• 제목/요약/키워드: electrical safety accident

검색결과 196건 처리시간 0.036초

인체모델을 이용한 감전특성에 관한 연구 (A Study on the Electric Shock Characteristics Using a Human Body Model)

  • 정연하;이재화;장태준;노영수;곽희로;최충석
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2004년도 춘계학술대회 논문집
    • /
    • pp.277-280
    • /
    • 2004
  • As electric shock accident take place frequently, electrical safety is extremely important to prevent them. This paper describes the characteristics of electric shock. In order to examine it, an experimental apparatus including a model of a human body is fabricated and the magnitude of the voltage held by the model is measured under several conditions as follows;(1) the model is not contacted to an electric pole and a step voltage does not exist. (2) the model is not contacted to an electric pole and a step voltage exists. (3) the model is contacted to an electric pole and a step voltage does not exist (4) the model is contacted to an electric pole and a step voltage exists. As a result of the experiment it is found that the voltage held by the model depends on the step voltage as well as the voltages applied to the electric pole.

  • PDF

1400MW급 경수로형 원자력발전소의 대용량 유도전동기 시동시 안전관련 모선 전압 변동 (Safety-Related Bus Voltage Variation during Large Induction Motor Start-up in 1400MW Light Water Reactor Type Nuclear Power Plant)

  • 이청준;김창국;노영석;주영환
    • 플랜트 저널
    • /
    • 제12권4호
    • /
    • pp.37-43
    • /
    • 2016
  • 원자력발전소의 사고 대처 부하에 전력을 공급하는 전원계통은 다양한 조건에서도 일정 전압이 유지됨을 분석을 통하여 입증한다. 이를 위하여 발전소를 일정부하 운전 상태로 유지하고, 대용량 전동기(원자로냉각재펌프(RCP), 기기냉각수펌프(CCWP))를 각각 기동하여 기동 전 후 안전관련 모선의 전압을 측정하였다. 현장 시험으로 확보된 자료(예, 전압, 전류, 역율 등)는 기존 전력계통해석 모델의 운전 조건으로 재입력하고 재분석을 수행하였다. 이는, 기존 전력계통분석에 사용된 분석기법과 가정들을 실질적인 측정과 결과 분석으로 입증하는 과정이다. 결국, 두 경우의 전압 강하는 발전소 안전에 중요한 기기의 전압이 허용전압 이하로 저하되지 않음과 두 값의 비교 결과가 요구되는 제한치 이내임을 검증한다.

  • PDF

원자력발전소 전기기기의 보수, 교체 방법론 (Repair and Replacement Methodology for Electrical Equipment Used in Nuclear Power Plants)

  • 박철희;박완규;이만복;김춘삼
    • 전력전자학회:학술대회논문집
    • /
    • 전력전자학회 2018년도 전력전자학술대회
    • /
    • pp.177-179
    • /
    • 2018
  • After Fukushima nuclear accident at 2011, nuclear industrial has been focused on operation and maintenance phase, not design and construction phase. Continued good operating performance of nuclear power plants has been the best critical issue to nuclear utilities. Replacement for complete components as well as parts of components is being procured because nuclear utilities must maintain safety and reliability of operating nuclear power plants. However, many suppliers and manufacturers are giving up a nuclear quality assurance program under reduction in new construction of nuclear power plants. It is able to be increased difficulty in procuring spare parts to support operations and maintenance of nuclear power plants. Over 20% of nuclear power plant equipment in some countries is obsolete. Owing to obsolescence of nuclear safety-related items and/or withdrawing a nuclear quality assurance program of suppliers and manufactures, some replacement item and part might be procured to the item not covered by appendix B to USNRC 10 CFR Part 50. Under various methods of the nuclear repair and replacement methodology, utilities are supposed to establish a typical program for a repair and replacement of an electrical equipment and its parts in conjunction with a nuclear quality assurance. Concerning this typical program, this study suggests the repair and replacement methodology of electrical equipments used in nuclear power plants by procurement of a power supply, based on nuclear regulations, codes, standards, guidelines, specific and general technical information, etc..

  • PDF

육상전원공급장치(AMP) 이용한 선내 전원 공급 시 계통 안정도 분석 (Transient Stability Analysis of Vessel Power System Using Alternative Marine Power)

  • 강승표;김장목;조현준
    • 해양환경안전학회지
    • /
    • 제29권2호
    • /
    • pp.215-222
    • /
    • 2023
  • 세계적 선박 배출가스 저감에 대한 규제로 인해 항만 및 부두에서 육상전원공급장치(AMP, Alternative Marine Power)가 지속적으로 사용되고 있다. 국내 또한 항만 대기질 개선 특별법에 따라 AMP의 사용이 의무화되고 있고, 다양한 친환경선박과 연계하여 활용하도록 지속적인 시도를 하고 있다. 본 논문에서는 AMP를 통해 선내 전력을 공급하는 상황을 모델링 하여 AC Load Flow Analysis를 수행하였다. 이를 통해 선박에 전력이 공급될 때의 전기적 파라미터와 손실 등에 대해서 분석할 수 있다. 아울러 Transient Stability Analysis를 통해 계통의 사고 발생 시 선내 발전기를 통한 무정전전환에 대한 HSGT(High Speed Generation Transfer)의 한계값을 도출하고 이를 적용하였을 경우 결과에 대해 검토하였다.

