초기 신체 구조 모델을 기반으로 한 신체 블록의 물량 정보 생성 및 블록 탑재 시물레이션 (Generation of the Production Material Information of a Building Block and the Simulation of the Block Erection Based on the Initial Hull Structural Model)

  • 노명일;이규열
    • 대한조선학회논문집
    • /
    • 제43권1호
    • /
    • pp.103-118
    • /
    • 2006
  • At the initial design stage, the generation process of the production material information of a building block and the simulation process of the block erection, which are required to perform the production planning and scheduling, have been manually performed using 2D drawings, based on the data of parent ships, and subjective intuition from past experience. To make these processes automatic, the accurate generation method of the production material information and the convenient simulation method of the block erection based on the initial hull structural model(3D CAD model), were developed in this study. Here, the initial hull' structural model was generated from the initial hull structural CAD system early developed by us. To evaluate the developed methods. these methods were applied to corresponding processes of a deadweight 300,OOOton VLCC. As a result. it was shown that the production material information of a building block can be accurately generated and the block erection can be conveniently simulated in the initial design stage.

Flutter stability of a long-span suspension bridge during erection under skew wind

  • Xin-Jun Zhang;Fu-Bing Ying;Chen-Yang Zhao;Xuan-Rui Pan
    • Wind and Structures
    • /
    • 제37권1호
    • /
    • pp.39-56
    • /
    • 2023
  • To ensure the wind stability of a long-span suspension bridge during deck erection under skew wind, based on the aerostatic and self-excited aerodynamic force models under skew wind, a computational approach of refined flutter analysis for long-span bridges under skew wind is firstly established, in which the effects of structural nonlinearity, the static wind action and full-mode coupling etc are fully considered, and the corresponding computational procedure is programmed. By taking the Runyang suspension bridge over the Yangtze River as example, the flutter stability of the bridge in completion under skew wind is then analyzed with the aerodynamic parameters of a similar bridge deck measured from the sectional model wind tunnel test under skew wind. Finally, through simulating the girder segments erected symmetrically from the midspan to towers, from the towers to midspan and simultaneously from the towers and midspan to the quarter points, respectively, the evolutions of flutter stability limits during the deck erection under skew wind are investigated numerically, the favorable aerodynamically deck erection sequence is proposed, and the influences of skew wind and static wind effect on the flutter stability of suspension bridge under construction are ascertained.

Application of Sensor Technology for the Efficient Positioningand Assembling of Ship Blocks

  • Lee, Sang-Don;Eun, Seong-Bae;Jung, Jai-Jin;Song, Ha-Cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • 제2권3호
    • /
    • pp.171-176
    • /
    • 2010
  • This paper proposes the application of sensor technology to assemble ship blocks efficiently. A sensor-based monitoring system is designed and implemented to improve shipbuilding productivity by reducing the labor cost for the adjustment of adequate positioning between ship blocks during pre-erection or erection stage. For the real-time remote monitoring of relative distances between two ship blocks, sensor nodes are applied to measure the distances between corresponding target points on the blocks. Highly precise positioning data can be transferred to a monitoring server via wireless network, and analyzed to support the decision making which needs to determine the next construction process; further adjustment or seam welding between the ship blocks. The developed system is expected to put to practical use, and increase the productivity during ship blocks assembly.

부산종합운동장 주경기장 케이블 지붕구조물의 시공 (Construction of Cable Roof Structure for Pusan Main Stadium)

  • 이주영;유상현
    • 한국공간구조학회논문집
    • /
    • 제2권1호
    • /
    • pp.51-58
    • /
    • 2002
  • Construction of roof structure, cable suspended structure, for Pusan main stadium is adapted a lifting method that is VSL lifting system. 5 processes are practiced for erection of the roof structure including the first lifting process for erection of upper cables and the second lifting process for erection of lower cables. Since all cables of this roof structure with two open spelter sockets are determined their length, some cable were wrong length, he roof structure would be unstable. But, At complete of erection for the roof structure each cable is attained to theoretical tension force with average 4% errors.

  • PDF

부하평준화 휴리스틱을 이용한 선박 탑재 일정계획 편성 연구 (A Study on the Application of Resource Leveling Heuristic for Ship Erection Scheduling)

  • 백태현;정귀훈;박주철
    • 산업공학
    • /
    • 제12권3호
    • /
    • pp.354-361
    • /
    • 1999
  • In this paper, resource leveling heuristics are developed for ship erection scheduling. The heuristics, which enable scheduling with limited resources, are composed of the gradual resource limit decrease anti the resource allocation. At first, earliest start(ES) schedule is derived by PERT to get initial resource limit. And then, the heuristics lower the resource limits by a given increment and derive a new schedule from day-by-day resource allocation procedure. The procedure is repeated until the project duration reaches at the given ship erection duration, called dock cycle. Through the application of the heuristics for real world ship erection projects, wc can observe significant improvement in resource leveling.

