• Title/Summary/Keyword: earthworks

Search Result 56, Processing Time 0.026 seconds

Development of Database System for Management of Quality Control for Earthworks (토공노반 다짐품질관리를 위한 DB개발소개)

  • Choi, Chan-Yong;Bae, Jae-Hoon;Lee, Jin-Wook
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1848-1852
    • /
    • 2008
  • Maintenance of quality of the compaction is accomplished with the plate load test and density management in roadbed. With the different structure differently the quality of roadbed evaluates indirectly as density and bearing capacity. Control of quality of the compaction very importance but the maintenance of quality is managed still so far with the paper. Recognizes the importance of maintenance of quality from the present paper consequently, and develops a data base one maintenance of quality system with hereafter is expected with the fact that the big help will become in DATA BASE system roadbed plan which is continuous and maintenance of quality.

  • PDF

Evaluating of Structural Safety of Slab Track (슬래브궤도의 구조안전성 평가)

  • 강윤석;양신추;이영제
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.431-438
    • /
    • 2000
  • In recent years. the destructive force acting on the ballasted track is on the increase with the speed-up of trains and the number of trains, requiring more labor and expenditure to maintain the track in goof condition. Slab track has been developed to decrease the track maintenance work on earthworks. One type of slab track Rheda has Prefabricated track grid, consisting of rails. Prestressed concrete sleepers and reinforcement rods are aligned into position. and then concrete is then placed to integrate the sleepers into a reinforced concrete track slab. In this paper, a new analysis model for the system analysis of the slab track is presented. Then the analysis results are compared with requirements for slab track.

  • PDF

Development of Framework for Digital Map Time Series Analysis of Earthwork Sites (토공현장 디지털맵 시계열 변화분석 프레임워크 기술개발)

  • Kim, Yong-Gun;Park, Su-Yeul;Kim, Seok
    • Journal of KIBIM
    • /
    • v.13 no.1
    • /
    • pp.22-32
    • /
    • 2023
  • Due to the increased use of digital maps in the construction industry, there is a growing demand for high-quality digital map analysis. With the large amounts of data found in digital maps at earthwork sites, there is a particular need to enhance the accuracy and speed of digital map analysis. To address this issue, our study aims to develop new technology and verify its performance to address non-ground and range mismatch issues that commonly arise. Additionally, our study presents a new digital map analysis framework for earthwork sites that utilizes three newly developed technologies to improve the performance of digital map analysis. Through this, it achieved about 95% improvement in analysis performance compared to the existing framework. This study is expected to contribute to the improvement of the quality of digital map analysis data of earthworks.

3D Ground Terrain Processing Platform for Automated Excavation System

  • Kim, Seok;Kim, Tae-yeong;Park, Jae-Woo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.669-670
    • /
    • 2015
  • Efficient management of the construction heavy equipment is required to reduce the rate of carbon emissions and on-site accidents. The intelligent excavation system (IES) will improve the construction quality and productivity through information technologies and efficient equipment operation, especially in large earthwork projects. Three-dimensional digitized ground data should be required for identifying the path of heavy equipment and work-site environment. Rapid development of terrain laser scanners (TLS) is more readily to acquire the digital data. This study suggests the '3D ground terrain processing platform (3DGTPP)' including data manipulating module and analyzing module of the scanned data for intelligent earthmoving equipment operation. The processing platform consists of six modules, including scanning, registering, manipulating, analyzing, transmitting, and storing. 3D ground terrain processing platform presented in this study will provide fundamental information for intelligent excavation system (IES), which will increase the efficiency of earthworks and safety of workers in significant.

  • PDF

Analysis of the Operation Performance of the Construction Safety System by Using Construction Accident Data (건설공사 사고 데이터(CSI) 활용을 통한 건설안전제도(안전관리계획서)의 운영성과 분석)

  • Kim, Seong-Deok;Cho, A-Yeong;Lee, Jeong-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.383-384
    • /
    • 2023
  • Using the CSI(Construction Safety Management Integrated Information) data, a comparative analysis was conducted by work type and construction cost according to whether the construction sites were subject to making a safety management plan or not. As a result, by type of work, the ratio of deaths in non-plan sites was high in mechanical facilities and earthworks, and the operation performance of the system was much higher in sites that were less than 5 billion won of construction cost.

  • PDF

Development of a Fleet Management System for Cooperation Among Construction Equipment (건설장비 협업을 위한 플릿관리 시스템 개발)

  • Ahn, Seo-Hyun;Kim, Sung-Keun;Lee, Kwan-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.3
    • /
    • pp.573-586
    • /
    • 2016
  • In construction jobs, a combination of various kinds of machinery is used to perform earthworks at a large-scale site. Individual equipments essentially cooperate with each other on task such as excavation, load, transfer and compaction. While other area have studied cooperation system, related study in domestic construction is in poor condition. In this study, construction equipment fleet management system is developed for solving this problem and find way to improving efficiency in earthworks site. The entire concept of the fleet management system, including its components and process, has been systematically outlined in this paper. An operational methodology has also been suggested, where a number of machines, such as the excavators, trucks and compactors, are chosen and further grouped into a cluster. A case study verify fleet management system's effectiveness on performing task package by comparing existing work method with methodology in this study. Fleet management system in this study is expected to curtail fuel consumption by the reduction of working time and moving distance. Furthermore, it can be anticipated to declining carbon emission effect.

