• 제목/요약/키워드: economic calculation

검색결과 377건 처리시간 0.033초

기동정지계획을 위한 경제급전 알고리즘 (Economic Dispatch Algorithm for Unit Commitment)

  • 박정도;이용훈;김구한;문영현
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1999년도 하계학술대회 논문집 C
    • /
    • pp.1506-1509
    • /
    • 1999
  • This paper presents a new economic dispatch algorithm to improve the unit commitment solution while guaranteeing the near optimal solution without reducing calculation speed. The conventional economic dispatch algorithms have the problem that it is not applicable to the unit commitment formulation due to the frequent on/off state changes of units during the unit commitment calculation. Therefore, piecewise linear iterative method have generally been used for economic dispatch algorithm for unit commitment. In that method, the approximation of the generator cost function makes it hard to obtain the optimal economic dispatch solution. In this case, the solution can be improved by introducing a inverse of the incremental cost function. The proposed method is tested with sample system. The results are compared with the conventional piecewise linear iterative method. It is shown that the proposed algorithm yields more accurate and economical solution without calculation speed reduction.

  • PDF

고자기학(古磁氣學)의 방법(方法)(II) : 고자기학적(古磁氣學的) 측정자료로부터 자북(磁北)의 위치를 도시하는 방법 (Methods in Palaeomagnetism (II): Calculation and Plotting of Palaeomagnetic Pole Positions)

  • 김인수
    • 자원환경지질
    • /
    • 제22권2호
    • /
    • pp.167-171
    • /
    • 1989
  • Palaeomagnetic studies accompany calculation and plotting of pole position. This paper explains three graphical methods for the determination of pole position and plotting problem. It also derives the numerical formula for pole calculation and explains the method how the pole plotted on the rear hemisphere can be transformed to the frontal hemisphere, which is not clarified elsewhere.

  • PDF

백터계산을 이용한 단층의 이동량 산출법 (A Simple Vector Calculation Method for the True Failt Displacement Distance)

  • 황상기
    • 자원환경지질
    • /
    • 제32권4호
    • /
    • pp.365-371
    • /
    • 1999
  • Ture diplacement of a fault monement is calculated from the displacement of the index plane such as bedding on an outcrop surface. The input parameters are the orientations of the index, fault, and outcrop planes. It is also necessary to input the orientation of fault striation and the offset distance of the index plane on the outcrop surface. The distances of the total, strike, horizontal and dip slip components of the fault movement are calculated from the input parameters. Hwang(1998) conducted a simlar calculation using trigonoment method. To apply the previous method, the offset distance of the index plane must be measured on a vertical outcrop surface. The calculation method of this study accepts the offset distence of index plane on an outcrop plane of any orientation. Calculation results from both method are indentical, regardless of the simplicity of the new method.

  • PDF

연료제약 발전기를 고려한 전력거래 해석기법 연구 (Analysis on a Power Transaction with Fuel-Constrained Generations in an Electricity Market)

  • 이광호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제53권8호
    • /
    • pp.484-489
    • /
    • 2004
  • When the energy resource available to a particular plant (be it coal, oil, gas, water, or nuclear fuel) is a limiting factor in the operation of the plant, the entire economic dispatch calculation must be done differently. Each economic dispatch calculation must account for what happened before and what will happen in the future. This paper presents a formulation and a solution method for the optimization problem with a fuel constraint in a competitive electricity market. Take-or- Pay (TOP) contract for an energy resource is the typical constraint as a limiting factor. Two approaches are proposed in this paper for modeling the dispatch calculation in a market mechanism. The approaches differ in the subject who considers and inserts the fuel-constraint into its optimization problem. Market operator and each power producer having a TOP contract are assumed as such subjects. The two approaches are compared from the viewpoint of profits. surplus. and social welfare on the basis of Nash Equilibrium.

편익과 비용 분석을 통한 소형차전용지하차도 도입에 관한 연구 (A Study on Building of Underpass for Small Vehicles by Benefit and Cost Analysis)

  • 이영우
    • 한국도로학회논문집
    • /
    • 제15권2호
    • /
    • pp.149-157
    • /
    • 2013
  • PURPOSES : This study is to analysis for benefit and construction cost in underpass for small vehicles. METHODS : The study was performed using the traffic software VISSIM 5.20 for analysis on a variety of traffic conditions and analysed of benefits of changes through analysis of travel speed and travel time after modeling of existing underpass and small vehicle underpass. RESULTS : Results of this study, the benefits will be reduced by the introduction underpass for small vehicles were analyzed because heavy vehicles use the intersection above the underpass. However, it was required economic analysis considering both the benefits reduction and the construction costs reduction because it has the effect of reducing the construction cost. Showed that the difference in benefit changes depending on the v/c and heavy vehicles ratio and construction cost was difference by types of underpass. As a result of performing economic analysis with total benefits and construction cost, it was analyzed to be economical in underpass over a certain size. CONCLUSIONS : The result of this study are expected to be able to contribute to reviewing for feasibility due to the small vehicles underpass introduction and economic analysis. The study is case study to the underpass in Daegu. Therefore, the future requires the calculation of benefits reflect a wider range of traffic conditions and the economic analysis to construction cost calculation for various types of grad separation facilities.

