• Title/Summary/Keyword: direct tunnel

Search Result 195, Processing Time 0.023 seconds

Effect of Covering Methods with Ventilating Non-Woven Fabric on the Growth and Yield in Leaf Lettuce during Low Temperature Season (통기성 간이 피복재의 피복방법이 저온기에 잎상추의 생육, 수량 및 품질에 미치는 영향)

  • 안종길;최영환
    • Journal of Bio-Environment Control
    • /
    • v.11 no.2
    • /
    • pp.88-92
    • /
    • 2002
  • The study was conducted to estimate stimulation of plant growth of blue and red leaf lettuce (Lactuca sativa L.) as affected by covering methods with vinyl materials containing concentrated PO film. Plants were grown in direct, direct and tunnel, and tunnel covering with 'Pasraido materials' from October 13 to 31. With the covering mean air temperature, soil temperature, leaf temperature and relative humidity remarkedly increased. Higher temperature was observed in the order of direct and tunnel, direct, tunnel covering and the control. Photosynthetic photon flux (PPF, $\mu$mol m$^{-2}$ . s$^{-1}$ ) was observed in reverse order of temperature. Concentration of $CO_2$ was higher during night than during day under the light. Accumulation of highest $CO_2$ at night was obtained from direct coverings followed by direct and tunnel, tunnel covering and the control. Plant height, leaf number and leaf area of blue and red lettuces were stimulated by direct covering. However, there was no significant difference.

Orientation Dependent Directed Etching of Aluminum

  • Lee, Dong Nyung;Seo, Jong Hyun
    • Corrosion Science and Technology
    • /
    • v.8 no.3
    • /
    • pp.93-102
    • /
    • 2009
  • The direct-current electroetching of high purity aluminum in hot aqueous-chloride solution produces a high density of micrometer-wide tunnels whose walls are made up of the {100} planes and penetrate aluminum in the <100> directions at rates of micrometer per second. In the process of the alternating-current pitting of aluminum, cathodic polarization plays an important role in the nucleation and growth of the pits during the subsequent polarization. The direct-current tunnel etching and alternating-current etching of aluminum are basically related to the formation of poorly crystallized or amorphous passive films. If the passive film forms on the wall, a natural misfit exists between the film and the aluminum substrate, which in turn gives rise to stress in both the film and the substrate. Even though the amorphous films do not have directed properties, their stresses are influenced by the substrate orientation. The films on elastically soft substrate are likely to be less stressed and more stable than those on elastically hard substrate. The hardest and softest planes of aluminum are the {111} and {100} planes, respectively. Therefore, the films on the {111} substrates are most likely to be attacked, and those on the {100} substrates are least likely to be attacked. For the tunnel etching, it follows that the tunnel walls tend to consist of the {100} planes. Meanwhile, the tunnel tip, where active corrosion takes place, tend to be made of four closely packed {111} planes in order to minimize the surface energy, which gives rise to the <100> tunnel etching.

On-Demand Tunnel Creation Mechanism in Star VPN Topology (성형 VPN 구조에서의 주문형 터널 생성 메커니즘)

  • Byun, Hae-Sun;Lee, Mee-Jeong
    • Journal of KIISE:Information Networking
    • /
    • v.32 no.4
    • /
    • pp.452-461
    • /
    • 2005
  • In the star VPN (Virtual Private Network) topology, the traffic between the communicating two CPE(Customer Premise Equipment) VPN GW(Gateway)s nay be inefficiently transferred. Also, the Center VPN GW nav erperience the overload due to excessive packet processing overhead. As a solution to this problem, a direct tunnel can be established between the communicating two CPE VPN GWs using the IKE (Internet Key Exchange) mechanism of IPSec(IP Security). In this case, however, the tunnel establishment and management nay be complicated. In this paper, we propose a mechanism called' SVOT (Star VPN On-demand Tunnel)', which automatically establishes a direct tunnel between the communicating CPE VPN GWs based on demand. In the SVOT scheme, CPE VPN GWs determine whether it will establish a direct tunnel or not depending on the traffic information monitored. CPE VPN GW requests the information that is necessary to establishes a direct tunnel to the Center VPN GW Through a simulation, we investigate the performance of the scheme performs better than the SYST scheme with respect to scalability, traffic efficiency and overhead of Center VPN GW, while it shows similar performance to the FVST with respect to end-to-end delay and throughput.