Geo-Morphological Study of Sand Dune for Railway Project in UAE (UAE 내 철도프로젝트 수행을 위한 사막 사구의 지형학적 특성 연구)

  • Moon, Joon-Shik;Kim, Jae-Young;Lee, Seung-Bok
    • Journal of the Korean Geotechnical Society
    • /
    • v.28 no.9
    • /
    • pp.17-22
    • /
    • 2012
  • Wind blown sand is expected to disrupt the operation of the railway as the presented railway project in this paper consists of large earthworks in extreme topography of the mega dune fields. For successful railway construction in sand dune area, effective mitigation measure is the most important factor to protect the track from wind blown sand. The effective mitigation measure requires an integrated consideration of the earthworks geometry and the direct control measures such as fence system. Basically there's no perfect measure protecting railway track from wind blown sand, and it would be more economical and effective to develop robust, deliberate maintenance program for track and direct control measure on the basis of geo-morphological study. The purpose of this study is to identify the large scale geo-morphological terrains and specific sand dune morphology in the project area in UAE and estimate the direction and migration rate for sand dunes with the local variations in prevailing wind directions by undertaking literature review, and aerial photographs, satellite images, and ground studies.

A Study for Deriving Target CMV (Compaction Meter Value) of Intelligent Compaction Earthwork Quality Control (토공사 지능형 다짐 품질관리를 위한 목표 CMV(Compaction Meter Value) 도출 방안에 관한 연구)

  • Choi, Changho;Jeong, Yeong-Hoon;Baek, Sung-Ha;Kim, Jin-Young;Kim, Namgyu;Cho, Jin-Woo
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.9
    • /
    • pp.25-36
    • /
    • 2021
  • Recently, the intelligent compaction technology for quality control of earthworks has brought attention as a quality control standard for earthworks. In this study, intelligent compaction technology and earthwork quality control methods were investigated and earthwork quality control procedures using intelligent compaction technology were considered based on field tests. Through the field compaction test of the silty sand (SM) fill material, it was confirmed that CMV and bearing capcaity index from plate load tests increased as the number of compactions increased. Based on the field test data, the average CMV and quality control target CMV were derived. The target CMV (34.2) was calculated through the correlation with the bearing capacity index of the plate load test, and the target CMV (36.6) was calculated through the analysis of the CMV increase rate. In this paper, the on-site compaction quality management procedure and methodology using intelligent compaction technology were discussed, and an intelligent compaction quality management method was proposed to promote the applicability of the technology.

Attribute Data Management for Developing the Database of a 3D Earthwork BIM System (3D 토공 BIM 시스템 데이터베이스 구축을 위한 속성 데이터 관리)

  • Moon, Sungwoo;Seo, Jongwon
    • Journal of KIBIM
    • /
    • v.6 no.4
    • /
    • pp.27-34
    • /
    • 2016
  • A Building Information Model (BIM) is an attempt to simulate the process of building structures in a three-dimensional (3D) digital space. While the technology is usually applied to structured buildings, bridges, and underground facilities, it is rarely applied to an unstructured environment of earthwork operations. If a BIM is used for earthworks, the 3D simulation can be used for construction equipment guidance and earthwork management. This paper presents a real-time, 3D earthwork BIM that provides a 3D graphical simulation of excavators in conjunction with geographic modeling. Developing a real-time, 3D earthwork BIM requires handling a variety of factors, such as geographical information and vehicular movement. This paper mainly focuses on the management of these attributes and provides a database design for storing and retrieving data. In an example application, a prototype of the 3D earthwork BIM is presented to understand what it would provide when used during earthwork operations at a construction site.

Development of a Virtual Excavator using SimMechanics and SimHydraulic (SimMechanics SimHydraulic을 이용한 가상 굴삭기 개발)

  • Le, Q.H.;Jeong, Y.M.;Nguyen, C.T.;Yang, S.Y.
    • Journal of Drive and Control
    • /
    • v.10 no.1
    • /
    • pp.29-36
    • /
    • 2013
  • Excavation is an important work in mining, earth removal and general earthworks. Nowadays, automation in excavator has been studied by several researchers. In the excavator research methods, simulation is one of the low cost methods for applied to test safely. In this paper, designed a virtual hydraulic excavator that with the control and the dynamic. At first, the simulation of hydraulic system for excavator's attachment such as boom, arm and bucket using Matlab/Simhydraulic is presented. Second, the dynamic model of excavator is distributed to combine with the hydraulic system. For controlling this system, electric joysticks are used to operate the orifice open areas in Main Control Valve. The simulation result is described to analysis the performance of this virtual excavator.