• Title/Summary/Keyword: embankment slope

Search Result 171, Processing Time 0.022 seconds

A Deformation Prediction of the Embankment on the Soft Clayey Foundation - A Case Study of the Sea Dike of Koheung Bay - (점성토지반에 축조한 제방의 변형추정 -고흥만 방수제 사례연구를 중심으로-)

  • 오재화;이문수
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.40 no.4
    • /
    • pp.94-102
    • /
    • 1998
  • This paper aims at developing the prediction technique of the deformation for the embankment such as sea dike and shore protection relevant to reclamation project along the southern coast of the Korean Peninsula. Generally total deformation of a sea dike over clayey foundation are composed of immediate settlement, plastic deformation and consolidation settlement. Plastic deformation occurs when the ultimate bearing capacity is less than overburden pressure containing the stress increment due to the construction of an embankment. The reliable prediction of total settlement is very important since deformed final geometry of sea dike is directly connected for analysing the safety of the long-term slope failure and piping. During this study, plastic deformation, major part of deformation was analysed using the program developed by authors, whereas immediate settlement and consolidation settlement were predicted by Mochinaka and Sena's method and Terzaghi's 1-dimensional theory of consolidation respectively. In order to validate the prediction technique for the deformation, a case study of Koheung Bay reclamation works was carried out. A good agreement was obtained between observation and prediction, which means the applicability of the technique.

  • PDF

A Study on the Effect of Improvement Boundary of Vertical Drain Method by Finite Element Analysis (유한요소해석을 이용한 연직배수재의 타설범위에 따른 개량효과에 관한 연구)

  • Chang, Y.C.;Kim, J.H.;Lee, J.S.
    • Journal of the Korean GEO-environmental Society
    • /
    • v.5 no.1
    • /
    • pp.5-12
    • /
    • 2004
  • Soft foundation is extensively distributed in coastal areas including our local regions. Embankment load on such soft foundation causes displacement due to lack of base ground supports. Long-term consolidation can result in settlement and destruction of shear failure and structure. Therefore, a variety of vertical drain methods are applied to construction sites to prevent base from breaking and changing for secure construction. This study analyzed the patterns of changes displacement to determine efficient range of improvement since range of vertical drain material determines vertical and horizontal changes based on the width range of under ground improvement. Changes of intensity with distance from embankment edge were also analyzed in the field study of embankment slope.

  • PDF

Seismic performance evaluation of agricultural reservoir embankment based on overtopping prevention structures installation

  • Bo Ra Yun;Jung Hyun Ryu;Ji Sang Han;Dal Won Lee
    • Korean Journal of Agricultural Science
    • /
    • v.50 no.3
    • /
    • pp.469-484
    • /
    • 2023
  • In this study, three types of structures-stepped gabion retaining walls, vertical gabion retaining walls, and parapets-were installed on the dam floor crest to prevent the overflow of deteriorative homogeneous reservoirs. The acceleration response, displacement behavior, and pore water pressure ratio behavior were compared and evaluated using shaking-table model tests. The experimental conditions were set to 0.154 g in consideration of the domestic standard and the seismic acceleration range according to the magnitude of the earthquake, and the input waveform was applied with Pohang, Gongen, and artificial earthquake waves. The acceleration response according to the design ground acceleration increased as the height of the embankment increased, and the observed value were larger in the range of 1.1 to 2.1 times the input acceleration for all structures. The horizontal and vertical displacements exhibited maximum values on the upstream slope, and the embankment was evaluated as stable and included within the allowable range for all waveforms. The settlement ratio considering the similarity law exhibited the least change in the case of the parapet structure. The amplification ratio was 1.1 to 1.5 times in all structures, with the largest observed in the dam crest. The maximum excess pore water pressure ratio was in the range of 0.010 - 0.021, and the liquefaction evaluation standard was within 1.0, which was considered very stable.