신뢰성과 유지보수를 위한 원자로보호계통 주기시험 방법 개발 (RPS Periodic Testing Method for Reliability and Availability)

  • 박주현;이동영;이성진;송덕용
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 심포지엄 논문집 정보 및 제어부문
    • /
    • pp.84-86
    • /
    • 2005
  • The digital systems such as PLC or DCS have been applied to non-safety systems of nuclear power plants because of many difficulties in using analog systems. Nowadays, digital systems have been applied to safety systems of the plants such as reactor protection system. One of the main advantages of digital systems is applicability of automatic testing methods to the systems. The protection system requires high-reliability and high-availability because it shall minimize the propagation of abnormal or accident conditions of nuclear power plants. The calculation of reliability and availability of systems depends on the maintenance period of the system. In general, the maintenance period of the protection system is one-month in case of the manual test. However, the cycle of test can be shortened in several hours by using automatic periodic testing. The reliability and availability of the system is better when test period is shortened because the reliability and availability is inverse proportion to the test period. In this research, we developed the automatic periodic testing method for KNICS Reactor Protection System, which can test the system automatically without an operator or a tester. The automatic testing contained all functions of reaction protection systems from analog-to-digital conversion function of the bistable Processor to the coincident trip function of the coincident processor. By applying the automatic periodic testing to reaction system, the maintenance cost can be cut down and the reliability can be increased.

  • PDF

화재조사전문교육 및 자격증제도 개선에 관한 연구 (A Study on Improvement of Professional Fire Investigation Education and Certification System)

  • 고기봉;이시영
    • 한국화재소방학회논문지
    • /
    • 제23권5호
    • /
    • pp.32-42
    • /
    • 2009
  • 본 연구는 국내의 화재조사전문교육 운영 실태를 분석하고 개선방안을 도출하는데 있다. 연구결과 현재의 화재조사전문교육은 공적영역(소방, 경찰, 전기안전공사, 가스안전공사 등) 중심으로 이루어지고 있으며 중앙소방학교에서 실시하고 있는 교육이 가장 체계적인 것으로 나타났다. 그리고 사적영역(화재피해이재민, 일반국민 등)을 대상으로 하는 화재조사전문교육은 거의 이루어지고 있지 않는 것으로 나타났다. 이러한 문제점을 개선하기 위해서 현행 중앙소방학교를 평생교육체제로 전환하여 대학의 학위과정과 연계하고 소방방재청에서 시행하고 있는 화재조사관자격증 제도를 외부에 개방 및 학습수준별 5단계로 나누어 운영할 것을 제안하였다.

발전소용 4.16 kV급 차단기에서 감전사고 사례 분석 (Analysis of Electric Shock Accident on 4.16 kV Class Circuit breaker for Power Plant)

  • 박남규;송재용;김진표;고재모
    • 한국안전학회지
    • /
    • 제29권4호
    • /
    • pp.54-60
    • /
    • 2014
  • This paper describes electric shock accidents on a 4.16 kV class circuit breaker for power plant. Electric shock accidents mostly involve damage of human life, in comparison with electrical fire, rate of human death tend to be higher in electric shock accidents. Specially, in a high voltage facilities rate of human death comprised about 43.7% by electric shock accidents. If electric shock accidents happen in a 4.16 kV class circuit breaker for power plant, then the power plant discontinue power production. Electric shock accidents in a power plant have a great ripple effect such as an electric power shortage. In this paper, we analyzed electric shock accidents on a 4.16 kV class circuit breaker for power plant. From the analysis results, we confirmed a cause of electric shock accidents on a 4.16 kV class circuit breaker, it happened by defect of interlock equipment or occurrence of breakdown between first feeder contactor and shielding plate. In order to reduce electric shock accidents on a 4.16 kV class circuit breaker, the power plant should consider improvement of interlock equipment and insulation of feeder contactor in circuit breaker.

광양제철소 전력계통 단독 운전시 발전기 최적제어방안 연구 (The study on the optimal control of generators on the single operation of electric power system in Gwangyang steel works)

  • 곽인철;신민교;최윤종;박부견
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2006년 학술대회 논문집 정보 및 제어부문
    • /
    • pp.357-359
    • /
    • 2006
  • The electric power system of Kwangyang steel works needs to keep the parallel operation with the system of KOPEC(Korea Electric Power Corporation) for supplying the power with safety. Once it is separated from KOPEC due to an accident, it operates the automatic Mill trip system to prevent huge fluctuating loads from the serious frequency drop. In spite of that, it is recent situations that the continuous growth of electric loads facilitates the frequency drop. Therefore, this paper proposes a model of generator control system so as to quantitatively analyze the response characteristics to the frequency change under the single operation, and also suggests the strategy for minimizing the frequency changes. The simulation results show it is desirable to operate the generators by 3% speed droop and 10% load limiter.

  • PDF

ITS를 고려한 철도건널목 시스템에 관한 연구 (A Study on the railway level crossing system concerning ITS)

  • 류상환;조봉관;김종기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.321-324
    • /
    • 2001
  • The accidents in a railway level crossing where passengers or vehicles pass on the track went through by the train with a inherent high rate on incidents lead to a vast economic damage on people and material resources. So, many protection equipments are placed on the railway crossing to prevent those kind of accidents. But there is a limit to control driver's rough activity, passenger's careless or an intentional accident. This study is trying to ensure the safety in railway crossing by providing the information on train's speed and expected passing time on the railroad to a road traffic control system or car driver. Additionally, this system has been studying the railway level crossing system concerning ITS to support harmonious traffic flow.

  • PDF

Fixture를 이용한 토양 절연파괴 실험 (Soil Breakdown Test using Fixture)

  • 이현구;하태현;정동학;하윤철;김대경;배정효
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.384-385
    • /
    • 2007
  • The fault current through the earth originated from a power line ground fault might cause arcing through the soil to an adjacent pipeline, which might bring about not only a catastrophic accident such as gas explosion and oil leakage but also a hazard to the safety of workers responsible for the maintenance and repair of the pipeline. In this paper we experimented on the soil breakdown test using the fixture and outlined the standards for the separation distance of a buried pipeline adjacent to the power line tower.

  • PDF