• Title/Summary/Keyword: estimate cost

Search Result 1,649, Processing Time 0.036 seconds

Object-Parameter Integrated Schematic Estimation Model for Predicting Office Building Interior-finishing Costs (오브젝트-파라미터 통합 오피스 마감공사비 개산견적 모델)

  • Park, Sung-Ho;Koo, Kyo-Jin;Park, Sung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.11a
    • /
    • pp.159-165
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The Object-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by object supplementary and parameter work item. This research presents the Integrated Object-Parameter Schematic Estimation Model in the design development stage that can lead to more accurately estimate the cost through analyzing historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item using regression analysis. In addition, a case study is performed for the effectiveness as comparing the proposed model with the previous estimating model.

  • PDF

First Data On Direct Costs of Lung Cancer Management in Morocco

  • Tachfouti, N.;Belkacemi, Y.;Raherison, C.;Bekkali, R.;Benider, A.;Nejjari, C.
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.13 no.4
    • /
    • pp.1547-1551
    • /
    • 2012
  • Background: Lung cancer is the leading cause of cancer morbidity and mortality. Its management has a significant economic impact on society. Despite a high incidence of cancer, so far, there is no national register for this disease in Morocco. The main goal of this report was to estimate the medical costs of lung cancer in our country. Methods: We first estimated the number of annual new cases according to stage of the disease on the basis of the Grand-Casablanca-Region Cancer Registry data. For each sub-group, the protocol of treatment was described taking into account the international guidelines, and an evaluation of individual costs during the first year following diagnosis was made. Extrapolation of the results to the whole country was used to calculate the total annual cost of treatments for lung cancer in Morocco. Results: Overall approximately 3,500 new cases of lung cancer occur each year in the country. Stages I and II account for only 4% of cases, while 96% are diagnosed at locally advanced or metastatic stages III and IV. The total medical cost of lung cancer in Morocco is estimated to be around USD 12 million. This cost represents approximately 1% of the global budget of the Health Department. According to AROME Guidelines, about 86% of the newly diagnosed lung cancer cases needed palliative treatment while 14% required curative intent therapy. The total cost of early and advanced stages lung cancer management during the first year were estimated to be 4,600 and 3,420 USD, respectively. Conclusion: This study provides health decision-makers with a first estimate of costs and the opportunity to achieve the optimal use of available data to estimate the needs of health facilities in Morocco. A substantial proportion of the burden of lung cancer could be prevented through the application of existing cancer control knowledge and by implementing tobacco control programs.

Development of the Preliminary Cost Estimate Method for the Free-Form Building Facade Trade in Conjunction with the Panel Optimization Algorithm Process (곡면 최적화 알고리즘을 활용한 비정형 건축물 외장공사비 개산견적에 관한 연구)

  • Lim, Jang Sik;Ock, Jong Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.95-106
    • /
    • 2014
  • The outer surfaces of free form buildings contain panels with two-directional curvatures. To construct these panels, complex geometric surfaces should be divided into forms and sizes that can be manufactured and constructed efficiently. Because the bigger the curvatures of these panel, the more expensive the construction costs, these complex curvatures should go through optimal process of reinterpretation to minimize the curved surfaces with complex two-directional curvatures, which is called panel optimization. Small construction and design companies have trouble in calculating even rough estimate and cannot adjust expected construction cost of the panels based on comparison of design alternatives in conjunction with panel optimization process due to lack of knowledge and experience. This study conducts the research that can support designers' cost decision-making in the design stage of the free form buildings with respect to the panel optimization process. A 3D commercial application specialized to modeling free form shapes is used for the purpose.

A Software Maintenance Cost Estimation Model based on Real Maintenance Efforts (투입노력 양에 기반한 소프트웨어 유지보수 비용산정 모형)

  • Jeong, Eun-Joo;Yoo, Cheon-Soo
    • Journal of Information Technology Applications and Management
    • /
    • v.19 no.2
    • /
    • pp.181-196
    • /
    • 2012
  • The cost of software maintenance occupies about two thirds in the software lifecycle. However, it is not easy to estimate the cost of software maintenance because of various viewpoints about software maintenance, unclear estimation methods, and complex procedures. Until now, the cost estimation model has used compensation factors for software characteristic and environment on the basis of program size. Especially, most of existing models use maintenance rate of total software cost as a main variable. This paper suggests the software maintenance cost estimation model that uses the result of calculating real maintenance efforts. In this paper, we classify functional maintenance and non-functional maintenance as software maintenance activity type. For functional maintenance, present function point of target software is needed to evaluate. The suggested maintenance cost evaluation model is applied to a software case in public sector. This paper discusses some differences between our model and other modes.

