• 제목/요약/키워드: duration curve

검색결과 445건 처리시간 0.033초

Load Duration Curve를 이용한 분산전원과 배전계통의 신뢰도 산출 (Reliability Evaluation of Distributed Generation and Distribution System Using Load Duration Curve)

  • 배인수;김진오
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권11호
    • /
    • pp.518-524
    • /
    • 2005
  • This paper presents an analytical method for the reliability evaluation of distribution system, including the distributed generations. Unlike the large sized generations of transmission system, the distributed generations have complexities in analyzing and determining the operation. In the process of evaluate reliability, it can be shown that the analytical method is simpler than the Monte-Carlo simulation and the method using Load Duration Curve model is more accurate than that using peak load model. The modeling of distributed generation to analysis distribution system reliability using LDC is proposed in this Paper, and is compared with the MCS method as a result of case studies.

SWAT와 부하지속곡선을 이용한 유역 수질 관리방안 (Watershed Water Quality Management Plan Using SWAT and Load Duration Curve)

  • 갈병석;조소현;박천동;문현생;주용은;박재범
    • 한국지리정보학회지
    • /
    • 제24권3호
    • /
    • pp.41-57
    • /
    • 2021
  • 본 연구는 대청호 상류에 있는 서화천 유역을 대상으로 SWAT(Soil and Watershed Assessment Tool) 모형을 이용한 수질 관리 대책 적용 및 부하지속곡선(LDC, Load Duration Curve)을 이용한 대책의 효율을 평가하였다. 수질 관리 대책으로는 인공습지, 방치 축분 저감, 비닐하우스 유출량 저감, 생태하천 복원, LID(Low Impact Development) 기술 적용, 점오염원 관리를 적용하였다. 적용된 기술은 부하지속곡선을 통해 유황별 목표 수질 초과율 및 부하량 저감 정도를 이용하여 수질 개선대책의 효율을 평가하였다. 부하지속곡선은 SWAT를 이용하여 장기 유량지속곡선(FDC, Flow Duration Curve)을 만들고 목표 수질을 곱하여 작성하였으며 목표 수질은 서화천 하류에 있는 옥천천 수질 관측지점의 10년간 자료를 사용하여 60분위에 해당하는 값을 목표 수질로 설정하였다. 본 연구를 통하여 여러 가지 수질 대책을 SWAT 모형을 통해 적용 가능성을 확인할 수 있으며 부하지속곡선을 통하여 유황에 따른 시기별 적용 가능성을 검토할 수 있었다.

유량-부하량관계식을 이용한 지석천 유역의 부하지속곡선 적용 및 유황별 유달율 산정 (Application of Load Duration Curve and Estimation of Delivery Ratio by Flow Durations Using Discharge-Load Rating Curve at Jiseok Stream Watershed)

  • 박진환;김갑순;황경섭;이용운;임병진
    • 한국물환경학회지
    • /
    • 제29권4호
    • /
    • pp.523-530
    • /
    • 2013
  • This study has been carried out to clarify the characteristics of discharge and pollutant loading according to flow conditions at jiseok stream watershed (JSW). A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. By using the methods above, I've evaluated the water quality (WQ) of the JSW if it is satisfied with the standard target. I've collected the data of BOD and T-P from the JSW every 8 days for the duration of 12 months. And then, I've schematized the data upon the load duration curve and the results showed me that the WQ of JSW was satisfied with the standard target. I've also collected the same data every each day for the duration of 12 months from JSW and have schematized the data again. And the results showed that it also was satisfied with the standard target. To be concluded, I've determined that point pollution sources of JSW gives more significant impacts to the WQ than non-point pollution sources of JSW and hence, as time goes, point pollution sources will keep depriciating the WQ of JSW. Therefore, further efforts will be required to JSW to maintain the WQ.

