• Title/Summary/Keyword: discharge rating curve

Search Result 92, Processing Time 0.032 seconds

Development of a Stream Discharge Estimation Program (자연하천 유량산정 프로그램 개발)

  • Lee Sang Jin;Hwang Man Ha;Lee Bae Sung;Ko Ick Hwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.48 no.1
    • /
    • pp.27-38
    • /
    • 2006
  • In this study, we developed a program to estimate discharge efficiently considering major hydraulic characteristic including water level, river bed, water slope and roughness coefficient in a natural river. Stream discharge was measured at Gongju gauge station located in the down stream of the Daechung Dam during normal and dry seasons from 2003 to 2004. The developed model was compared with the results from the existing rating curve at T/M gage stations, and was used for runoff analyses. Evaluating the developed river discharge estimation program, it was applied during 1983-2004 that base flow separation method and RRFS (Rainfall Runoff Forecasting System) which is based on SSARR (Streamflow Synthesis And Resevoir Regulation). The result presents the stage-discharge curve creator range at the Gong-ju is overestimated by approximately $10-20\%$, especially at the low stage. It is attributed to the hydraulic characteristics at the study. The discharge simulated by the RRFS and base flow separation, which is calibrated using the measurement at the early spring and late fall season during relatively d]v season, shows the least errors. The coefficient of roughness at Gongju station varied with the high and low water level.

A Monte Carlo Simulation and 1D Hydraulic Model-Based Approach for Estimating River Discharge at the Confluence using Artificial Multi-Segmented Rating Curves (K-RIVER와 Monte Carlo 방법을 이용한 홍수기 간접유량 추정 기법)

  • 강한솔;김연수;노준우;허영택;변지선;안현욱
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.483-483
    • /
    • 2023
  • 2020년 8월 섬진강 유역에서 100년 빈도 이상의 대홍수가 발생함에 따라 제방이 붕괴되거나 하천 범람이 발생하는 피해가 발생하였다. 8월 홍수를 대상으로 섬진강 본류 남원(신덕리) 수위국에서 기존의 수위-유량 관계 곡선식(이하 Rating curve)의 최대 적용 가능 수위는 2.53m 이지만, 해당 기간 첨두 수위는 10m 이상을 기록하였다. 이러한 대홍수의 경우 기왕의 관측데이터가 없을 뿐만 아니라 기존의 Rating curve를 외삽하여 활용하는 것에도 한계가 있어 간접적으로 유량을 산정할 수 있는 기법이 필요하다. 본 연구에서는 이와 같이 유량측정이 어려운 지점을 대상으로 주어진 유량에 대하여 수위를 재현할 수 있는 K-water에서 개발된 K-River모형(1차원 하천수리해석모형)과 Monte Carlo 시뮬레이션 기법을 활용하여 간접적으로 유량을 산정할 수 있는 기법을 개발하였다. 개발된 방법론은 고수위 구간에 대한 Rating curve의 불확실성으로 인하여 본류와 지류의 유입량 추정이 어려웠던 섬진강 요천 합류부에 적용하였다. 대상구간은 본류(섬진강) 26km 및 지류(요천) 15km로 구성되어 있으며, 본류와 지류의 상류인 수위국 남원(신덕리) 관측소와 남원(동림교) 관측소에는 각각 기존의 Rating curve가 존재한다. 불확실성이 높은 Rating curve의 고수위 구간에 대한 매개변수를 조정하여 다수의 Rating curve를 생성하고, 이를 기반으로 관측수위를 다수의 상류 시계열 유량자료(경계조건)로 환산하였다. 다음으로 이 유량자료를 기반으로 앙상블 모의를 수행 후 대상구간의 중간지점에 위치한 수위국(고달(고달교) 관측소, 송동(요천대교) 관측소, 곡성(금곡교) 관측소)에서 수위재현성(NSE, RSR등 활용)을 평가하여 최적 샘플 추출을 추출하였다. 추출된 샘플로부터 상류 경계지점의 적정 Rating curve 선정과 각 지점에서의 시계열 수위 및 유량을 역으로 추정하였다. 이를 통해 실제 유량측정결과 없이도 간접적으로 신뢰도 높은 유량 자료를 확보할 수 있음을 확인할 수 있었으며, 향후 수자원의 효율적 관리 및 홍수관리를 위하여 효율적으로 활용이 가능할 것으로 생각된다.

