Purpose: A lot of active researches have addressed the impact of a building on global environment, but most of the researches focus on a residential building and a large office building. Hereupon, this study assessed the impact on environment quantitatively through the analysis of input materials targeting a school building. Method:This study calculated embodied energy of input materials suggested in a construction statement on a school building using the input-output analysis. This study finally carried out environmental impact assessment by applying LCIA DB shown in the preceding researches to the calculated embodied energy. Result: The analysis result revealed that the environmental impact per unit area(/$m^2$) at a school building was $4.11E-02PE{\cdot}yr$, among which Construction was found to be $3.59E-02PE{\cdot}yr$, being analyzed to account for about 87% of the total environmental impact. Also, as a result of detailed environmental impact, the impact on global warming among the total environmental impact was analyzed to be high, accounting for about 76%.
The major causes of environmental and social conflicts were analyzed through the samples of the construction and the management for tidal power plant abroad and inland. Based on the results, the eco-friendly and socially acceptable policy instruments for decreasing the scope and intensity of the conflicts were explored. Regarding environment issues, it was found that the tidal power project resulted in decreasing in tidal range and area of intertidal zone and in damaging to tidal flat and wetland conservation area. Also there are the characteristic change of tidal current and biological effect, etc. The major environmental and social conflicts were resulted from the distrust of environmental results to environmental impact assessment and prior environmental review and the distrust of project feasibility study, and insufficient activities of public participation. In this study, introduction to joint fact-finding(JFF) was reviewed as the measure of minimizing environmental and social conflicts.
Environmental impact assessment is a regulation that is implemented to reduce harmful environmental impacts of development projects. However, The environmental value is difficult to quantify and the uncertainty, There is a problem of objectivity and reliability of the system is consistently pointed out. Therefore, the necessity of the data-based environmental impact assessment system is gradually increasing. Especially, environmental impact assessment is highly applicable to environmental spatial information because it contains about the development of a particular area. Also with the introduction of EIA Follow-up management system, there is a demand for a system for providing and utilizing environmental information in a time series. This study derives the necessity of information provision system and analyz existing environmental information utilization system based on the institutional characteristics of environmental impact assessment. And suggest ways to provide environmental spatial information to find policy implications for improving the limit of environmental impact assessment system.
Environmental impact assessment has been performed as preliminary assessment system in order to conserve environment value and minimize negative effect from development. Assessment based on data has been necessary to strengthen objectivity in process of Environmental impact assessment process. Furthermore extended use of spatial information in Environmental impact assessment system has been required through spatial information provided at government level and possibility connected with spatial information in Environmental impact assessment. However spatial information has not been systematically utilized in current Environmental impact assessment. Also the environmental impact assessment workers including assessment government employees, agencies of Environmental impact assessment document and review agencies lack an understanding in the concept of spatial information, so there is limit about their use to efficiently. In order to improve these limits in use of spatial information, this study suggested measures to standardize spatial information (coordinate and attribute table). To do so, based on coordinate and standards certified by the government, this study defined standard coordinates (GRS-80, central datum point, False East: 100000, False North: 200000) and established 9 default items. Lastly, the aforementioned standards were tested for actual environmental impact assessment projects. Standardization measures suggested in this study are expected to contribute to invigorate spatial information utilization in Environmental impact assessment and expand the scope of the assessment.
This paper demonstrates Environmental Impact Assessment (EIA) has to be applied for development projects with regard to the ecological, economical and social aspects before any decisions made in the project. Korea has confronted various environmental problems during the last fifteen years, even though EIA has been enacted since 1981. The role of impact assessment in planning and policy processes should be emphasized to investigate the magnitude and intensity of the adverse influences of economic development. In the Seoul Metropolitan Region, it is necessary to apply EIA all urban projects to reduce the adverse effects of urbanization. Special attention should be given to the climatological effects throughout the urbanization process in Korea to keep the urban area energy-efficient. This study intends not only to establish basic data for national-and regional-based land-use policy in the environmental aspects, but also to provide the basic data for the possible climate model (scenarios) that may provide spatial and temporal variability by analyzing the actual climatic record. There is a noticeable impact of urbanization on the atmospheric environment in the Seoul Metropolitan Region. In this sense, the climatic aspect must be taken into consideration in the process of EIA to mitigate the well-known climatic alterations of urbanization. Moreover, the techniques of assessment should be improved by developing geo-reference data sets to build models of the global climate in response to the man-made environmental change.