A Study on the Development of PMO Cost Estimation Model (PMO 대가 산정모형의 개발)

  • Seo, Yong Won;Lee, Duck Hee
    • Journal of Information Technology Services
    • /
    • v.13 no.4
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

A Study on Safety Cos Estimation Using Process Risk Assessment for Polyol Process (polyol공정에 대한 위험성 평가에 의한 안저비용 산정에 관한 연구)

  • Lee, Jun-Suk;Lee, Young-Soon;Park, Young-Ku
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.1
    • /
    • pp.68-71
    • /
    • 2002
  • A research on accident loss calculation for polyol process without safety management activities, and safety cost estimation using process risk assessment has been implemented. In order to estimate a magnitude of loss, accident scenarios were made by combining result made from HAZOP Study method with accident possibility analysis results implemented with FTA. Also effect assessment was implement for accident consequence of each scenario. And minimum possible loss cost has been calculated when safety investment do or not. Result from cost-benefit analysis was shown as approximately \335 billion(=USS44,000 billion), as cost after subtracting safety management cost from minimum possible loss cost.

KF-16 Software Upgrade Cost Analysis (KF-16 항공기 SW성능향상사업 비용분석)

  • Min, Sung Ki;Lee, Cheol Woo;Dalton, Carl
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.18-23
    • /
    • 2006
  • The purpose of this study and report is to provide, to the MND, an independent cost analysis of modernizing software of F-16 fighter fleets to support the use of several weapon system options, including JDAM, AIM-9X and HARM Targeting System etc. The study analyzed each options with software sizing, software cost, enabling hardware cost, flight test cost, system engineering cost, and 3 strategies. And the study proposed and analyzed some alternative strategies: strategy1 is to modernize software only within existing electronic processing capability; strategy2 is a full upgrade of weapons avionics with plug compatible electronics; strategy3 is an approach defined to mirror the USAF Common Configuration Implementation Approach (CCIP). The recommended alternative is strategy2.

  • PDF

Evaluation of the Reliability of Distribution Power Systems Considering Composite Customer Interruption Cost

  • Choi Sang-Bong;Nam Kee-Young;Kim Dae-Kyeong;Jeong Seong-Hwan;Lee Jae-Duk;Ryoo Hee-Suk
    • KIEE International Transactions on Power Engineering
    • /
    • v.5A no.3
    • /
    • pp.286-292
    • /
    • 2005
  • As the power industry moves towards open competition, there has been a call for methodology to evaluate power system reliability by using composite interruption cost. This paper presents algorithms to evaluate the interruption cost of distribution power systems by taking into consideration the failure source and the composite customer interruption cost. From the consumer's standpoint, the composite customer interruption cost is considered as the most valuable index to estimate the reliability of a power distribution system. This paper presents new algorithms that consider the load by customer type and failure probability by distribution facilities while calculating the amount of unserved energy by customer type. Finally, evaluation results of unserved energy and system interruption cost based on composite customer interruption cost are shown in detail.

Construction Cost Estimate Modeling of Roundabout at Preliminary Design Stage in Jeju (제주도 내 회전교차로의 초기공사비 예측모델 개발)

  • An, Jin-Hong;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.4
    • /
    • pp.1299-1306
    • /
    • 2014
  • Recently, there are many roundabouts installation works which are ordered to provide convenient transportation to road users as well as to eliminate traffic accidents and traffic delays. This study propose an approximate construction cost estimation model for early stages of roundabout construction. The model is designed considering the conditions of the early stage roundabout construction sites in Jeju. The regression equation of approximate construction cost was derived through regression analysis of 25 design data of roundabout construction in Jeju, and it was analyzed to have a high prediction accuracy. Finally, results verifies high prediction accuracy of the derived regression equation. Difference between the estimation cost and the design cost was only 2.3%, 3.7%, and 5.8% that verifies the high accuracy of the proposed approximate construction cost estimation model.