• 제목/요약/키워드: drainage field test

검색결과 91건 처리시간 0.024초

시험시공을 통한 일방향 배수필터의 성능 평가 (Evaluation of the Performance of One-way Drainage Filter by Field Test)

  • 서동욱;김현태
    • 한국농공학회논문집
    • /
    • 제54권4호
    • /
    • pp.47-53
    • /
    • 2012
  • It is needed to install a one-way drainage filter to prevent a seepage from lake or river outside of embankment and to promote a drainage from a flood inside of embankment when dikes such as lake dike, river dike, etc are constructed. However, the results of research for one-way drainage filter are insufficient. Therefore, through the field test of one-way drainage filter, this study checked a function of one-way drainage filter with a test of performance. As a result of field test, water flow in dike was blocked in the interception direction of the section that one-way drainage filter was installed, but water passed to the flow allowance direction of the section. Therefore we confirmed the function of one-way drainage filter. Seepage quantity in the flow allowance direction of the one-way drainage filter section was low as 74.6~80.5 % than that in the section without installation of filter because of a reduction effect of seepage with filter. And seepage quantity of field test was low as 64.3~90.0 % than that in results of seepage analysis because the coefficient of permeability of embankment in field is different from the results of laboratory test. In the future, more study will be needed to solve several problems which are related to fix the filter on slide, durability of filter, etc.

2차원 유한체적 수치모형을 이용한 대구획 논의 배수특성 분석 (An Analysis of Drainage Characteristics at Large-Sized Paddy Fields Using a Two-Dimensional Numerical Model)

  • 박승우;박종민;강민구
    • 한국농공학회논문집
    • /
    • 제46권3호
    • /
    • pp.3-14
    • /
    • 2004
  • A two-dimensional numerical model based on a finite volume method was formulated to solve the shallow water equations and applied for evaluating drainage characteristics at large-sized paddy fields. Manning roughness coefficient was calibrated using the observed inundating depths at drainage tests, and used for validating the model with the results from another drainage test. The simulated results were in good agreement with the observed inundating depths. The result of surface drainage showed that the longer width of the outlet was or the more the number of drainage outlet was, the shorter the drainage time was taken, and the larger the size of the field become, the longer the drainage time was taken, and the field shape had little effect on drainage time. To reduce the drainage time to 24 hours, the outlet is located lower than the elevation of the basin and small drainage ditch is constructed at the field. The results showed that the drainage time was taken short as the small drainage ditch was constructed. The comparison of drainage time as to the size of field constructed small drainage ditch showed the field, 100m ${\times}$ 200 m, can be drained in 24 hours.

모형실험 및 현장계측을 통한 배수형 쉴드터널의 작용수압 저감 평가 (The study on the hydraulic pressure reduction of drainage shield tunnel using model test and field instrumentation)

  • 김동민;마상준;이영섭
    • 한국터널지하공간학회 논문집
    • /
    • 제17권4호
    • /
    • pp.429-440
    • /
    • 2015
  • 본 연구에서는 배수형 쉴드터널 적용시 작용수압의 저감을 평가하기 위해 모형실험장치를 개발하여 배수 및 비배수 조건에서 작용수압 차이를 실험하였다. 모형실험 결과 배수 조건에서 간극수압 증가율이 감소하는 경향을 보였고, 비배수 조건에 비해 전응력이 더 작게 나타나 모형터널 내 지하수 유입에 의해 작용수압이 저감되는 것으로 나타났다. 현장계측 결과 쉴드터널 배면 지반 내 작용수압은 지하수위로 계산되는 수압($r_w{\cdot}H$)보다 약 11~22%정도 적게 나타났다. 모형실험 및 현장계측 결과에서 배수 및 비배수 조건의 이론적인 설계수압과 작용수압의 차이가 나타났는데, 배수형 쉴드터널 적용시 기존 설계수압보다 감소된 수압을 적용하는 것이 가능할 것으로 판단되며, 수압 감소를 통해 세그먼트 단면 축소도 가능할 것으로 판단된다.

Performance evaluation of a subsurface drainage culvert system in converted paddy fields

  • Do, Jong Won;Park, Jongseok;Kim, Hyuntai;Lee, Kwangya;Shin, Hyungjin
    • 농업과학연구
    • /
    • 제47권2호
    • /
    • pp.263-273
    • /
    • 2020
  • With the change of the agricultural environment (increased rice production, decreased rice consumption, and rice production policies), converting paddy fields into upland fields is an increasing trend. In terms of conversion into upland fields, subsurface drainage is one of the most important factors for good field crop growth. This study evaluates the performance of a subsurface drainage culvert system in paddy fields and reclaimed lands. The obtained results are briefly summarized as follows: 1) After a comparative evaluation of several subsurface drainage culvert systems, including excavated subsurface drainage and non-excavated subsurface drainage types, type 3 (non-excavated, perforated drain pipe 50 mm, filter mat B50 cm, subsoiling 70 cm and culvert spacing 5 m) shows relatively high values among four types in terms of effectiveness (subsurface discharge capability) and economic efficiency (construction cost). 2) Type 3 has proven that it is suitable for design standards of discharge capacity through field tests performed in paddy fields (three sites: Gong-geom, Gae-san, Juk-san) and reclaimed lands (two sites: Gum-ho, Mi-am). 3) In the experiment of Sesamum indicum growth according to the existence of a drainage system, Sesamum indicum growth with a subsurface drainage culvert system had good value in terms of plant shoot and root length, shoot fresh and dry weight, and root fresh and dry weight).

