Recently, container terminal operators have made efforts to develop an efficient remarshalling plan in response to the increase in automation of equipment handling and transport of containers in the terminals. Usually, containers are handled by multiple AYCs(automated yard cranes) in-yard in an automated container terminal, and terminal operators establish a remarshalling plan using slack time to increase the efficiency of ship operation. This study develops the optimal mathematical model through mixed integer programming as a solution to the problem of dispatching multiple AYCs. Considering the difficulty of direct application to the field due to computation time, we analyze the five prototypical dispatching rules for real world adaptation. A numerical experiment found that the maximum weight ratio (MR) rule and the maximum weight (MW) rule are the ideal dispatching solutions to the multiple AYCs dispatching problem.
Journal of Korean Society of Industrial and Systems Engineering
/
v.38
no.3
/
pp.78-86
/
2015
Up-to-date business environment for manufacturers is very complex and rapidly changing. In other words, companies are facing a variety of changes, such as diversifying customer requirements, shortening product life cycles, and switching to small quantity batch production. In this situation, the companies are introducing the concept of JIT (just-in-time) to solve the problem of on-time production and on-time delivery for survival. Though many companies have introduced ERP (enterprise resource planning) systems and MRP (material requirement planning) systems, the performance of these systems seems to fall short of expectations. In this paper, the case study on introducing an APS (advanced planning and scheduling) system based on dispatching rules to a machining company and on finding a method to establish an efficient production schedule is presented. The case company has trouble creating an effective production plan and schedule, even though it is equipped with an MRP-based ERP system. The APS system is applied to CNC (computer numerical control) machines, which are key machines of the case company. The overall progress of this research is as follows. First, we collect and analyze the master data on individual products and processes of the case company in order to build a production scheduling model. Second, we perform a pre-allocation simulation based on dispatching rules in order to calculate the priority of each order. Third, we perform a set of production simulations applying the priority value in order to evaluate production lead time and tardiness of pre-defined dispatching rules. Finally, we select the optimal dispatching rule suitable for work situation of the case company. As a result, an improved production schedule leads to an increase in production and reduced production lead time.
Order Review/Release (ORR) System is the linkage between planning system and actual production. Reduction of the waiting time on the machines, work in process and lead time variation may be achieved by adopting ORR strategies. But researchers on the ORR do not agree on the effectiveness of ORR. Some say that the overall system flow time may be increased if ORR is adopted, but others say that ORR can reduce work in process, flow time and variation of flow time. The objective of this research is to clarify under what environments order release strategy is effective. Simulation study was conducted in a hypothetical job shop. The experimental results show that dispatching rule is much more important than ORR is in controlling the shop floor. But the results indicate that ORR can reduce mean shop flow time, average work in process and variation of shop flow time under such environments where utilization level is high and planned order is weekly released to the order pool. And the results also show that the effect of plan smoothing on the ORR is insignificant, which is inconsistent with the results of the previous researches.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.2
/
pp.315-324
/
2016
The purpose of this study was to present the future directions for strengthening the TLO(Technology licensing office)s' expertise of universities by examining the impact on utilizing the university management experts for patents and technology transfer. To identify the specific effects of dispatching patent management experts, this study was conducted under various conditions, such as the dispatch status, the dispatching duration of patent management experts and the starting year of dispatching them. The data were analyzed by utilizing the data of the KIPSI's supporting program of dispatching the patent management expert to universities and the data of University Information Disclosure site. The data from a total of 110 four-year universities from 2008 to 2013 were used. According to the analysis result, the technology transfer's performance and technology transfer's income of universities of utilizing the patent management experts compared to universities not utilizing them appeared to be high. Technology transfer and technology transfer income appeared to be higher with a longer period of utilizing the patent management expert at university. This suggests that the direction is required to provide the plan for a longer period to maximize the effect of the program "The dispatching a patent management expert". The technology transfer's performance and technology transfer's income did not increase according to the year of dispatched the patent management expert at the university. A comparison of before and after dispatching, the technology transfer performance appeared to be high after dispatch. This suggests that the effects of dispatching the patent management experts at a university can be interpreted as a subsequent effect, rather than an immediate effect. Therefore, it does not simply limit the effectiveness of the dispatch business in the short term, but it needs to activate the technology transfer organization, such as a patent management expert in the long term.
Forklifts in a shipyard lift and transport heavy objects. Tasks occur dynamically and the rate of the task occurrence changes over time. Especially, the rate of the task occurrence is high immediately after morning and afternoon business hours. The weight of objects varies according to task characteristic, and a forklift also has the workable or allowable weight limit. In this study, we propose an online forklift dispatching algorithm based on nearest-neighbor dispatching rule using minimal cost assignment approach in order to attain the efficient operations. The proposed algorithm considers various types of forklift and multiple jobs at the same time to determine the dispatch plan. We generate dummy forklifts and dummy tasks to handle unbalance in the numbers of forklifts and tasks by taking their capacity limits and weights. In addition, a method of systematic forklift selection is also devised considering the condition of the forklift. The performance indicator is the total travel distance and the average task waiting time. We validate our approach against the priority rule-based method of the previous study by discrete-event simulation.