  • PDF

Operation of Seom River Experimental Watershed in 2007 (2007년 섬강 시험 유역의 운영)

  • Lee, Min-Ho;Choi, Hung-Sik
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.699-702
    • /
    • 2008
  • In this study, it has observed the precipitation and stage data at each point every ten minutes for gaining the sustainable, reliable and high-quality hydrological data through operating the experimental watershed in mountainous areas such as Gyecheon located in the upstream of Seom river that is the tributary of Nam-Han river. And it has regularly surveyed the runoff and verified the reliability of data using the uncertainty analysis at the gaging station. So, this study has developed the stage-discharge curve(rating curve) and these results are expected to be used as fundamental data for analyzing the circulation of water through surveying evapotranspiration, soil moisture and level of groundwater in watershed.

  • PDF

Methodology for segmentation of rating curve (수위-유량관계곡선식 구간분리 방법론 제안)

  • Hwang-Bo, Jong Gu
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.557-563
    • /
    • 2022
  • The rating curve is required to convert measured stage into a discharge and is developed using the measurement. In the development of the rating curve, the segmentation position is determined by considering the hydraulic characteristic and channel shape, and subjective judgment of the Hydrographer may intervene in this process. The segmentation position is so important that it determines the overall form of the rating curve, and the incorrect segmentation can cause errors in the rating curve, especially in extrapolation. In order to develop an accurate rating curve with a small number of measurements, the sections must be divided by considering hydraulic characteristic such as the cross-sectional shape. In this study, hydraulic examination methods such as stage-mean velocity, stage-area, stage-${\sqrt{Q}}$ investigated and supplemented to eliminate subjectivity in segmental positioning. Appropriateness for the segmentation position was verify in consideration of the physical meaning of the rating curve index (c).

Derivation Method of Rating Curve and Relationships for Flow Discharge-Total Sediment at Small-Midium Streams in Agrarian Basin (농경유역 중소하천에서 유량과 총유사량의 관계식 유도방법)

  • Lee, Jong-Seok;Kim, Chi-Gon;You, Eui-Geen
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.8
    • /
    • pp.544-555
    • /
    • 2015
  • This study aims to derivate of the relationship and rating curve for the flow discharge-total sediment using the measured field data from the main points of small-medium stream reaches in agrarian basin. The total sediment of measured data are obtained by bed load added to suspended load which analyzed using the particle size distribution curve of sieve test and the dry or the filtration method from the collected samples by samplers (DH-48, D-74 and BLH-84, BL-84) at the stream bed and the depth-averaged concentration, respectively. These field data had been collected from August 2012 to September 2014 at the seven measuring stations of the national-local channel reaches of the four study streams in the Nonsan river systems of agrarian basin. As a result, the relationships and the rating curve for the flow discharge-total sediment are derived as a function pattern of power law by analyzing on a distribution characteristic of the database set and it will be used as a useful tool to analyze erosion, deposition, and transportation in theoretical research as well as in practical application of the hydraulic sedimentation engineering.

Extension of Rating Curve for High Water Level using Monte Carlo Simulation (MCS를 이용한 고수위 수위-유량관계곡선의 연장에 관한 연구)

  • Moon, Young-Il;Kim, Jong-Suk;Yoon, Sun-Kwon
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.683-686
    • /
    • 2008
  • Flood damage has been increased due to the abnormal climate and extreme rainfall. So, quantitative and qualitative hydrologic data should be improved in oder to enhance accuracy of hydrologic forecast. However, research regarding hydrologic data have not been thorough enough. Therefore, in this study, monte carlo simulation was applied to rainfall runoff model to improve the reliability of runoff analysis and risk analysis. Rainfall-Stage-Discharge curve was developed as a consequence of MCS and it is possible to get correct rating curve for high water level.

  • PDF

Application of Load Duration Curve and Estimation of Delivery Ratio by Flow Durations Using Discharge-Load Rating Curve at Jiseok Stream Watershed (유량-부하량관계식을 이용한 지석천 유역의 부하지속곡선 적용 및 유황별 유달율 산정)

  • Park, Jinhwan;Kim, Kapsoon;Hwang, Kyungsup;Lee, Yongwoon;Lim, Byungjin
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.4
    • /
    • pp.523-530
    • /
    • 2013
  • This study has been carried out to clarify the characteristics of discharge and pollutant loading according to flow conditions at jiseok stream watershed (JSW). A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. By using the methods above, I've evaluated the water quality (WQ) of the JSW if it is satisfied with the standard target. I've collected the data of BOD and T-P from the JSW every 8 days for the duration of 12 months. And then, I've schematized the data upon the load duration curve and the results showed me that the WQ of JSW was satisfied with the standard target. I've also collected the same data every each day for the duration of 12 months from JSW and have schematized the data again. And the results showed that it also was satisfied with the standard target. To be concluded, I've determined that point pollution sources of JSW gives more significant impacts to the WQ than non-point pollution sources of JSW and hence, as time goes, point pollution sources will keep depriciating the WQ of JSW. Therefore, further efforts will be required to JSW to maintain the WQ.

