• 제목/요약/키워드: electric generator

검색결과 923건 처리시간 0.032초

유전알고리즘을 이용한 발전기 예방정비계획 수립에 관한 연구 (A Study on Generator Maintenance Scheduling using Genetic Algo)

  • 박시우;송경빈;남재현;전동훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1997년도 하계학술대회 논문집 D
    • /
    • pp.781-783
    • /
    • 1997
  • Genetic Algorithm is a kind of an evolution programming based on natural evolution principle. It applied to probabilistic searching, machine learning and optimization, and many good results were reported. Generator maintenance scheduling is an optimization Problem with constraints. This paper applied a genetic algorithm to generator maintenance scheduling problem and tested on sample systems. The results are compared with heuristic method and branch-and-bound method.

  • PDF

공랭식 가스터빈 발전기의 운전중 부분방전 분석 (Analysis of On-Line Partial Discharge in Air-Coolded Gas Turbine Generator)

  • 이은춘;공태식;김재철;김희동
    • 조명전기설비학회논문지
    • /
    • 제28권7호
    • /
    • pp.41-47
    • /
    • 2014
  • The on-line partial discharge (PD) in stator windings of air-cooled gas turbine (GT) generator (119.2MVA, 13.8kV) is measured and analyzed in this paper. This generator was designed by global vacuum pressure impregnation (VPI). The generator failed two times at top bar (16T) of phase B in the stator slot. Six epoxy-mica capacitors were installed in three phases of GT generator. On-line PD test was performed on GT generator using turbine generator analyzer (TGA). TGA showed that the normalized quantity number (NQN) and the PD magnitude($Q_m$) were high in phase B. Internal discharges were generated in phases A, B and C. The trend analysis of NQN and $Q_m$ value are obtained in order to monitor the insulation condition in GT generator stator windings. Phases A and C were in good condition. But phase B had deteriorated significantly

공동주택의 비상발전기 용량산정방식에 관한 고찰 (Some Considerations on the Capacity Estimation of Emergency Electric Generator in Apartment Complex)

  • 김정태;이욱
    • 한국조명전기설비학회지:조명전기설비
    • /
    • 제10권4호
    • /
    • pp.68-77
    • /
    • 1996
  • 본 연구에서는 공동주택에 설치되는 비상발전기의 용량산정 방식에 대하여, NEGA C 201 방식을 적용할 때 필요한 동시시동그룹의 구성과 수용률의 적용 방법을 제시하였으며, 대상부하를 "정전시 부하"와 "화재시 부하"로 구분하여 계산할 것을 제안하였다. 아울러, 500호~1,500호 정도의 대.중.소 규모 공동주택 단지를 대상으로 비상발전기의 용량을 산출하고 실측 결과와의 비교를 통해 본 연구의 제시 방안이 타당함을 입증하였다. 또한, 본 연구에 의한 비상발전기 설계용향은 NEGA C 201 방식에 의한 엔진용량 및 기존방식에 의한 엔진용량과 잘 적합되는 것으로 나타났다.용량과 잘 적합되는 것으로 나타났다.

  • PDF

United Electromagnetic Characteristics and Online Monitoring Method of Static Air-gap Eccentricity of Turbo-Generator

  • Tang, Gui-Ji;Ke, Meng-Qiang;He, Yu-Ling;Wang, Fa-Lin
    • Journal of Electrical Engineering and Technology
    • /
    • 제11권6호
    • /
    • pp.1614-1627
    • /
    • 2016
  • The purpose of this paper is to investigate the united Electromagnetic characteristics for the effective monitoring on the static air-gap eccentricity (SAGE) of turbo-generator. Different from other studies, this paper not only studies on the unbalanced magnetic pull (UMP) and the vibration characteristics of the stator and the rotor, but also investigates the harmonic features of the magnetic flux density and the circulating current inside the parallel branches (CCPB). The theoretical calculation, together with the finite-element-method (FEM) simulation and the experiment verification, is taken for a SDF-9 type non-salient generator. It is shown that, when SAGE occurs, apparent double-frequency UMP and vibrations will be produced both on the stator and the rotor, while the CCPB will have an obvious increment at the $1^{st}$ harmonic component. In addition, the amplitude of the magnetic flux density will be of cosine distribution in the circumferential position of the air-gap, while in normal condition it is a constant. Moreover, the pass-band amplitude, together with the $1^{st}$ harmonic of the magnetic flux density, will be enlarged as well. These united electromagnetic characteristics can be used as the diagnosis and monitoring criterion for SAGE.

