed analyses and models will lead to the improved ability of agencies to quickly and more reliably estimate the potential change order impacts on schedule and cost.

  • PDF