직류전기철도 전식대책 실증실험(1) 누설전류 배류시스템 (Field Test of Mitigation Methods for Stray Currents from DC Electric Railroad(1) Stray Current Drainage System)

  • 하윤철;배정효;하태현;이현구;김대경;최정희
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 추계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.220-222
    • /
    • 2007
  • With the wide spread of direct current (DC) electric railroads in Korea, the stray currents or leakage currents from negative return rails become a pending problem to the safety of nearby underground infrastructures. The most widely used mitigation method for this interference is the stray current drainage method, which connects the underground metallic structures to the rails with diodes (polarized drainage) or thyristor (forced drainage). Although this method inherently possesses some drawbacks, its cost effectiveness and efficiency to protect the interfered structures has been the main reason for the wide adoption. In this paper, we show the field test results for the application of stray current drainage system to a city gas pipeline paralleling a depot area of a metropolitan rapid transit system. The process for optimal positioning is briefly illustrated. The effectiveness of constant voltage, constant current, and constant potential drainage schemes was also described.

  • PDF

The Field Test of a Mitigation Method from DC Subwaysystem for Underground Pipeline

  • Bae, Jeong-Hyo;Ha, Tae-Hyun;Ha, Yoon-Cheol;Lee, Hyun-Goo;Kim, Dae-Kyeong
    • Corrosion Science and Technology
    • /
    • 제6권6호
    • /
    • pp.308-310
    • /
    • 2007
  • The owner of underground metallic structures (gas pipeline, oil pipeline, water pipeline, etc) has a burden of responsibility for the corrosion protection in order to prevent big accidents like gas explosion, soil pollution, leakage and so on. So far, Cathodic Protection(CP) technology have been implemented for protection of underground systems. The stray current from DC subway system in Korea has affected the cathodic protection (CP) design of the buried pipelines adjacent to the railroads. In this aspect, KERI has developed a various mitigation method, drainage system through steel bar under the rail, a stray current gathering mesh system, insulation method between yard and main line, distributed ICCP(Impressed Current Cathodic System), High speed response rectifier, restrictive drainage system, Boding ICCP system. We installed the mitigation system at the real field and test of its efficiency in Busan and Seoul, Korea. In this paper, the results of field test, especially, distributed ICCP are described.

운영중인 지하구조물 누수처리를 위한 유도배수공법 개발 및 성능 검증 (Development and performance verification of induced drainage method for leakage treatment in existing underground structures)

  • 김동규;임민진
    • 한국터널지하공간학회 논문집
    • /
    • 제19권3호
    • /
    • pp.533-549
    • /
    • 2017
  • 본 연구에서는 지하 콘크리트 구조물 내로 누수된 지하수를 유도하여 배수하는 유도배수공법을 제시하였다. 유도배수공법은 유도배수판, 철망, 고정핀, 광물질 혼입 모르타르로 구성된다. 시공성 향상을 위하여 유도배수판 및 철망은 공압타카와 고정핀를 사용하여 콘크리트 표면에 부착하였다. 고로슬래그미분말을 30% 혼입한 모르타르는 뿜어 붙임 모르타르 장비를 사용하여 유도배수판 및 철망 표면에 타설하였다. 유도배수공법의 현장 시공성 및 성능 검증을 위하여 재래식 콘크리트라이닝 터널과 콘크리트 옹벽에서 시험시공을 수행하였다. 시험시공 완료 3년 후 유도배수공법은 성능저하의 문제점이 없는 것으로 판단되었다. 재령 14일과 3년에 뿜어 붙임 모르타르의 부착력 실험을 수행하였다. 유도배수판 표면에 철망을 적용한 경우 뿜어 붙인 모르타르의 부착력은 재령 14일에 1.04 MPa, 재령 3년에 1.46 MPa로 측정되었다. 철망을 적용하지 않은 경우의 부착력은 재령 14일에 1.13 MPa로 측정되었지만, 재령 3년에는 0.89 MPa로 기준 부착력 1 MPa보다 낮게 측정되었다.