Effects of Wind Generation Uncertainty and Volatility on Power System Small Signal Stability

  • Shi, Li-Bao;Kang, Li;Yao, Liang-Zhong;Qin, Shi-Yao;Wang, Rui-Ming;Zhang, Jin-Ping
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권1호
    • /
    • pp.60-70
    • /
    • 2014
  • This paper discusses the impacts of large scale grid-connected wind farm equipped with permanent magnet synchronous generator (PMSG) on power system small signal stability (SSS) incorporating wind generation uncertainty and volatility. Firstly, a practical simplified PMSG model with rotor-flux-oriented control strategy applied is derived. In modeling PMSG generator side converter, the generator-voltage-oriented control strategy is utilized to implement the decoupled control of active and reactive power output. In modeling PMSG grid side converter, the grid-voltage-oriented control strategy is applied to realize the control of DC link voltage and the reactive power regulation. Based on the Weibull distribution of wind speed, the Monte Carlo simulation technique based is carried out on the IEEE 16-generator-68-bus test system as benchmark to study the impacts of wind generation uncertainty and volatility on small signal stability. Finally, some preliminary conclusions and comments are given.

적층된 로터에서 적층판 압착력의 강성 효과 (Stiffness effect of the lamination pressing force for laminated rotor)

  • 김영춘;박철현;박희주;문태선
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2002년도 춘계학술대회논문집
    • /
    • pp.565-568
    • /
    • 2002
  • A lot of rotating machines are being used in the industrial world and electric motor and generator take the most part of it. When it comes to the electric motor and generator, we can not help thinking about the eddy current because it brings a loss of electric and can be a important reason of the heat generation. To attenuate eddy current. laminated silicon steel sheets are being used in general. Especially, laminated rotor is being used for rotating part of the electric motor and generator and it decreases electrical loss and heat generation but we can be faced with another problem. In general, most of the motor and generator can be normally operated under 3600rpm because they are designed to have the first critical speed more than that speed. But nowadays, they should be operated more than the first critical speed as usual with the trend of high speed. large scale and high precision in industrial world. The critical speed can be determined from the inertia and stiffness for the rotor and bearing of rotating systems. The laminated rotor stiffness can be hardly determined because it can be derived a lot factors for instance rotor material and shape. lamination material and shape. insulation material. lamination force and so on. In this paper, the change of the natural frequency of the motor was examined with the change of the lamination force as an experimental method.

  • PDF

Field Adaptability Test for the Full Load Rejection of Nuclear Turbine Speed Controllers using Dynamic Simulator

  • Choi, In-Kyu;Kim, Jong-An;Woo, Joo-Hee
    • 조명전기설비학회논문지
    • /
    • 제23권7호
    • /
    • pp.67-74
    • /
    • 2009
  • This paper describes the speed control functions of the typical steam turbine speed controllers and the test results of generator load rejection simulations. The goal of the test is to verify the speed controller's ability to limit the steam turbine's peak speed within a predetermined level in the event of generator load loss. During normal operations, the balance between the driving force of the steam turbine and the braking force of the generator load is maintained and the speed of the turbine-generator is constant. Upon the generator's load loss, in other word, the load rejection, the turbine speed would rapidly increase up to the peak speed at a fast acceleration rate. It is required that the speed controller has the ability to limit the peak speed below the overspeed trip point, which is typically 110[%] of rated speed. If an actual load rejection occurs, a substantial amount of stresses will be applied to the turbine as well as other equipments, In order to avoid this unwanted situation, not an actual test but the other method is necessary. We are currently developing the turbine control system for another nuclear power plant and have plan to do the simulation suggested in this paper.

대용량 발전소 재열재생 증기터빈 제어알고리즘에 관한 고찰 (A Study on Turbine Control Algorithms for Large Steam Turbine in a Power Plant)

  • 최인규;정창기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2008년도 제39회 하계학술대회
    • /
    • pp.1665-1666
    • /
    • 2008
  • There are three main devices such as boiler producing steam, turbine driving generator and generator producing electricity. An electrical generator in power plant is driven and maintained its speed at rated by steam turbine which is coupled into generator directly. Therefore after the steam turbine reaches its rated speed and the generator gets into parallel operation with power grid, the electrical power can be increased by turbine controller or governor. The first governor was invented by James Watts for the steam engine to be maintained at a constant speed. The first governor by him was mechanical type with fly balls. The electrical type governor was created due to the progress of electronic devices such as operational amplifiers or integrated circuits. and Today digital electronic type of governor is being widely used in most prime movers.

  • PDF

발전방식별 여러 가지 터빈의 속도제어 비교 (A comparison of speed control of various turbines according to power plant types)

  • 최인규;정창기
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2001년도 하계학술대회 논문집 D
    • /
    • pp.2314-2316
    • /
    • 2001
  • The steam gererator which produces thermal energy from coal or gas is a very important device in power plants, including the turbine driving synchronous generator which transforms kinetic energy into electrical energy. The turbine and the generator are driven by many kinds of media according to the types of which power plants are classified into steam turbine generator, gas turbine generator, water turbine generator and so on. This paper introduces the overspeed protection as well as the various speed and load control methods of some types of turbines.

  • PDF