On the Construction of Embankment of the Eui-Rim Reservoir (의림지(義林池) 축제(築堤)에 관(關)한 일고찰(一考察))

  • Chung, In Koo
    • Journal of Korean Society of Forest Science
    • /
    • v.23 no.1
    • /
    • pp.29-33
    • /
    • 1974
  • U-Reuk, a laureate musician in the days of King Jin-Heung, Silla Dynasty, built the Eui Rim Reservoir about 1,400 years ago. This was one of the oldest man-made reservoir. The embankment of the reservoir collapsed by the clumsy artificial drainage on August 19, 1972 when the heavy rainfall of 462 mm/day caused a dangerous overflow of the reservoir. The result of the study on the mystic ancient embankment techniques are as follows: 1. Sandy loam derived from the weathering of granite which is the most widely distributed rock type in the area, was used in the embankment. Large size logs (embankment core) of 30-50 cm in diameter were buried lengthwise along the embankment. 2. The six stocks of Pinus densiflora, 3 stocks of Quercus acutissima, 1 stock of Quercus variabilis and 1 stock of Popolus maximowiczii, altogether 11 stocks are identified. Forest types in the nearby area during the days of the reservoir construction seem to be includde a considerable number of Pinus densiflora, Quercus and Populus species. 3. The angle of repose of the earth materials is taken into account during the embankment. On top of the embankment double layers of clay (20-30 cm indepth) were spread and consolidated. Layer of litter of 20-40 cm in deep covered on the clay layer of the embankment completely, and another layer of clay was consolidated over the litter. Finally, a layer of stones of 10-30 cm in diameter and clay (yellow soil layer) toped the embankment. 4. At the lower part of the embankment clay layer was thicker and became thinner as it goes upwards. At every layer, soil was consolidated and burned. When embankment was completed, it was covered evenly with heavy clay, and finally it was topped with general soil. 5. The heavy clay layer on the inner slope of the embankment showed gray phenomena and litter remained raw humus layer. The clay layer functioned as rubber in the water, and raw humus layer prevented water from seepages. Thus, the embankment was solidly built in this way. 6. The ancient embankment techniques used soils conveyed from nearby area taking the angle of repose into account. Once embankment was completed, clay and litter layers were added to have a plasticity and to withstand the water pressure. 7. It is an excellent technique that the reservoir was constructed with least labor for maximum effects while the recent embankment techniques requires a large amount of labor.

  • PDF

FEM Numerical Formulation for Debris Flow (토석류 유동해석을 위한 유한요소 수식화)

  • Shin, Hosung
    • Journal of the Korean Geotechnical Society
    • /
    • v.30 no.10
    • /
    • pp.55-65
    • /
    • 2014
  • Recent researches on debris flow is focused on understanding its movement mechanism and building a numerical simulator to predict its behavior. However, previous simulators emulating fluid-like debris flow have limitations in numerical stability, geometric modeling and application of various boundary conditions. In this study, depth integration is applied to continuity equation and force equilibrium for debris flow. Thickness of sediment, and average velocities in x and y flow direction are chosen for main variables in the analysis, which improve numerical stability in the area with zero thickness. Petrov-Galerkin formulation uses a discontinuous test function of the weighted matrix from DG scheme. Presented mechanical constitutive model combines fluid and granular behaviors for debris flow. Effects on slope angle, inducing debris height, and bottom friction resistance are investigated for a simple slope. Numerical results also show the effect of embankment at the bottom of the slope. Developed numerical simulator can assess various risk factors for the expected area of debris flow, and facilitate embankment design in order to minimize damage.

Retardation Effect on the Breach of the Earth Filled Embankment Using the Stiffener During Overtopping (흙댐 제체의 보강재 설치에 따른 월류붕괴 지연효과)

  • Joo, Yo Han;Yeo, Chang-Geon;Lee, Seung Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1377-1387
    • /
    • 2013
  • Most embankment of the reservoirs (99.1 %) have been constructed in the earth filled type in Korea because the construction of this type is less expensive and simpler than others such as concrete one. However, it has to be reinforced the slope to prevent the breach due to overtopping or piping under unexpected flood conditions. This study has been analyzed the retardation effect using three types (L, T, $L^*$ shape) of stiffener in order to reinforce embankment when they are collapsed by overtopping flow. Experimental results showed that L-type stiffener is the most effective in delaying the breaching of embankment and reducing the soil erosion when compared with others. The reinforced embankment breaching showed that time delay was occurred about 1.73 to 2.29 times and the peak flowrate was reduced compared to non-stiffener embankments due to energy dissipation by collision and less soil erosion. The embankment breaching mostly leads to major damages because of the lack of repair time. Thus, since these stiffeners can resist the rapid breach, it would be possible to earn the time to emergency repair and lifesaving, as well as reduction of damages of embankment in downward region with decreasing peak flowrate. Results from this study would be used for the basis when establishing the emergency action plan for the reservoirs on the verge of hazard.