부하지속곡선(Load Duration Curve; LDC)을 이용한 한강수계 오염총량관리 목표수질 평가방법 적용 방안 (Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds)

  • 김은경;류지철;김홍태;김용석;신동석
    • 한국물환경학회지
    • /
    • 제31권6호
    • /
    • pp.732-738
    • /
    • 2015
  • Water quality in four major river basin in Korea was managed with Total Maximum Daily Load (TMDL) System. The unit watershed in TMDL system has been evaluated with Target Water Quality (TWQ) assessment using average water quality, without considering its volume of water quantity. As results, although unit watershed are obtained its TWQ, its allocated loads were not satisfied and vice versa. To solve these problems, a number of TWQ assessments with using Load Duration Curve (LDC) have been studied at other watersheds. The purpose of this study was to evaluate achievement of TWQ with Flow Duration Curve (FDC) and Load Duration Curve(LDC) at 26 unit watersheds in Han river basin. The results showed that achievement rates in TWQ assessment with current method and with LDC were 50~56 % and 69~73%, respectively. Because of increasing about 20% of achievement rates with using LDC, the number of exceeded unit watershed at Han river Basin was decreased about 4~6 unit watersheds.

부하지속곡선을 이용한 유량 조건별 수질특성 평가 - 영본A 유역을 대상으로 - (Water Quality Characteristics Evaluation by Flow Conditions Using Load Duration Curve - in Youngbon A Watershed -)

  • 박진환;김갑순;정재운;황경섭;문명진;함상인;임병진
    • 환경영향평가
    • /
    • 제22권4호
    • /
    • pp.319-327
    • /
    • 2013
  • This study was conducted to identify runoff characteristics of pollutants using flow duration curve(FDC) and load duration curve(LDC) in Youngbon A watershed during 2009~2011. A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. From these methods, BOD, T-N, and T-P have evaluated whether water quality standards would have attained. Results showed that BOD loads of about 50% plotted above the LDC, while T-N and T-P loads of about 50% plotted below the curve. It means that BOD of about 50% have exceeded the water quality criteria, while T-N and T-P of about 50% have complied with the water quality standards. Meanwhile, BOD, TN and T-P loads plotted above the LDC of low flows, implying that they were more affected by point pollution sources than nonpoint pollution sources in the study watershed.

유황곡선의 거동특성을 이용한 유역관리모형의 평가 (The Evaluation of Watershed Management Model using Behavioral Characteristics of Flow-duration Curve)

  • 김주철;이상진;신현호;황만하
    • 한국물환경학회지
    • /
    • 제25권4호
    • /
    • pp.573-579
    • /
    • 2009
  • The performance of Rainfall-Runoff Forecasting System (RRFS), the watershed management model for the Geum river basin, is evaluated based on the agreement between the simulated and observed hydrographs and the behavioral characteristics of the flow-duration curves. As a result, the simulated hydrographs are well agreed with the observed ones except high flow discharges. It is inferred that most of the errors in the simulated hydrographs are due to the misestimation of agricultural water use in $2^{nd}$ quarter and the discrepancy of the peak discharges in $3^{rd}$ quarter. It is however judged that RRFS would give the reliable runoff hydrographs from the point of view of continuous model application. And simulated flow-duration curves and flow-duration coefficients are also similar to the observed ones except flood flow region. From the above result it is confirmed that the construction of Yongdam dam improves the state of flow-duration curve at the Gongjoo station.

낙동강수계 수질오염총량관리를 위한 시범소유역 유황별 유달율 산정방법 연구 (A Study on Estimation of the Delivery Ratio by Flow Duration in a Small-Scale Test Bed for Managing TMDL in Nakdong River)

  • 손태석;박재범;신현석
    • 한국물환경학회지
    • /
    • 제25권5호
    • /
    • pp.792-802
    • /
    • 2009
  • The objective of this study is to construct the watershed management system with link of the non-point sources model and to estimate delivery ratio duration curves for various pollutants. For the total water pollution load management system, non-point source model should be performed with the study of the characteristic about non-point sources and loadings of non-point source and the allotment of pollutant in each area. In this study, daily flow rates and delivered pollutant loads of Nakdong river basin are simulated with modified TANK model and minimum variance unbiased estimator and SWAT model. Based on the simulation results, flow duration curves, load duration curves, and delivery ratio duration curves have been established. Then GIS analysis is performed to obtain several hydrological geomorphic characteristics such as watershed area, stream length, watershed slope and runoff curve number. As a result, the SWAT simulation results show good agreements in terms of discharge, BOD, TN, TP but for more exact simulation should be kept studying about variables and parameters which are needed for simulation. And as a result of the characteristic discharges, pollutants loading with the runoff and delivery ratios, non-point sources effects were higher than point sources effects in the small-scale test bed of Nakdong river basin.