Three-dimensional numerical parametric study of deformation mechanisms of grouped piled raft foundation due to horizontal loading

  • Bo Wang;Houkun Cui;Yan Li;Ya Dai;Nan Zhang
    • Geomechanics and Engineering
    • /
    • 제35권6호
    • /
    • pp.617-626
    • /
    • 2023
  • In this study, three-dimensional numerical parametric study was conducted to explore deformation mechanisms of grouped piled-raft-foundation due to lateral load in clays. Effects of load intensity, loading angle, soil stiffness, pile diameter, pile spacing and pile length on foundation deformations were explored. It is found that the smallest and largest movements of pile foundation are induced when the loading angles are 0° and 30°~60°, respectively. By increasing loading angle from 0° to 30°~60°, the resultant horizontal movements and settlements increase by up to 20.0% and 57.1%, respectively. Since connection beams can substantially increase integrity of four piled raft foundation, resultant horizontal movements, settlements and bending moments induced in the piled raft foundation decrease by up to 54.0%, 8.8% and 46.3%, respectively. By increasing soil stiffness five times, resultant horizontal movements and settlements of pile foundation decrease by up to 61.7% and 13.0%, respectively. It is indicated that effects of connection beam and soil stiffness on settlements of pile foundation are relatively small. When pile diameter is less than 1.4 m, deformations of piled raft foundation decrease substantially as a reduction in the pile diameter. Two dimensional groups are proposed to develop calculation charts of horizontal movements and settlements of pile foundation. The proposed calculation charts can directly estimate movements of piled raft foundation under arbitrary loading, ground and pile conditions.

경제성 평가 기법을 이용한 전력탁송 요금의 계산 : 우편요금제를 중심으로 (Evaluation of Power Wheeling Costs Based on the Economic Analysis Method)

  • 박종배;이원구;김발호
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제49권5호
    • /
    • pp.199-204
    • /
    • 2000
  • This paper presents new approaches for the calculation for the calculation of each user's wheeling prices based on the economic analysis method with focus on the postage stamp rule. The suggested postage stamp rules can overcome the following problems embedded in the conventional accounting-costs-based methods such as the volatileness of wheeling prices depending deprieciation methods, emerging the wheeling free-riders due to the difference between accounting life-time and technical life-time, price discrimination between firm and non-firm network users, etc. To solve these problems we suggest new postage stamp rules employing capital recovery factor for investment costs treatment and applying technical life-time. Furthermore, we have suggested a new formulation for non-firm wheeling users based on the wheeling energies. In the case study, the results of suggested postage stamp methodologies are compared with those of conventional approaches.

  • PDF

등가화법에 의한 경제급전 (Economic dispatch using the equivalent representation method)

  • 김준현;황갑구
    • 전기의세계
    • /
    • 제30권12호
    • /
    • pp.817-821
    • /
    • 1981
  • A simple scheme using the single equivalent machine representation, equivalent loss reprsentation and direct hydro-MW representation are applied to economic dispatch for practical applications. A,simple approach to calculation of incremental transmission losses is proposed from the fast decoupled load flow algorithm. This program is presently being tested on KECO system.

  • PDF

경제성공학의 한계에 관한 고찰 (A Study on Limiting Factor of Capital Assets Investment Calculation)

  • 김성집
    • 산업경영시스템학회지
    • /
    • 제2권2호
    • /
    • pp.5-10
    • /
    • 1979
  • For investment calculation of capital assets, it is desirable to grasp the limiting factors of its calculation. The limiting factors can be listed as follows; $\circled1$ difficulty in estimating the service life of capital assets. $\circled2$ difficulty in estimating the receipts, and operating and maintenance expenses of the project. $\circled3$ difficulty in determining common Minimum Attractive Rate of Return. $\circled4$ difficulty in estimating the salvage value of the assets. $\circled5$ some limiting factors on present worth calculation of the projects. $\circled6$ Some limiting factors on payout period method of the economic calculation.

  • PDF