• Title/Summary/Keyword: erection time

Search Result 71, Processing Time 0.035 seconds

Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

Erection Method for Marine Section of Double Deck Warren Truss in Young Jong Grand Bridge (영종대교 복층 Warren Truss 해상구간 가설공법)

  • Kim Jeong-Woong;Seo Jea-Hwa;Yang Mu-Seok;Yuk Il -Dong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.232-239
    • /
    • 2001
  • Young Jong Grand Bridge is approach traffic road of New Inchon International Airport which covers hub airport function in northeast asia. The total span length of this bridge is $4,420{\cal}m$ and this main bridge type is, the first in the world, Double Deck Self Anchored Suspension Bridge, designed as double deck systems to be arranged by road and railroad. Approach bridges to be connected with main span also are composed double deck steel truss and steel box girder to consider a continuity with this span. Our company erected $1,375{\cal}m$(about 60,000tons) of double deck steel truss bridge type which is composed by 6 traffic lane on upper deck and 4 traffic lane and Double track railroad on lower deck. The original installation method of this bridge was planed to install about 75 meters bridge blocks to use floating crane, after temporary bent was constructed between permanent piers. But this method which had to construct many temporary bents in the sea had the matter that construction periods can become lengthen and construction cost can be risen. To overcome the uncertainty to ensure high qualify of bridge and economic project execution, our company developed new bridge erection method to assure both quality control and economic construction work. The new erection method which was developed by us was one that could transport and install long bridge block, $120{\cal}m$ unit at a time and that temporary bent was not required. We hope that this paper is used as technical data which will erect bridge in the western sea and others marine region.

  • PDF

Erectile Dysfunction in Patients with Chronic Obstructive Pulmonary Disease (만성폐쇄성폐질환 환자에서 발기부전)

  • Rhee, Yang Keun;Kim, Jin Ho;Lee, Heung Bum;Lee, Yong Chul;Park, Jong Kwan
    • Tuberculosis and Respiratory Diseases
    • /
    • v.54 no.3
    • /
    • pp.304-310
    • /
    • 2003
  • Background : Recent discoveries on the physiology of an erection have demonstrated that the organic causes of impotence are more common, and psychogenic impotence is correspondingly less common than was formally believed. The incidence of sexual dysfunctions in chronic obstructive pulmonary disease (COPD) patients is largely unknown or may be perfunctorily attributed to the associated illness or to aging. This study investigated whether or not the impotence was related to the COPD itself as well as whether or not it nay stem from organic causes in a notable proportion of such patients. Methods : The sexual function was evaluated in 10 COPD patients and 10 normal control subjects. A nocturnal Rigi Scan was performed to evaluate the erectile function of each group. The level of hormones such as the free testosterone, prolactin and thyroid stimulating hormone (TSH) was measured, and a pulmonary function test and arterial blood gas analysis was performed. Results : The time duration and frequency of a penile erection were significantly lower in COPD patients than the controls (p<0.05). In addition, the $PaO_2$ levels correlated with the time duration of the penile erection. Conclusion : These results suggest that COPD is one of the causes of organic erectile dysfunction.

ANALYSIS OF THE PROCESS OF FABRICATION OF STEEL STRUCTURES USING AN AUTOMATIC CONSTRUCTION SYSTEM

  • Hak-Ju Lee;Yoonseok Shin;Wi Sung Yoo;Hunhee Cho;Kyung-In Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1081-1087
    • /
    • 2009
  • An automatic construction system in Korea is now at the stage of the full automation like in Japan, and an actual pilot project is going to be built in 2009. However, in developing a new construction system that has never been implemented before, there is a need to assess the performance and to consider the uncertainty of the system. The program evaluation and review technique (PERT) allows dealing with this uncertainty. Thus, this paper implements an analysis of the process of steel fabrication and makes suggestions for time-related problems arising from the analysis. The time required for steel erection by the automatic system was compared with that in the traditional method. In the result, finding out another construction process and improving robot performance were proposed to resolve the problems. The results will contribute to promoting the development of an efficient system for the new automatic construction system.

  • PDF

Case Study on Economical Fabrication and Erection of Steel Structure and Reduction in Field Erection Time (경제적 철골제작$\cdot$설치 및 공기단축 사례분석연구)

  • Ahn Jae-Bong;Choi Yoon ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.183-192
    • /
    • 2004
  • Even in Korea the number of steel structure buildings that allow internal space and easy change of their layouts in accordance with the purpose of buildings and box-type steel bridges constructed with thick plates with thickness in a rage just from a few $\beta$AE to \$100\beta$AE is increasing these days and therefore, domestic fabrication and processing technology of members for steel structures is being improved at a pace faster than in the past to meet the growing requirements of consumers for high reliability on quality control on the related steel structures. However, most domestic fabricators os steel structures who are turning out their steel products in accordance with the designs prepared by engineering companies in their respective works for the sake of cost cut more than anything else, hesitating to introduce any advanced new technology into themselves. In the case of the steel structure design application for small and mid-size buildings in particular, it is quite meaningful not only for those who are involved in steel structure business, but also for the people working at construction work fields to review the result of the study on the connections of steel structure members deigned to obtain superb quality of steel structures within short period for steel fabrication and erection at fields in economical ways, as there is a glowing tendency seeking standardization of connection of steel structure members as well as whole structure together with the development on design of construction system of buildings including their exterior and interior decoration materials, manufacture of the related members and fabrication technique structure. This paper has been prepared with the aim to review the peculiar characteristics of buildings constructed with the main frames of steel structures and actual cases of the change made ing the connections between steel structure columns and between columns and girder members in order to reduce the work period necessary for fabrication and erection of steel structures at the maximum as well as the some examples of steel structures fabricated through automatic welding by robots for box-type columns in addition to the description of the problems found in the course of fabricating those steel structures, suggesting possible counter-measures to solve them.