EIA should be regarded as an aid to improve the decision making processes because it seeks public opinion and external knowledge in order to ensure the maximum degree of fairness and balance in the final decision as much as possible. According to the above benefits, various decision making systems containing EIA concepts were developed in the area of ground water, traffic, disaster or accident and environment in Cheju Island. But because the development of various decision making systems can be the cause of new impact, it was studied the cause and impact of their development. The major reasons for developing the various decision making system like EIA are the lack of the consideration for the impact of project when it is selected project fulfilling EIA and the increase of the effort for the improvement in the professional quality for one subject without the comprehensive assessment among the subject related to environmental impacts. And the development of the various decision making systems like EIA has caused the several impacts like cost elavoration, the relay of project period, etc. Therefore, after it is improved the problems of present EIA on the comprehensive assessment, the various decision making systems like EIA should be integrated in EIA decision making system.
In Korea, military authorities have neglected to consider impacts of military projects on local communities and natural environment. Moreover, local communities have had difficulties in dealing with the Ministry of National Defense (MND), which was stubborn enough not to implement environmental assessment on their projects. In this situation, recent case, "EIA of Baekgol Division's Howitzer Fire Training Site" in the Supreme Court-in which judges upheld the Higher Court's decision that the division violated the Environmental Impact Assessment law by ignoring to implement EIA-reveals that military projects can no longer forgo environmental assessment. The decision has serious ramifications on the future of Environmental Impact Assessment in military-led projects. This paper examines the proper scope of EIA in military-led projects and, more specifically, fire training site and searches for how to improve it through 'probable error,' a military training method that is applied to real 'howitzer' fire training. Probable error of the artillery field manual is nothing more than an error that exceeded as often as it is not exceeded and its scientific method was demonstrated through real fire tests in the US. Army. If it is applied to improve assessment methods about the proper scope of EIA in military 'howitzer' fire training site, 'probable error' will improve effect prediction, mitigation and reliability.
In carrying out the prior review on environmental conditions for basic plan of public waters reclamation, the important item is review on conditions of location on prearranged reclaimed land. In this study, environmental assessment which needs careful consideration in the first stage of selecting location is presented by analyzing environmental impact assessment on public waters reclamation projects for about 10 years. The assessment index for alternative comparison is divided into two parts according to importance level. What is most important in alternative comparison is the comparison on direct influence due to reclamation. In other words, it figures out damaged extent of natural shoreline as well as intertidal and infralittoral zones. Comparing influence extent due to reclamation through the 1st comparison on this is regarded as to be important. In case there is no significant difference by alternatives through the 1st assessment, the 2nd assessment should be carried out. In the 2nd assessment indexes are damaged quantity of benthic organism, change in seawater current, erosion, accumulation and exchangeable rate of seawater. The plan for selecting optimal location which minimizes environmental influence in establishing public waters reclamation plan is demonstrated through model cases. For this, 3 districts which have similar environment and scale are selected, and then comparison on location alternative is made through environmental assessment index. In addition, the comparison on 3 arrangement alternatives are conducted, targeting certain areas. It is thought that carrying out comparison review on respective areas in the same cities and counties, not merely comparing arrangement plan by selecting 1 targeting area in advance, is the most appropriate. Besides, selection of arrangement plan considering environment, which minimizes damage of natural shoreline and influence due to change of seawater current is required in alternative comparison on arrangement plan as well. In case of the prior review on environmental conditions though alternative comparison method presented in this study is carried out, it is safely said that the influence on ocean environment due to public waters reclamation can be minimized.
Journal of the Korean Society of Marine Environment & Safety
/
v.16
no.1
/
pp.49-55
/
2010
Marine oil spill accidents not only devastates marine ecosystem but also Ins significant adverse socio-economic impact on local community whose living is dependent on clean marine system Although the Marine Environment Management Act of the Republic of Korea stipulates tim marine pollution impact survey must be conducted at the time of the oil spill, the articles do not provide specifics or concrete survey items for socio-economic impact assessment Moreover, there are redundancy questions in the provisions related to socio-economic impact assessment. This paper examined several difficulties encountered in carrying out the socio-economic impact assessment for marine oil spill as required in the law, and presented some recommendation., for the plan to improve the assessment mechanism systematically through the development of the research categories and indicators of socio-economic impact assessment.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.