The display market has been replaced by the FPD (Flat Panel Display) from the CRT (Cathode-Ray Tube) since the late 1990s. In the FPD production line, the most equipment has high price. Thus, when the equipment has multi-function, the repetitive process is arranged for the equipment. However, such disposition of equipment results in more complicated process flow owing to repetitive operations. This reduces the production capacity and increases lead-time in turn. In this paper, we develop an AutoMod simulation system that derives to information about the quantity, production lead-time, utilities of facilities, and occupation rates of racks. In this simulation system, we consider the situation where the equipment might be broken and suspended randomly. For the developed system, we first evaluate a production plan with current layout and then, propose a revised alternative plan. Using the same simulation scheme, we investigate comparing the production quantity and lead-time with the two plans. In addition, for a proposed alternative, we try to forecast the most adequate rule between the two job dispatching rules which are FOR (Fewest Operation Remaining) and FCFS (First Come First Serve) through simulation.
Journal of the Korean Society for Precision Engineering
/
v.14
no.10
/
pp.75-84
/
1997
This paper describes the development of an integrating method for process planning and scheduling activities for block assembly in shipbuilding. A block is composed of several steel plates and steel sections with the predetermined shapes according to the ship design. The parts which constitute the block are manufac- tured by cutting and/or bending operations, which are termed as machining operation in this paper. The machining operation is the first process for block assembly which influences the remaining block assembly processes. Thus process planning and scheduling for machining operation to manufacture parts for block are very important to meet the assembly schedule in the shipyard. An integrating method for process plan- ning and scheduling is developed by introducing the concept of distributed process planning and scheduling composed of initial planning, alternative planning and final planning stages. In initial planning stage, nesting parts information and machining emthods are generated for each steel plate. In alternative plan- ning stage, machine groups are selected and workcenter dispatching information is generated. In final planning stage, cutting sequences are determined. The integrated system is tested by case study. The result shows that the integrated system is more efficient than existing manual planning system.
Competition between ports around the world is intensifying to attract transshipment cargo. However, recently, there have been concerns about the departure of transshipment cargo volume at Busan Port, such as the lifting of the cabotage policy in China's shipping sector and the implementation of a safe fare system. In terms of operation, terminal congestion and vehicle waiting time are seriously occurring due to imbalance in the transshipment volume of each terminal and vehicles concentrated in a specific time period. In this paper, we propose a method of inter-terminal transportation (ITT) using buffer space to solve the problem caused by inefficient ITT systems and presented a mixed integer programming (MIP) for the problem. The effect of using the buffer space was analyzed for various work volumes and capacity fluctuation ranges by applying the terminal congestion pattern and ITT vehicle in/out pattern based on the Busan New Port data.
Since a declaration between North and South Korea was adopted, North and South Korea has strengthened the interchange and cooperation between each other in many fields. Especially, the interchange and cooperation in the field of industrial property right, such as patent and trademark, are required to keep up with the age of the knowledge industry. But, until a recent date, there has been little interchange or cooperation in the field of industrial property right, and a few major companies were attempt to apply for the patent in North Korea through the Third country The system of industrial property laws in North and South Korea are very different because of time and political ideology barriers. To unify the system of industrial property laws in North and South Korea, firstly, North and South Korea must try to recognize and understand the dissimilarity between them. In this article, I compared the system of industrial property law of South Korea with that of North Korea to search commonalities and dissimilarities. Furthermore, it is needed to establish systematic devices for understanding of between North and South Korea, for instance, conducting a interdisciplinary seminar or dispatching a judge mutually. Finally, it is necessary to phase in a practical plan for unification. In the short run, mutual application and registration have to be authorized, and in the long view, unifying the practice of industrial property law service is needed. At the conclusion, the industrial property laws in North and South Korea can be unified systematically. In other words , to unify system of industrial property laws in North and South Korea, it is prerequisite that mutual understanding of industrial property laws and performance of the unify plan. The interchange and cooperation in this field will not only promote technical development but also create common interests of North and South Korea by expanding an opportunity for creating and utilizing industrial property.
Journal of the Korean Operations Research and Management Science Society
/
v.28
no.1
/
pp.1-10
/
2003
A recent trend In flexible manufacturing systems (FMS) Is to utilize the Identical versatile machines with fast tool delivery devices. Unlike a conventional FMS where parts are fed to the machines with the required tools, tools are acquired from other machines using a tool delivery system and parts can be finished on the same machine In these FMS. Therefore it Is more important problem 4o plan tool flow using tool delivery system In these FMS rather than part flow In conventional FMS. According to the existing study, In FMS 20∼30 percent of the total management cost Is the cost related with tools and It Is possible to reduce the tool Inventory by 40 percent using efficient tool allocation. In this study, In FMS under dynamic tool allocation strategy, a new method of part release considering tool flow at the stage of part release Is proposed. In order to prove the efficiency of the proposed part release It is compared with other part release through simulation experiments. Performance measures in these experiments are the throughput and the number of tardy parts.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.