Time-Dependent Nonlinear Analysis of Cable-Supported Prestressed Concrete Frames (케이블로 지지된 PC뼈대의 시간의존적 비선형 해석)

  • Lee, Jae Seok;Kang, Young Jin
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.12 no.4
    • /
    • pp.33-47
    • /
    • 1992
  • A study for the material and geometric nonlinear analysis of segmentally erected cable-supported prestressed concrete plane frames including the time-dependent effects due to load history, creep, shrinkage, aging of concrete, and relaxation of prestressing steel and cable is presented. Updated Lagrangian formulation is used to account for the nonlinear behavior of the structure. For the time-dependent analysis. the time domain is divided into a discrete number of intervals, and a step-forward integration is performed as the solution progresses in the time domain. At each time step. a nonlinear finite element analysis is performed in the space domain. Segmental erection methods are implemented by providing the capability to change the configuration of the structure at any time step of the solution. The computer program CFRAME is developed and a series of numerical examples are presented to study the validity of the program.

  • PDF

Nonlinear Analysis of the Segmentally Erected Prestressed Concrete Box-Girder Bridges and Post-Processing (PC 박스거더교량의 시공단계별 비선형 해석 및 후처리 기법)

  • 오병환;강영진;이형준;이명규;홍기증;김영진;임선택
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.10a
    • /
    • pp.368-373
    • /
    • 1994
  • Recently, a large number of box girder bridges with cantilevered decks have been constructed. Especially, segmentally erected prestressed concrete box girder bridges are widely used as economic and aesthetic solutions for long span bridges. Segmental erection is a particularly attractive construction alternative in cases where continuously supported formwork is impractical or uneconomical. In segmentally erected bridges, the structural systems are changed as the construction stages are progressive and redistribution of member forces occurs due to time dependent effects of concrete and relaxation of prestressing steel. Then, in segmentally erected bridges, analysis are required at each construction states. In this study, nonlinear analysis progam of the segmentally erected prestressed concrete box girder bridges is developed in taking into account nonlinearity of material and geometry, time dependent effect of concrete and relaxation of prestressing steel.

  • PDF

Appliance of Slab tracks on the Prestressed Concrete Bridges (슬래브궤도의 콘크리트교량 적용성 검토)

  • Kim, Nam-Hoon;Lim, Young-Su;Shin, Yong-Joon
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1037-1043
    • /
    • 2007
  • The railroad systems with the ballast tracks have been widely used for a long time. But recently, the use of the slab track is being increased gradually with a technical developments. So, this paper deals with the appliance of the slab tracks on the railroad bridges. Firstly, review the design criteria of the railroad bridges related to the slab tracks for the stability and serviceability, based on DIN and EURO code. Then, perform the analysis of the railroad prestressed concrete bridges, and check whether the results of the analysis satisfy the design criteria. Finally, find the construction condition of bridges that all the design criteria are satisfied. As a result, to maintain the stability and serviceability of the bridges, bridges must have some restrictions, including a time of installation of the slab tracks. So, the construction schedule for the erection of the bridges will be carefully considered in case of the concrete railroad bridges with the slab tracks.

  • PDF

An Study on Basis for Demand Estimation of Lifetime Sports Facilities (생활체육시설의 수요예측을 위한 기초적 연구)

  • Min, Young-Gi
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.3 no.1
    • /
    • pp.15-22
    • /
    • 2003
  • The purpose of this study was to analyze basic conditions for the demand estimation erection of lifetime sports facilities. This is described the whole concept of lifetime sports(sport for all) for helping the understanding of its concept correctly. Firstly, second chapter was examined the significance, function and role of lifetime sports in modern society. Secondly, third and forth chapter was examined demand and participation of lifetime sports activities for demand estimation of lifetime sports facilities. Participation rate is on the rise by the increase in income and leisure time to some extent, but after that it stops rising. In other words, the same participation rate persists without additional increase in participation by the changes in time deepening and in the patterns of demand for lifetime sports activities.

  • PDF

Effects of Red Ginseng on Spatial Memory of Mice in Morris Water Maze (마우스의 공간인 지능에 대한 홍삼의 효과)

  • 진승하;남기열
    • Journal of Ginseng Research
    • /
    • v.20 no.2
    • /
    • pp.139-148
    • /
    • 1996
  • This study was designed to examine the effects of red ginseng total saponin and extract on spatial working memory in mice using Morris water maze. Two kinds of red ginseng saponin (No. 1 and No. 2) and three kinds of red ginseng extract (No. 1, No. 2 and No. 3) to have different PD/ PT ratio (No. 1=1.24, No.2=1.47 No.3=2.41) were prepared by mixing the different parts of red ginseng In different ratio. In acute administration of total saponin No. 1 or No. 2, escape time to reach to a hidden platform In a fixed location for training trials was significantly decreased as compared with control group and swimming time in the quadrant that had contained the platform was also significantly increased as compared with control group. In acute treatment of extract No. 1 or 1 No. 2, swimming time in the platformless quadrant was increased dose dependently as compared with control group, especially at dose of 200 mg/kg,bw swimming time was significantly Increased. Oral treatment of extract No. 1 (100 mg/kg, bw) for 7 days produced an increase of swimming time In the platformless quadrant but a decrease of swimming time in No.3-treated group (100 mg/kg, bw). These results show that red ginseng may improve spatial discrimination learning and spatial working memory of mice

  • PDF