  • PDF

철골세우기의 현장생산성 측정 및 영향요인 분석 (Productivity Measurement and Analysis on Factors in Steel Erection)

  • 이지용;허영기;안방률
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.123-127
    • /
    • 2008
  • As buildings becoming higher and more enormous the portion of steel works has been increased, which makes the schedule planning and management more significant. However, in actual construction sites, management is more based on a manager's construction experience than productivity data accumulated in previous projects. Moreover, most of the existing studies also featured a theoretical approach rather than an analysis of data straightforwardly collected in sites. In this study, a steel-erection site was visited to collect productivity data. The study found that there were significant disparities between aboveground work productivity and underground work. However, the productivities of 'first node on ground' and 'second node on ground' were estimated similar. The productivity data collected and factors affecting the productivity will help managers to plan and control their similar steel-erection works. This study will also be beneficial for those performing related studies.

  • PDF

자립형 철골 접합부를 이용한 철골설치 방식의 경제성 평가에 관한 연구 (A Study on Economic Evaluation Method of Steel Erection Work using by Self-supported Steel Joint)

  • 김창기;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.3-7
    • /
    • 2009
  • Construction projects are being the skyscraper and the large size by limited site condition and developing construction technology. Therefore, Steel structure work is steadily increasing caused by easy to work and structural safety. However, steel-frame work has the large incidence of heavy accident potentially. Recently a research group has recently developed newly designed self-supported steel joint for enhancing safety of steel erection work. Before applying the steel joint in a construction site, economic evaluation should be performed. Thus, we proposed the method for measuring economic efficiency of the new steel joint and verified economic feasibility of the steel joint method through a case study. As a result, Steel erection method using by self-supported steel joint showed economic rather than the one using by H-beams.

  • PDF

파파베린과 테크니시움을 이용한 음경발기촬영술 (Erection Penogram with Papaverine and 99m Tc-HSA)

  • 최형기;정병하
    • Clinical and Experimental Reproductive Medicine
    • /
    • 제13권2호
    • /
    • pp.181-185
    • /
    • 1986
  • To estimate the penile blood flow changes during artificial with erection intracorporeal papaverine injection, we injected 99 m Technitium-Human Serum Albumin via antecubital vein simultaneously and calculate the radioisotope activity of the penis using computerized Gamma Camera. We classified the results into 3 groups according to the transit time, erection persistent time and venous index in 67 impotence patients. We defined the arteriogenic impotence with the delayed transit time (more than 600 seconds) in 13 patients and venogenic with the shortened erection persistant time (less than 200 seconds) and decreased venous index (less than 0.8) in 11 patients. The rest of them (43 patients) were regarded as equivocal impotence, probably nonvasculogenic or psychogenic.

  • PDF

PC 부재 설치계획의 영향요인 및 인과관계 분석 (Influence Factors and Ralationship Analysis on Precast Concrete (PC) Component Erection Plan)

  • 오진혁;이동주;김선국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.90-91
    • /
    • 2021
  • Large logistics centers are being built around the world. Most of these buildings have characteristics of long span and heavy load, and use PC (precast concrete) structure for quick construction. There have been few attempts to systematically analyze the various influencing factors of PC erection planning. In this study, we intend to analyze the influencing factors necessary for the creation of a sustainable PC erection planning algorithm.

  • PDF

선행 탑재장에서의 공간일정계획에 관안 연구 (A Study on Spatial Scheduling in the P.E. Stage)

  • 구충곤;윤덕영;배태규;조민철
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2004년도 학술대회지
    • /
    • pp.61-66
    • /
    • 2004
  • In this paper an effort is made to develop an innovative spatial arrangement concept pertaining to ship building industry. The spatial scheduling is the problem that concentrates on effective planning of available space and arrangements of blocks and in a priority manner. In order to create an effective spatial scheduling. a database providing the priority has to be available to make the erection sequence. Such a system works hand in hand with erection sequence generator program The erection sequence program works on the conventional network analysis method which uses a typical parent-children idea for the calculation of the ENT(possible earliest network start time) and LNT(possible latest network start time). This program works in a cyclic manner taking turns by calculating the ENT in upward trace and LNT on the return trace thereby generating the entire erection sequence diagram for the requisite problem The generated database serves as an input data for spatial scheduling problem. When the system works it takes into consideration the entire system based on heuristic concepts as mentioned. There system uses the spatial aspects such as the available area of the P. E area and plan area of the corresponding blocks and its priority of erection from the erection sequence generator program develops the spatial scheduling arrangement. In this paper using all these concepts an innovative spatial schedule development system developed.