Indirect discharge estimation using K-River and Monte Carlo simulation at the Confluence of the Seomjin River and Yocheon (K-River와 Monte Carlo Simulation을 이용한 섬진강 요천 합류부의 간접유량 산정)

  • Kang, Han Sol;Kim, Yeon Su;Noh, Joon Woo;Byeon, Ji-Seon;An, Hyun Uk
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.113-113
    • /
    • 2022
  • 기후 변화에 따른 집중호우의 증가로 유례없는 홍수가 발생하기도 한다. 홍수 대비를 위한 수리구조물 설계 및 홍수 예측을 위해서는 기초자료인 유량 자료가 중요하며, 이는 Rating-curve를이용하여 산정하는 것이 일반적이다. 하지만, 이를 기왕의 데이터가 부족한 지역과 적용수위 이상에 대해 적용하는 것에 한계가 있다. 2020년 8월 섬진강에 발생한 홍수는 홍수량의 추정이 어려울 뿐 아니라 기존의 Rating curve를 활용하여 홍수량을 추정하는데 한계가 있다. 섬진강 하천정비기본계획(2021)에 따르면 섬진강 남원(신덕리) 관측소는 100년 빈도 홍수량이 7,470m3/s인 반면, 선형 보간을 통한 Rating curve 외삽 결과 약 23,000m3/s로 많은 차이 나는 것을 확인할 수 있다. 따라서, 본 연구에서는 외삽의 불확실성과 직접 측량에 어려움이 있는 홍수기 유량 추정을 위해 수리학적 해석 방법을 이용한 간접유량 산정기법을 제시하였다. 수치해석모형을 이용하여 홍수사상을 재현하고, 이를 역으로 이용하여 관측 수위와 근접한 계산 결과를 보인 입력 자료로부터 대상 지역의 유량을 간접적으로 산정하였다. 상류단 유량자료의 생성을 위하여 Rating curve의 변수에 대하여 무작위 조합을 생성하였고, K-River(1차원 수리해석 모형)를 이용하여 MCS(Monte Carlo Simulation)를 수행하였다. 계산된 수위와 관측 수위간 수위 재현성 평가(NSE, RSR)를 통해 최적 결과를 나타낸 Rating Curve의 변수들로부터 경계조건의 Rating Curve를 산정하였다. 방법론의 검증을 위해 요천 합류부에 적용하였으며, 그 결과 기존 곡선식의 외삽에 따른 유량 자료의 수위 재현성과 비교하여 개선된 것을 확인하였다. 이를 활용하여 수자원 유량 자료의 신뢰도 개선에 활용이 가능할 것으로 판단된다.

  • PDF

Flood stage analysis considering the uncertainty of roughness coefficients and discharge for Cheongmicheon watershed (조도계수와 유량의 불확실성을 고려한 청미천 유역의 홍수위 해석)

  • Shin, Sat-Byeol;Park, Jihoon;Song, Jung-Hun;Kang, Moon Seong
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.10
    • /
    • pp.661-671
    • /
    • 2017
  • The objective of this study was to analyze the flood stage considering the uncertainty caused by the river roughness coefficients and discharge. The methodology of this study involved the GLUE (Generalized Likelihood Uncertainty Estimation) to quantify the uncertainty bounds applying three different storm events. The uncertainty range of the roughness was 0.025~0.040. In case of discharge, the uncertainty stemmed from parameters in stage-discharge rating curve, if h represents stage for discharge Q, which can be written as $Q=A(h-B)^C$. Parameters in rating curve (A, B and C) were estimated by non-linear regression model and assumed by t distribution. The range of parameters in rating curve was 5.138~18.442 for A, -0.524~0.104 for B and 2.427~2.924 for C. By sampling 10,000 parameter sets, Monte Carlo simulations were performed. The simulated stage value was represented by 95% confidence interval. In storm event 1~3, the average bound was 0.39 m, 0.83 m and 0.96 m, respectively. The peak bound was 0.52 m, 1.36 m and 1.75 m, respectively. The recurrence year of each storm event applying the frequency analysis was 1-year, 10-year and 25-year, respectively.