Remarshalling Planning for Multiple Automated Yard Cranes Considering Slack Time

여유시간을 고려한 다수 자동화 야드 크레인의 이적작업 일정계획

  • 박영만 (해군사관학교 국방경영학과)
  • Received : 2016.11.17
  • Accepted : 2017.05.08
  • Published : 2017.06.30

Abstract

Recently, container terminal operators have made efforts to develop an efficient remarshalling plan in response to the increase in automation of equipment handling and transport of containers in the terminals. Usually, containers are handled by multiple AYCs(automated yard cranes) in-yard in an automated container terminal, and terminal operators establish a remarshalling plan using slack time to increase the efficiency of ship operation. This study develops the optimal mathematical model through mixed integer programming as a solution to the problem of dispatching multiple AYCs. Considering the difficulty of direct application to the field due to computation time, we analyze the five prototypical dispatching rules for real world adaptation. A numerical experiment found that the maximum weight ratio (MR) rule and the maximum weight (MW) rule are the ideal dispatching solutions to the multiple AYCs dispatching problem.

최근 컨테이너 터미널에서는 야드 장비의 자동화 및 환적화물의 증가로 인하여 터미널내의 이적작업이 증가하고 있으며 이에 따라 터미널 운영자들은 효율적인 이적작업 계획을 수립하고자 노력하고 있다. 보통 자동화 컨테이너 터미널에서는 장치장에 다수의 자동화된 야드 크레인을 사용하여 컨테이너를 취급하고 있으며 선적작업의 효율을 높이기 위하여 여유시간대를 이용하여 이적작업을 수행하고 있다. 본 연구는 블록 내에서 다수의 자동화 야드 크레인이 운영되고 있는 경우의 이적작업 계획을 다루고 있으며 혼합정수계획법을 이용하여 주어진 여유 시간을 고려하여 작업효율을 최대화하는 각 크레인 별 최적 이적작업 계획을 수립하는 수리모형을 제시하였다. 또한 컨테이너 터미널 현장에서 쉽게 적용할 수 있도록 빠른 시간 안에 이적작업계획을 수립할 수 있는 작업 할당규칙을 찾기 위하여 다섯 가지 대표적인 할당규칙에 대하여 수치 실험을 통하여 유용성을 분석하였다. 수치 실험 결과 작업할당 규칙 중에서 MR규칙과 MW규칙이 다수 자동화 야드 크레인의 이적작업 할당규칙으로 좋은 성능을 발휘하는 것으로 나타났다.

Keywords

References

  1. Bae, J. W. and Park, Y.-M.(2011), "Integrated Decision-making for Sequencing and Storage Location of Export Containers at a Receiving Operation in the Container Terminal with a Perpendicular Layout", Journal of Navigation and Port Research, Vol. 35, No. 8, pp. 657-665. https://doi.org/10.5394/KINPR.2011.35.8.657
  2. Bae, J. W. and Park, Y.-M.(2012), "Yard Crane Dispatching for Remarshalling in an Automated Container Terminal", Journal of Navigation and Port Research, Vol. 36, No. 8, pp. 665-671. https://doi.org/10.5394/KINPR.2012.36.8.665
  3. Bae, J. W., Park, Y.-M. and Kim, K. H.(2008), "Export Container Remarshalling Planning in Automated Container Terminal Considering Time Value", Journal of the Korean Operations Research and Management Science Society, Vol. 33, No. 2, pp. 75-86.
  4. Kang, J., Oh, M.-S., Ryu, K. R. and Kim, K. H.(2005), "Sequencing Container Moves for Intra-Block Remarshalling in a Container Terminal Yard", Journal of Navigation and Port Research, Vol. 29, No. 1, pp. 83-90. https://doi.org/10.5394/KINPR.2005.29.1.083
  5. Kim, K. H. and Bae, J. W.(1998), "Re-marshalling Export Containers in Port Container Terminals", Computer & Industrial Engineering, Vol. 35, pp. 655-658. https://doi.org/10.1016/S0360-8352(98)00182-X
  6. Kim, K. H., Lee, K. M. and Hwang, H.(2003), "Sequencing Delivery and Receiving Operations for Yard Cranes in Port Container Terminals", International Journal of Production Economics, Vol. 84, pp. 283-292. https://doi.org/10.1016/S0925-5273(02)00466-8
  7. Kim, K. H. and Park, Y.-M.(2004), "A Crane Scheduling Method for Port Container Terminals", European Journal of Operational Research, Vol. 156, pp. 752-768. https://doi.org/10.1016/S0377-2217(03)00133-4
  8. Oh, M.-S., Kang, J., Ryu, K. R. and Kim, K. H.(2005), "Heuristic Approach to Scheduling Multiple Cranes for Intra-Block Remarshalling", Journal of Navigation and Port Research, Vol. 29, No. 5, pp. 447-455. https://doi.org/10.5394/KINPR.2005.29.5.447
  9. Yun, W.-Y., Lee, J.-H. and Choi, Y.-S.(2003), "A Study on Remarshalling Operation in Automated Container Terminal", Journal of the Korea Society for Simulation, Vol. 12, No. 3, pp. 21-29.