• Title/Summary/Keyword: development standard model

Search Result 1,382, Processing Time 0.03 seconds

A Study on the Reasonable Standard of Location;allocation for a new administrative center in provincial area (광역지방행정중심지(廣域地方行政中心地)의 선정(選定)을 위한 합리적(合理的) 입지기준(立地基準)에 관(關)한 연구(硏究))

  • Yoon, Jun-Sang
    • Journal of Agricultural Extension & Community Development
    • /
    • v.5 no.1
    • /
    • pp.93-102
    • /
    • 1998
  • The objectives of the study were 1) to make the reasonable standard, 2) to select the objective and scientific method and process for the location-allocation of a new provincial capital city. The Main standard of location-allocation were suggested as follows ; 1) Integration of province 2) Convenience of Administration service 3) Accomodations of new provincial capital city 4) Balanced development by region. The validity of location-allocation were reviewed the population potentials and nodal accessibilities. The population potential was examined to find the maximum point of administrative demand, and the locationallocation model was examined to find the minimum point of the aggregated travel-cost to a proposed provincial government office. The nodal accessibilities measured in travel-time distance and actual values. Two major concerns in locating public facilities are efficiency and equity.

  • PDF

A Study on Estimating Function Point Count of Domestic Software Development Projects (국내 소프트웨어 개발사업에 적합한 기능점수규모 예측방법에 관한 연구)

  • 박찬규;신수정;이현옥
    • Korean Management Science Review
    • /
    • v.20 no.2
    • /
    • pp.179-196
    • /
    • 2003
  • Function point model is the international standard method to measure the software size which is one of the most important factors to determine the software development cost. Function point model can successfully be applied only when the detailed specification of users' requirements is available. In the domestic public sector, however, the budgeting for software projects is carried out before the requirements of softwares ere specified in detail. Therefore, an efficient function point estimation method is required to apply function point model at the early stage of software development projects. The purpose of this paper is to compare various function point estimation methods and analyse their accuracies in domestic software projects. We consider four methods : NESMA model, ISBSG model, the simplified function point model and the backfiring method. The methods are applied to about one hundred of domestic projects, and their estimation errors are compared. The results can used as a criterion to select an adequate estimation model for function point counts.

A Study on the trend and applications of S-100 Standard (S-100 표준 동향 및 적용사례 연구)

  • Oh, Se-Woong;Park, Jong-Min;Suh, Sang-Hyun
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2011.11a
    • /
    • pp.88-90
    • /
    • 2011
  • The IHO(International Hydrographic Organization) has developed the S-100 standard as a universal hydrgraphic data model for consistent use and application of various hydrographic data and sources, and is developing the product specification standards. The organization modified this standard to reflect the requirements of application parts, detailed the insufficient contents for products. In this study, the trend and recent requirement of S-100 standard were analyzed. Also, a method of managing S-100 standard was completed based on the analysis of S-100 application.

  • PDF

Development of Standard Guideline and Process for Safety Design using DMADOV of the Lean 6 Sigma (린 6시그마 DMADOV를 이용한 시스템 안전설계 표준지침 및 프로세스 구축)

  • Kim, Hyung-Kwan;Park, Do-Hyun;Huh, Hyoung-Jo;Sung, Won-Hyuk
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.2
    • /
    • pp.97-106
    • /
    • 2015
  • System is the organization of hardware, software, personnel and facilities needed to perform a designated function within a stated environment with specified results. The trend of modern systems is getting more complex and larger. The system is necessary for modern society but the minor malfunction of the system can result the enormous human and material losses. Recently it is being heightened the concern for system safety and required to be built and applied Safety Engineering standard Guideline for safety of complex and large-sized system. This paper describes the System Engineering Process model integrated with Safety Engineering and the establishment of standard safety guidelines for safety of product development using DMADOV Methodology of the Lean 6 Sigma.

Development of a Prototype S-100 Data Model (프로토타입 해사데이터 모델 개발)

  • Kang, Namseon;Son, Gumjun;Jeong, Yujun;Kim, Hyejin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.24 no.5
    • /
    • pp.527-536
    • /
    • 2018
  • In this paper, we developed a prototype model accident management SMART-Navigation project. In order to develop a prototype model, we analyzed the status of maritime data exchange standard and procedure. We developed accident management prototype application schema, feature catalog and portrayal catalog in accordance with S-100 standard data model development procedure by collecting requirements related services and referring to related standards. In order to verify accident management prototype model, we test data set based on Gwang-yang Port. The prototype model and test data verified verification software, and it was confirmed that the designated symbol was displayed at the correct position through the S-100 simple viewer.

Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method (통계적 기법을 활용한 ILM압출공법 교량 상부공사 개략공사비 산정모델 개발 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.781-790
    • /
    • 2013
  • This research focuses on development of the conceptual cost estimation models for I.L.M box girder bridge. The current conceptual cost estimation for public construction projects is dependent on governmental average unit price references which has been regarded as inaccurate and unreliable by many experts. Therefore, there have been strong demands for developing a better way of conceptual cost estimating methods. This research has proposed three different conceptual cost estimating method for a P.S.C. girder bridge built with the I.L.M method. Model (I) attempts to seek the proper breakdown of standard works that are accountable for more than 95 percentage in total cost and calculates the amount of standard work's materials from the standard section and volume of I.L.M box girder bridge. Model (II) utilizes a correlation analysis (coefficient over 0.6 or more) between breakdown of standard works and input data that would be considered available information in preliminary design phase. Model(III) obtains conceptual estimating through multiple-regression analysis between the breakdown of standard works and all of input data related to them. In order to validate the clustering of coverage in the preliminary design phase, the variation of I.L.M cost coverage from multiple-regression analysis[model(III)] has been investigated which result in between -3.76% and 11.79%, comparing with AACE(Association for the Advancement of Cost Engineering) which informs its variation between -5% and +15% in the design phase. The model proposed from this research are envisioned to be improved to a great distinct if reliable cost date for P.S.C. girder bridges can be continually collected with reasonable accuracies.

Analysis of Safety Decrees for Gas Safety Management System and its Development (주요선진국의 가스기술기준 체제분석 및 제도개선 발전 모형)

  • 김봉진;강경식
    • Journal of the Korea Safety Management & Science
    • /
    • v.3 no.2
    • /
    • pp.51-63
    • /
    • 2001
  • Korea gas industrial because of received LNG in 1987 was converted by the Gas Safety Management System in relation to city gas, LPG and LNG. Gas accident were caused by treatment problem on the supplier and user, on technical and use management mater, on facilities and goods, and included problem with gas safety connection system. This study is present standard application plan of each department to use planning gas technical standard and gas utilization standard of introduction model than statute for change of self-regulation management system and complicated regulation of examination center and order.

  • PDF

Description Capability of a Simple Phenomenological Constitutive Model for High-Strain-Rate Plasticity Data (간단한 현상학적 구성방정식의 고속 유동응력 기술 능력)

  • Shin, Hyun-Ho;Kim, Jong-Bong
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2009.10a
    • /
    • pp.190-193
    • /
    • 2009
  • A recently reported simple phenomenological constitutive model (SK) demonstrated comparable or better data description capability to/than one of the rigorous and physics-based models, the PTW model. The simple SK model is believed to be an efficient model for practical applications where an extensive computation is needed, and can serve as a rigorous comparison standard for the development of a physics-based model.

  • PDF

Research for the Standard Model of the Items of the National Qualification Examination for the Dental Technician (치과기공사국가시험 문항개발기준안연구)

  • Lee, Duck-Hye;Chung, In-Sung;Han, Chang-Sik
    • Journal of Technologic Dentistry
    • /
    • v.23 no.2
    • /
    • pp.75-93
    • /
    • 2002
  • This research was preformed for the purpose of preparing the items of standard model of the national dental technician test base on the duty analysis of the dental technician. The results of the duty analysis for the dental technician follows. 1. The dental technician is a profession to make the oral function smooth through the dental supplement and equipment in a scientific method and the skilled technique. 2. The duty of the dental technician are determined as A. preparation for manufacture B. manufacture C. management of the place of the dental technology D. self-development. A. The field of "the preparation for manufacture" are determined as 1. to confirm work authorization 2. To confirm the working model, B. The field of "In manufacture" are determined as 1. to manufacture the temporary crown 2. to manufacture the inlay and crown & bridge prosthesis 3. to manufacture the porcelain fused metal crown prosthesis 4. to manufacture the all ceramic crown prosthesis 5. to manufacture the temporary denture prosthesis 6. to manufacture the partial denture prosthesis 7. to manufacture the complete denture prosthesis 8. to manufacture the attachment prosthesis 9. to manufacture implant prosthesis 10. to manufacture the removable orthodontic device, 11. to manufacture the fixed orthodontic device, 12. to manufacture the orthodontic study cast C. The field of "in management of the dental lab." are determined as 1. management 2. to control the dental lab. D. The field of "In the self-development" are determined as 1. to improve the professionalism 2. self-control. 3. The developing items selected under the duty evaluation of the dental technician are l7s in the manufacture preparation, 1,011s in the manufacture, 7s in the management for the dental technology, 5s in self-development, and in all together 1,040s

  • PDF

A Standard Business Process of Resource Planning Systems for Footwear Production (신발생산 자원관리 시스템의 표준 비즈니스 프로세스)

  • 류영근;조남호
    • Proceedings of the Korea Society for Industrial Systems Conference
    • /
    • 2002.06a
    • /
    • pp.56-56
    • /
    • 2002
  • The embodiment of working process fitting in characteristics of business each other in ERP system is indispensable factor. But, general ERP system is not so much profitable for the way of production management of footwear of domestic midge and small company that is dependant on most of the way of OEM production. Therefore, the development of ERP system fitted for present situation of the footwear manufacturing companies is necessary. For this, first, the business process for footwear production, for development of this system, have to be standardize and second, the model of Integrated system process based on standard business process have to be design for programming. In this paper, we proposed a method to build up standard business process and execute BPP in the point of the foundation for introduction and development of the resource planning systems only used by production of footwear and suited to the way of production management of the domestic companies manufacturing footwear. With this, we presented a process model of resource planning systems for footwear production. This study is focused on construction of integrated process model for production resource planning of ERP subsystems and the integrated process model consist of 13 modules.

  • PDF