콘크리트 지하구조물 누수 처리를 위한 유도배수시스템 (Drainage system for leakage treatment of cement concrete structure in underground)

  • 김동규
    • 한국터널지하공간학회 논문집
    • /
    • 제21권4호
    • /
    • pp.573-585
    • /
    • 2019
  • 본 연구의 목적은 운영 중인 콘크리트 지하구조물에서 발생하는 누수를 유도배수하기 위하여 시공성, 차수 및 유도배수 성능을 향상시킨 유도배수시스템을 제안하는 것이다. 기존 유도배수시스템에서 제기된 유도배수관의 시공성 및 누수를 개선하였다. 개선된 유도배수관을 적용한 유도배수시스템은 시공성, 차수 및 유도배수 성능에 대한 현장평가를 위하여 재래식 콘크리트 라이닝 터널에서 시험 시공되었다. 재령 3주, 6주, 9주, 11주, 14주, 17주 및 23주차에 개선된 유도배수시스템 배면에 약 1,000 ml 이상의 붉은색 물을 주입하여 유도배수시스템의 차수와 유도배수 성능을 평가하였다. 현장 성능평가 실험이 진행된 6개월 동안 터널이 위치한 지역의 일일 평균 온도는 $-12.4{\sim}19.7^{\circ}C$이며 일일 최저 온도는 $-17.2^{\circ}C$이고 일일 최고 온도는 $26.7^{\circ}C$였다. 현장 성능평가 실험이 진행되는 6개월 동안 개선된 유도배수시스템에서는 누수가 발생하지 않았다. 또한 개선된 유도배수관에서도 누수가 발생하지 않았다. 개선된 유도배수시스템은 누수가 발생하는 다양한 콘크리트 지하구조물에서 적용가능하며 계절적 영향도 거의 받지 않는 것으로 판단되었다.

Fish Exposure and In Situ Field Pilot Tests in the Abandoned Mine Drainage for a Stream Restoration

  • Bae, Dae-Yeul;Kim, Ju-Yong;Kim, Kyoung-Woong;An, Kwang-Guk
    • 생태와환경
    • /
    • 제40권4호
    • /
    • pp.560-568
    • /
    • 2007
  • The objectives of this study were to analyze ecological effects on effluents from the Sagok Stream (Chonnam province) as an abandoned mine drainage through necropsy-based health assessments and fish exposure tests, and to conduct In situ field pilot tests for restoration of stream water. Also, we analyzed water quality including general parameters and heavy metals. The tests were performed three times on April 2005, April 2006, and April 2007. Also, we constructed a reactor facility in the outflowing point of the abandoned mine for the remediation of AMD wastewater. In lab test, death rates in all three treatments were ${\geq}50%$ in the experiments. Necropsybased fish tissue assessments using the Health Assessment Index (HAI), indicated that the most frequently damaged tissue was liver (average: 20.8). Values of Health Assessment Index were lower in the control than any other treatments of T1, T2, and T3 and three treatments showed a distinct toxicity impacts by the AMD. In situ lethal test, concentration of Fe, Al and Zn decreased particularly by 85%, 99% and 94%, respectively through the disposal facility. Values of pH, ranged from 3.1 to 7.0, increased by 2.3 fold (mean=5.1) along with the reduction of metal contents. All fishes in P1 cage died 100% on 3 days later after the experimental setting, while all fishes in the P6 died 100% on 9 days later. Overall, these results evidently provide a key methodology for pilot test using the disposal facility and also clarify the toxicity of AMD once again, so this approach used in the pilot facilities here may reduce the acidic and toxic effects in the abandoned mining drainage.

투수시험과 지하수 모니터링을 통한 매립층의 배수불량 원인 분석 (Analysis about Fill Deposit Poor Drainage through Permeability Test and Groundwater Monitoring)

  • 정희석;이강일;김준석
    • 한국재난정보학회 논문집
    • /
    • 제14권2호
    • /
    • pp.165-173
    • /
    • 2018
  • 연구목적 : 유적지와 같은 지역은 과거 산으로 둘러 쌓인 구릉지 등에 분포할 경우 강우시 매립층에 분포하는 흙은 투수능력이 떨어져 물이 원활히 배수되지 못하고 표층부의 함수비가 증가하여 지반의 질퍽임 현상이 많이 나타나고 있다. 본 연구는 강우시 배수가 불량하여 유적지에 분포하는 문화재의 기초 뿐만 아니라 상부구조물에도 큰 영향이 예상되어 배수불량의 원인을 파악하고자 하였다. 연구방법 : 현장에서 각종 지반조사 및 현장투수시험 그리고 지하수 모니터링을 통해 그 상관성을 분석하여 매립층의 배수에 대한 불량 원인을 파악하였다. 연구결과 : 본 연구결과 배수불량 원인은 부지내 지하수위가 매우 얕은 심도에 형성되어 있으며, 지표부 및 매립층의 토질은 투수성이 불량한 상태로 강우시 지하로 지표수가 침투되기에는 매우 부적합한 수리지질학적 여건임을 확인할 수 있었다.