Verification of Direct Back Analysis Software Using FLAC as a Subroutine (FLAC을 이용한 직접법 역해석 소프트웨어의 개발과 검증)

  • Kim Chee-Hwan
    • Tunnel and Underground Space
    • /
    • v.15 no.5 s.58
    • /
    • pp.344-351
    • /
    • 2005
  • Direct back analysis software is coded based on Simplex method using FLAC as a subroutine. For the verification of the software, 12 different cases are assumed combining various displacements in different measuring locations around a tunnel. The number of displacements for cases varies from 3 to 240. It is verified that the exact elasticity and the primary stress state of rock around a tunnel could be found through iterative calculation regardless of the locations and number of displacements and initial values needed for the direct back analysis.

Surgical Treatment of Anomalous Connection of Left Coronary Artery to the Pulmonary Artery [ALCAPA] (주관상동맥-폐동맥 이상연결증의 외과적 수술요법)

  • 이정렬
    • Journal of Chest Surgery
    • /
    • v.26 no.3
    • /
    • pp.228-233
    • /
    • 1993
  • Patients with anomalous connection of the left coronary artery to the pulmonary artery are at risk for myocardial infarction, and early or sudden death. Between 1986 to 1992, a total of 4 of these patients underwent surgical intervention with various operative techniques at our institution. Age at operation ranged from 2 months to 43 years. Three infant patients had congestive heart failure, 2 of them had mitral regurgitaion, and 1 had ST-T change on elctrocardiogram. Operative techniques included direct coronary artery transfer to the aorta[n=2], intrapulmonary tunnel from the aortopulmonary window[n=1], coronary artery bypass using saphenous vein[n=1]. One deaths occured at 2 weeks after direct coronary arterial transfer due to respiratory failure caused by Respiratory Syncitial virus pneumonia. Supravalvar pulmoanry stenosis occured after intrapulmoanry tunnel. We recommend direct aortic implatation of the anomalous coronary artery at the time of diagnosis. Intrapulmonary tunnel from aortopulmonary window or subclavian-coronary anastomosis could be alternatives in whom aortic implantation is not feasible anatomically.

  • PDF

Development of a Back Analysis Program for Rock Tunnel using FLAC (FLAC을 이용한 터널 역해석 프로그램의 개발)

  • 양형식;전양수
    • Tunnel and Underground Space
    • /
    • v.12 no.1
    • /
    • pp.37-42
    • /
    • 2002
  • A back analysis algorithm was developed to determine the major parameters for tunnel design; the elastic modulus(E) and the ratio of horizontal to vertical stress(K). The algorithm is based on direct search method and was coded by FISH language of FLAC, a commercial finite difference program. Developed code was applied on some models to verify the validity and estimate the efficiency of the algorithm. Verification by theoretical solutions and published results of Gens' research, was successful.

Numerical simulation of the effect of confining pressure and tunnel depth on the vertical settlement using particle flow code (with direct tensile strength calibration in PFC Modeling)

  • Haeri, Hadi;Sarfarazi, Vahab;Marji, Mohammad Fatehi
    • Smart Structures and Systems
    • /
    • v.25 no.4
    • /
    • pp.433-446
    • /
    • 2020
  • In this paper the effect of confining pressure and tunnel depth on the ground vertical settlement has been investigated using particle flow code (PFC2D). For this perpuse firstly calibration of PFC2D was performed using both of tensile test and triaxial test. Then a model with dimention of 100 m × 100 m was built. A circular tunnel with diameter of 20 m was drillled in the middle of the model. Also, a rectangular tunnel with wide of 10 m and length of 20 m was drilled in the model. The center of tunnel was situated 15 m, 20 m, 25 m, 30 m, 35 m, 40 m, 45 m, 50 m, 55 m and 60 m below the ground surface. these models are under confining pressure of 0.001 GPa, 0.005 GPa, 0.01 GPa, 0.03 GPa, 0.05 GPa and 0.07 GPa. The results show that the volume of colapce zone is constant by increasing the distance between ground surface and tunnel position. Also, the volume of colapce zone was increased by decreasing of confining pressure. The maximum of settlement occurs at the top of the tunnel roof. The maximum of settlement occurs when center of tunnel was situated 15 m below the ground surface. The settlement decreases by increasing the distance between tunnel center line and measuring circles in the ground surface. The minimum of settlement occurs when center of circular tunnel was situated 60 m below the surface ground. Its to be note that the settlement increase by decreasing the confining pressure.

