• Title/Summary/Keyword: end-point model

Search Result 338, Processing Time 0.026 seconds

Effect of Pollutants Control Measures in So-oak Watershed on the Control of Algae Growth in Daecheong Reservoir (소옥천 유역의 오염제어 대책에 따른 대청호 조류저감 효과 분석)

  • Park, Hyung Seok;Yoon, Sung Wan;Chung, Se Woong;Hwang, Hyun Sik
    • Journal of Environmental Impact Assessment
    • /
    • v.25 no.4
    • /
    • pp.248-260
    • /
    • 2016
  • This study was aimed to assess the effect of diverse pollutants control measures suggested in the Chuso basin and its upstream of So-oak stream watershed where are the most concerned areas on the control of algal bloom occurring in Daecheong Reservoir. The control measures were classified as watershed measures and in-reservoir measures, and their effects were simulated using a two-dimensional hydrodynamic and water quality model. The watershed measures were made up of 1) point sources control, non-point sources control, and their combinations. The in-reservoir measures were supposed to treat sediment at Chuso basin and to install a phosphorus elimination plant (PEP) at the end of So-oak stream. The results showed that the effect of each measure was influenced by the hydrological condition of the year. In wet year, as the contribution of non-point sources increased, the non-point source control measures (NPS1~NPS4) showed more effective compared to other measures, while, the PEP system to eliminate phosphorus from So-oak stream showed better performance in dry year. In particular, the scenario of NPS1, in which all livestock manures were collected and treated but only chemical fertilizers (NPS1) were used for agriculture fields, showed the best performance for the control of algal bloom in Chuso basin among the watershed measures.

The Estimation of Debris Flow Behaviors in Injae Landslide Area (인제군 산사태 지역의 토석류 거동 예측기법 적용)

  • Kim, Gi-Hong;Hwang, Jae-Seon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.29 no.5
    • /
    • pp.535-541
    • /
    • 2011
  • A debris flow is caused by torrential rain in mountainous regions and carries mixture of fragmental matter from slope failure, deposit soils from a valley floor and a large amount of water. It seriously damages facilities, houses, and human lives in its path. We tried to apply debris flow behavior estimation model developed in foreign country to domestic case. The study area is Inje-county, Gangwon-do and aerial photos and GPS surveying were used to collect information of starting and end point of the landslide and debris flow. The analysis showed that L/H for forecasting the travel distances of debris flows has the mean of 4.93 and standard deviation of 0.98. This model tended to overestimate the scale and extent of debris flows. In Inje-county's case, a debris flow is caused by multiple simultaneous small-scale landslide. This is quite different from the foreign cases in which a large-scale landslide cause a large-scale debris flow. Thus, an empirical model suitable for domestic conditions needs to be developed.

Development of an Optimal Operation Model of Residual Chlorine Concentration in Water Supply System (송·배수시스템의 최적 잔류염소농도 관리 모델 개발)

  • Kim, Kibum;Hyung, Jinseok;Seo, Jeewon;Shin, Hwisu;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.31 no.6
    • /
    • pp.587-597
    • /
    • 2017
  • This study aimed to develop a method to optimize residual chlorine concentrations in the process of providing water supply. To this end, this study developed a model capable of optimizing the chlorine input into the clearwell in the purification plant and the optimal installation location of rechlorination facilities, and chlorine input. This study applied genetic algorithms finding the optimal point with appropriate residual chlorine concentrations and deriving a cost-optimal solution. The developed model was applied to SN purification plant supply area. As a result, it was possible to meet the target residual chlorine concentration with the minimum cost. Also, the optimal operation method in target area according to the water temperature and volume of supply was suggested. On the basis of the results, this study derived the most economical operational method of coping with water pollution in the process of providing water supply and satisfying the service level required by consumers in the aspects of cost effectiveness. It is considered possible to appropriately respond to increasing service level required by consumers in the future and to use the study results to establish an operational management plan in a short-term perspective.

The IT System Model for The SME-Type Smart Work System (중소기업형 스마트워크 시스템을 위한 IT 시스템 모델)

  • Kim, Bong-gi;Son, Jin Seong
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.10a
    • /
    • pp.827-830
    • /
    • 2013
  • Due to strong wind of smartphone, change in human life is facing 21 Century's new revolution. The end of 2012, The record rate of supply of smartphone is up to 58.8 percent. So the reputation of IT power are continuing. Korea is boasting IT infrastructure, and the reputation of IT power with rapidly evolving. But Korea is one of OECD country with the longest working hours and in labor productivity, yet is located in the lower rank. Now, common social issues such as low-carbon, green growth, low birthrate, graying, labor productivity growth, the reduce greenhouse gas is constantly increasing in worldwide. So Smart Work is getting attention as a way to resolve this. In this paper, we study the impact of small business on local economy and the status information of small business on statistical point of view. And we offer the smart work countermeasures of small business through detailed action elements and the model proposed fot driving factor for the promotion of smart work. Through this, we propose the IT system model for The SMEs-type smart work system.