부분적으로 반복되는 프로젝트를 위한 프로젝트 내$\cdot$외 학습을 이용한 프로젝트기간예측과 위험분석 (Project Duration Estimation and Risk Analysis Using Intra-and Inter-Project Learning for Partially Repetitive Projects)

  • 조성빈
    • 한국경영과학회지
    • /
    • 제30권3호
    • /
    • pp.137-149
    • /
    • 2005
  • This study proposes a framework enhancing the accuracy of estimation for project duration by combining linear Bayesian updating scheme with the learning curve effect. Activities in a particular project might share resources in various forms and might be affected by risk factors such as weather Statistical dependence stemming from such resource or risk sharing might help us learn about the duration of upcoming activities in the Bayesian model. We illustrate, using a Monte Carlo simulation, that for partially repetitive projects a higher degree of statistical dependence among activity duration results in more variation in estimating the project duration in total, although more accurate forecasting Is achievable for the duration of an individual activity.

시계열 부하 곡선을 이용한 수체손상 평가 및 다변량 분석 -지석천 유역을 대상으로- (Evaluation of Impaired Waterbody and Multivariate Analysis Using Time Series Load Curve -in Jiseok Stream Watershed-)

  • 박진환;강태우;한성욱;백승권;강태구;유제철;김영석
    • 한국물환경학회지
    • /
    • 제33권6호
    • /
    • pp.650-660
    • /
    • 2017
  • In this study, pollutant emission characteristics by water damage period analyzed 11 items (water temperature, pH, DO, EC, BOD, COD, TOC, SS, T-N, T-P and flow) with load duration curve, time series load curve and factor analysis for three years (2014-2016). Load duration curve is applied to judge the level of impaired waterbody and estimate impaired level by pollutants such as BOD and T-P in this study depending on variation of stream flow. Water quality standard exceeded the flow of mid-range and low-range by flow condition evaluation using load duration curve. This watershed was influenced by point source more than non-point source. Cumulative excess rate of BOD and T-P kept water quality standard for all seasons (spring, summer, autumn and winter) except BOD 59% in spring. Water quality changes were influenced by pollutants of basic environmental treatment facilities and agricultural areas during spring and summer. Results of factor analysis were classified commonly first factor (BOD, COD, and TOC) and second factor (flow, water temperature and SS). Therefore, effects of artificial pollutants and maintenance water must be controlled seasonally and reduced relative to water damage caused by point pollution sources with effluent standard strengthened in the target watershed.

일 최빈유량을 이용한 유황곡선 개선방안 (Improved method of the conventional flow duration curve by using daily mode discharges)

  • 박태선
    • 한국수자원학회논문집
    • /
    • 제54권6호
    • /
    • pp.355-363
    • /
    • 2021
  • 기존의 유황곡선은 일유량의 수문학적 지속성을 고려하지 못하며, 산술평균으로 인한 일유량의 왜곡이 발생되고, 특정유량의 발생시점이나 지속기간도 알 수 없다. 본 연구에서는 매년의 일유량을 발생일자별로 정렬한 후, 일 최빈유량을 산정하고, 이들을 5일 단위로 평균하여 나타내는 일 최빈유량곡선법을 제시하였다. 4대강 본류의 상·하류 각 1곳 씩 총 8개 지점의 장기간 관측 일유량 자료를 이용하여 검토한 결과, 연중 일유량은 수문학적 지속성을 가지는 것으로 나타났다. 또한, 일 최빈유량곡선법을 이용하면 산술평균에 따른 일유량의 왜곡을 완화시킬 수 있고, 특정유량의 발생시점과 지속기간도 파악할 수 있다. 일 최빈유량곡선법은 유황분석 기준유량별(갈수유량, 저수유량, 평수유량, 풍수유량, 홍수유량)로 유용하게 활용할 수 있다.