Numerical Modelling of Reinforced Soil Slopes Under Railway Load (열차하중을 받는 토목섬유 보강사면의 수치해석)

  • Jung, Young-Hoon;Lee, Il-Wha;Jang, Ki-Soo;Yoo, Seung-Joon;Lee, Su-Hyung
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.6 s.37
    • /
    • pp.753-760
    • /
    • 2006
  • This paper presents the procedure and results of the numerical modelling that was carried out to investigate the stability of reinforced soil slopes under dynamic railway load. The two-dimensional explicit dynamic finite element method (ABACUS) was used to carry out the numerical analyses. To simulate the railway load, the top surface of the embankment was excited by the uniform distributed load whose frequency and magnitude was estimated by the measured railway acceleration during train passing. The embankment displacements and geogrid axial forces were analyzed to evaluate the stability of reinforced soil slopes under the dynamic train load.

Lateral long term behavior for web direction of Driven H-Piles in Embankment (성토지반에 타입된 H 말뚝의 약축방향에 대한 횡방향 장기지지거동)

  • 박영호;정경자;김낙영;황영철
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.06a
    • /
    • pp.43-56
    • /
    • 2002
  • To find a lateral long term behavior of driven H-piles in embankment, inclinometer is installed at pile and measurement is done during a year. When behavior of measured slope angles is in accord with behavior of nonlinear p-y curves(Reese, Murchison and O'Neil, Matlock's p-y analysis), maximum displacement of pile head, maximum stress and maximum bending moment of pile obtained from the numerical analysis are shown. As results, maximum lateral displacement at pile head, maximum stress and maximum bending moment of pile are shown linear behavior, And maximum lateral load, maximum lateral displacement, and maximum bending moment at pile obtained from the numerical analysis are 8∼12.4tonf, 9∼10.1㎜, and 10.39∼12.67tonf-m per pile according to the curves, respectively.

  • PDF

Lateral long term behavior of Driven H-Piles in Embankment (성토지반에 타입된 H 말뚝의 횡방향 장기지지거동)

  • 박영호;정경자;김주경;김동인
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.575-582
    • /
    • 2002
  • To find a lateral long term behavior of driven H-piles in embankment, inclinometer is installed at pile and measurement is done during a year. When behavior of measured slope angles is in accord with behavior of nonlinear p-y curves(Reese, Murchison and O'Neil, Matlock's p-y analysis), maximum displacement of pile head, maximum stresses and maximum bending of pile obtained from the numerical analysis are shown. As results, maximum lateral displacement at pile head, maximum stress and maximum bending moment of pile are shown linear behavior. And maximum lateral load, maximum lateral displacement, and maximum bending moment at pile head obtained from the numerical analysis are 8∼12.4tonf, 9∼10.1mm, and 10.39∼12.67tonf-m per pile according to the curves, respectively.

  • PDF

Modeling of the Formation of Long Grooves in the Seabed by Grounded Ice Keels

  • Marchenko, Aleksey
    • Journal of Ship and Ocean Technology
    • /
    • v.7 no.4
    • /
    • pp.1-15
    • /
    • 2003
  • The motion of passively floating body, whose keel can have a contact with seabed soil, is under the consideration. The body simulates ice ridge floating in shallow water. The force of seabed soil reaction applied to the grounded keel is estimated taking into account soil embankment near the grounded keel. Two-dimensional trajectories of body motion, the shape of the grooves in seabed and the height of soil embankment are calculated when the motion of the body is caused by semidiurnal $M_2$ tide. The influence of wave amplitude and bottom slope on the shapes of body trajectory and the grooves are analyzed.