Effect of Covering Method of Ventilating Non-Woven Fabric and $\textrm{GA}_3$ Treatment on the Growth and Yield of Leaf Lettuce during Low Temperature Season (통기성 부직포의 피복방법 및 $\textrm{GA}_3$ 처리가 저온기에 잎상추의 생육 및 수량에 미치는 영향)

  • 최영환;손병구;강점순;안종길
    • Journal of Bio-Environment Control
    • /
    • v.12 no.2
    • /
    • pp.72-76
    • /
    • 2003
  • This study was conducted to estimate stimulation of plant growth of green and red leafy lettuces (Lactuca sutiva L. cv. Chungchima and Jugchima) at affected by covering method and time with protected film materials containing concentrated PO film and GA$_3$ foliar spray. Plants were covered with ‘Pasraido’ material from October 26 to November 31 (direct 1), from November 5 to November 31 (direct 2), or with a tunnel, or direct 2+ tunnel. Mean air temperature and relative humidity under the covering were higher in direct and tunnel, direct and non-covering, in that order. The fresh weight and dry weight of red and green lettuces increased in direct and tunnel followed by direct 1, direct 2, tunnel and the control. GA$_3$ treatment promoted the growth in all covering methods, but decreased the chlorophyll contents. Fresh weight and dry weight were higher in red lettuce than in green lettuce in the control.

Model Test of Lining for Estimation of Tunnel Soundness (터널 건전도 평가를 위한 라이닝 모델실험)

  • Kim, Young Keun
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.2
    • /
    • pp.59-71
    • /
    • 1999
  • Recently, many deformations in tunnel such as crack and leakage were occulted. Specially, the defects of tunnel lining have been a serious problem in safety and stability many repair works for maintenance in tunnel have been carried out. Therefore, it is necessary to estimate the structural cracking for countermeasure in deformed tunnel and to investigate on the characteristics of lining system and the soundness of tunnel. In this study model tests for tunnel lining were carried out using test apparatus and centrifuge, In the direct loading test, the prototype was Kyungbu high-speed railway tunnel and the scale is 1/10, and lining models were made of concrete. Test conditions included load conditions such as direction, shape and type, lining conditions such as single and double lining, thickness, and reinforcement. In centrifuge model test, the prototype was Seoul subway tunnel and the scale is 1/100, and lining models were made of aluminum and hydrostone. Test conditions included tunnel defects such as thickness shortage. behind cavity and longitudinal cracks, reinforcement methods such as epoxy, grouting and carbon sheet. From these model tests , the characteristics of deformation and failure for tunnel lining were estimated, and the structural behaviors of deformed lining and the effects of repair and reinforcement for tunnel lining were researched.

  • PDF

Economic Feasibility Analysis of a Tunnel Section Enlargement Method That Does Not Halt Traffic Flow (교통류 보존형 터널단면 확대 시공기술의 경제적 타당성 분석)

  • Lee, Seung Soo;Kim, Dong-Gyou;Seo, Jong Won
    • The Journal of Engineering Geology
    • /
    • v.25 no.4
    • /
    • pp.459-472
    • /
    • 2015
  • A recently developed tunnel section enlargement method can maintain traffic flow during construction by using a protector. By keeping traffic flowing, it can minimize the lost time and costs associated with diversions and also the accompanying environmental pollution. On the other hand, installing the protector can lengthen the construction period and increase the direct cost. This paper presents a method for analyzing the economic feasibility of tunnel section enlargement methods considering the direct construction cost and the indirect social cost. The indirect costs are divided into categories of: vehicle driving cost, travel time delay cost, and environmental pollution cost. The economic efficiency of existing technology is compared with the new method in an case study of Namsan Tunnel 3.