  • PDF

A Case Study on R&D Process Innovation Using PI6sigma Methodology (PI6sigma를 이용한 R&D 프로세스 혁신 사례 연구)

  • Kim, Young-Jin;Jeong, Woo-Cheol;Choi, Young-Keun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.1
    • /
    • pp.17-23
    • /
    • 2010
  • The corporate R&D(Research and Development) has a primary role of new product development and its potential is the most crucial factor to estimate corporate future value. However, its systemic inadequacies and inefficiencies, the shorten product life-cycle to satisfy customer needs, the global operations by outsourcing strategy, and the reduction of product cost, are starting to expose to R&D business processes. The three-phased execution strategy for R&D innovation is introduced to establish master plan for new R&D model. From information technology point of view, PLM(Product Life-cycle Management) is one of the business total solutions in product development area. It is not a system, but the strategic business approach that collaboratively manage the product from beginning stage to end of life in all business areas PLM functions and capabilities are usually used as references to re-design new R&D process. BPA(Business Process Assessment) and 5DP(Design Parameters) in PI6sigma developed by Samsung SDS Consulting division are introduced to establish R&D master plan and re-design process respectively. This research provides a case study for R&D process innovation. How process assessment and PMM(Process Maturity Model) can be applied in business processes, and also it explains process re-design by 5DP method.

Physical Model Experiment on the Seepage Characteristics through a Dam by using FDR Sensor (FDR 센서를 활용한 제체 누수특성의 실내 모형 실험 연구)

  • Kim, Gyoo-Bum;Im, Eunsang;Ryu, Ho-Cheol;Hwang, Chan-ik;Kim, Hyeong-Jong
    • The Journal of Engineering Geology
    • /
    • v.28 no.4
    • /
    • pp.715-726
    • /
    • 2018
  • Various methods, such as geophysical exploration, temperature measurement, and fiber optics, have been developed for detecting the seepage at a dam. In this study, in order to investigate the possibility of leakage detection using dielectric constant of FDR sensor, a physical model consisting of weak and no-weak zones is fabricated and the sensors for dielectric constant, temperature and pore water pressure measurements are installed. As a leakage happens, the dielectric constant changes more rapidly through a weak zone than no-weak zone. In addition, comparing three factors (dielectric constant, temperature, and pore water pressure), the response of dielectric constant to seepage is fast and it is easily recognized even at the end measurement point. Considering these features, it is concluded that it could be possible to cope with the leakage detection quickly and efficiently if the dielectric constant is measured at the downstream slope of a dam.

A Simple Model of Shrinkage Cracking Development for Kaolinite (수축 균열 발달 과정을 위한 단순 모델)

  • Min, Tuk-Ki;Nhat, Vo Dai
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.9
    • /
    • pp.29-37
    • /
    • 2007
  • The experiments have been conducted on Kaolinite in laboratory to investigate the development of shrinkage cracking and propose a simple model. Image analysis method consisting of control point selection(CPS) technique is used to process and analyze images of soil cracking captured by a digital camera. The distributions of crack length increment and crack area increment vary as a three-step process. These steps are regarded as stages of soil cracking. They are in turn primary crack, secondary crack and shrinkage crack stages. In case of crack area, the primary and secondary stages end at normalized gravimetric water content(NGWC) of 0.92 and 0.70 for different specimen thicknesses respectively. In addition, the primary stage in case of crack length also ends at NGWC of 0.92 while the secondary stage stops at NGWC of 0.79, 0.82, and 0.85 for the sample thicknesses of 0.5, 1.0, and 2.0 cm respectively Based on the experimental results, the distributions of crack length increment and crack area increment appear to be linear with a decrease of NGWC. Therefore, the development of shrinkage cracking is proposed typically by a simple model functioned by a combination of three linear expressions.

Assessing the Action Plans in the Control Area(Soyang Reservoir) of Non-point Source Pollution (비점오염원 관리지역(소양호) 목표수질 달성도 평가)

  • Choi, Jaewan;Kang, Min-Ji;Ryu, Jichul;Kim, Dong-Il;Lim, Kyung-Jae;Shin, Dong-Seok
    • Journal of Environmental Science International
    • /
    • v.23 no.5
    • /
    • pp.839-852
    • /
    • 2014
  • The Ministry of Environment (MOE) has made more effort in managing point source pollution rather than in nonpoint source pollution in order to improve water quality of the four major rivers. However, it would be difficult to meet water quality targets solely by managing the point source pollution. As a result of the comprehensive measures established in 2004 under the leadership of the Prime Minister's Office, a variety of policies such as the designation of control areas to manage nonpoint source pollution are now in place. Various action plans to manage nonpoint source pollution have been implemented in the Soyang-dam watershed as one of the control areas designed in 2007. However, there are no tools to comprehensively assess the effectiveness of the action plans. Therefore, this study would assess the action plans (especially, BMPs) designed to manage Soyang-dam watershed with the WinHSPF and the CE-QUAL-W2. To this end, we simulated the rainfall-runoff and the water quality (SS) of the watershed and the reservoir after conducting model calibration and the model validation. As the results of the calibration for the WinHSPF, the determination coefficient ($R^2$) for the flow (Q, $m^3/s$) was 0.87 and the $R^2$ for the SS was 0.78. As the results of the validation, the former was 0.78 and the latter was 0.67. The results seem to be acceptable. Similarly, the calibration results of the CE-QUAL-W2 showed that the RMSE for the water level was 1.08 and the RMSE for the SS was 1.11. The validation results(RMSE) of the water level was 1.86 and the SS was 1.86. Based on the daily simulation results, the water quality target (turbidity 50 NTU) was not exceeded for 2009~2011, as results of maximum turbidity in '09, '10, and '11 were 3.1, 2.5, 5.6 NTU, respectively. The maximum turbidity in the years with the maximum, the minimum, and the average of yearly precipitation (1982~2011) were 15.5, 7.8, and 9.0, respectively, and therefore the water quality target was satisfied. It was discharged high turbidity at Inbuk, Gaa, Naerin, Gwidun, Woogak, Jeongja watershed resulting of the maximum turbidity by sub-basins in 3years(2009~2011). The results indicated that the water quality target for the nonpoint source pollution management should be changed and management area should be adjusted and reduced.

Nonlinear Analysis of RC Beams under Cyclic Loading Based on Moment-Curvature Relationship (모멘트-곡률 관계에 기초한 반복하중을 받는 철근콘크리트 보의 비선형 해석)

  • 곽효경;김선필
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.13 no.2
    • /
    • pp.245-256
    • /
    • 2000
  • A moment-curvature relationship to simulate the behavior of reinforced concrete beam under cyclic loading is introduced. Unlike previous moment-curvature models and the layered section approach, the proposed model takes into consideration the bond-slip effect by using monotonic moment-curvature relationship constructed on the basis of the bond-slip relation and corresponding equilibrium equation at each nodal point. In addition, the use of curved unloading and reloading branches inferred from the stress-strain relation of steel gives more exact numerical result. The advantages of the proposed model, comparing to layered section approach, may be on the reduction in calculation time and memory space in case of its application to large structures. The modification of the moment-curvature relation to reflect the fixed-end rotation and pinching effect is also introduced. Finally, correlation studies between analytical results and experimental studies are conducted to establish the validity of the proposed model.

  • PDF

Strip Adjustment of Airborne Laser Scanner Data Using Area-based Surface Matching

  • Lee, Dae Geon;Yoo, Eun Jin;Yom, Jae-Hong;Lee, Dong-Cheon
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.32 no.6
    • /
    • pp.625-635
    • /
    • 2014
  • Multiple strips are required for large area mapping using ALS (Airborne Laser Scanner) system. LiDAR (Light Detection And Ranging) data collected from the ALS system has discrepancies between strips due to systematic errors of on-board laser scanner and GPS/INS, inaccurate processing of the system calibration as well as boresight misalignments. Such discrepancies deteriorate the overall geometric quality of the end products such as DEM (Digital Elevation Model), building models, and digital maps. Therefore, strip adjustment for minimizing discrepancies between overlapping strips is one of the most essential tasks to create seamless point cloud data. This study implemented area-based matching (ABM) to determine conjugate features for computing 3D transformation parameters. ABM is a well-known method and easily implemented for this purpose. It is obvious that the exact same LiDAR points do not exist in the overlapping strips. Therefore, the term "conjugate point" means that the location of occurring maximum similarity within the overlapping strips. Coordinates of the conjugate locations were determined with sub-pixel accuracy. The major drawbacks of the ABM are sensitive to scale change and rotation. However, there is almost no scale change and the rotation angles are quite small between adjacent strips to apply AMB. Experimental results from this study using both simulated and real datasets demonstrate validity of the proposed scheme.