• Title/Summary/Keyword: development projects

Search Result 3,606, Processing Time 0.032 seconds

A Study on the Estimation of Software Development Cost of IT Projects in Public Sector (공공부문 정보화사업의 소프트웨어 개발비용 예측에 관한 연구)

  • 박찬규;구자환;김성희;신수정;송병선
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.191-204
    • /
    • 2002
  • As the portion of information systems (IS) budget to the total government budget becomes greater, the cost estimation of IS development and maintenance projects is recognized as one of the most important problems to be resolved for scientific and efficient management of IS budget. Since IS budget makes much effect on the delivery time, quality and productivity of IS projects, the exact cost estimation is also necessary for the successful accomplishment of IS projects. The primary concern in the cost estimation of IS projects is software cost estimation, which requires the measurement of the size of softwares. There are two methods for sizing software : line-of-code approach, function point model. In this paper, we propose a function-point-based model for estimating software cost. The proposed model is derived by collecting about fifty domestic IT projects in public sector and analyzing their relationship between cost drivers and development effort. Since the proposed model is developed by simplifying the function point model that can be used only when detailed user requirements are specified, it can be also applied at project planning and budgeting phase.

System Safety Application for the Weapon System (무기체계 시스템안전 적용방안)

  • Park, Suncheol;Kim, Jinsung;Jin, Jonghoon;Yoon, Donghwan
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.4
    • /
    • pp.106-112
    • /
    • 2021
  • In the early 1960s, US Air Force lost missile launch bases during ICBM development by a defect in the missile design and operation plan. U.S. DoD realized the limitation of the existing accident prevention method. Therefore, the weapon development required system safety activity, and procurement projects of U.S. DoD applied MIL-STD-882(System Safety). Development projects of U.S. DoD more emphasized the importance of system safety after the space shuttle Challenger exploded in 1986. Currently, Airworthiness certification for military aircraft uses system safety to minimize accidents. The domestic defense aviation R&D projects also use the system safety for the airworthiness certification. However, non-aviation weapon R&D projects rarely applied system safety. This paper presents a system safety application method for domestic weapon R&D projects by studying the U.S. military standards/organizations and domestic defense aviation projects.

Evaluation of Eco-friendliness for Major Development Projects by EA-INDEX in South Korea (EA-INDEX를 활용한 국내 주요 개발사업의 친환경성 평가)

  • Jihyeon Park;Hyun-Jin Choi
    • Journal of Environmental Impact Assessment
    • /
    • v.33 no.3
    • /
    • pp.131-141
    • /
    • 2024
  • The environmental impact assessment have been played important role for sustainable development of the country. Meantime, various studies have been conducted for scientific and effective environmental impact assessment. Howeverthe quantitative data such as regional distribution status and development characteristics according to the type of development project, environmental changes due to development projects, and spatial-temporal changes are insufficient, currently. In this study, we investigated the eco-friendliness of major development projects (industrial complex, urban development, tourist complexes, and waste disposal equipments) by integrating the EA-INDEX of each development projects which were reported by prior researches. As a result, we found that the eco-friendliness of development projects tended to gradually increase overtime due to the increase in eco-friendliness in the protection of living environment sector. The protection of living environment sector was a major factor in the the eco-friendliness of industrial complexes and urban development projects. In the case ofroad construction, landfill and tourist complex development projects, the natural environment conservation sector was a major factor in the eco-friendliness of the project. As a result of analyzing the eco-friendliness of development projects by local government, the eco-friendliness of development projects promoted and implemented in Ulsan, Jeonnam, and Gwangju was higher compared to other regions, and it was relatively low in Daejeon, Gyeongnam, and Daegu. This study is considered to be significant in that it conducted a quantitative analysis of the eco-friendliness of development projects carried out over a relatively long period of time throughout South Korea by dividing them by year and local government.

A Study on the Development of Criteria to Assess the Business Performance of the Development Fund for Women and the Organizations it Supports - focusing on the Assessment of the Seoul Metropolitan Government's Development Fund for Women - (여성발전기금의 평가도구 개발 및 지원단체의 사업수행능력 평가에 대한 연구 - 서울특별시 여성발전기금 지원사업 평가를 중심으로 -)

  • Lee, Bong-Wha;Kim, Kyoung-A
    • Journal of the Korean Home Economics Association
    • /
    • v.44 no.3 s.217
    • /
    • pp.127-141
    • /
    • 2006
  • This study aims to create assessment tools for the development fund for women, and to assess the business performance of the organizations using this development fund for women on the basis of such tools. A total of 57 projects by 58 organizations were assessed for a period of eight months. The assessment was carried out by using five tools: 1) examining the weight of the assessment tools, 2) visiting and inspecting project sites, 3) visiting and inspecting the offices of the participating organizations, 4) cooperating with the Seoul Metropolitan Government for municipal administration, and 5) assessing the final project report. Each tool was comprised of three elements: ability of relevant organizations, operational procedure, and projects results. The assessment results are summarized below: 1. According to the examination of the general trends in assessing the organizations that received the Development Fund for Women, it was found that the assessment emphasized performance more than the process involved in the project. Thus, the result suggested that the projects should be carried out more aggressively. 2. Regression analysis was conducted to identify the capability of the organizations in performing the projects with the development fund for women and the capability of the subjects as an independent variable. It was observed that such capabilities were affected by the degree of role sharing and the utilization of internal organizations. It suggested the importance of human resources. 3. To motivate the subjects involved in executing the projects with the use of the Development Fund for Women, the requirements and the satisfaction factors suggested strengthening the scope of financial support and activating the project environment. In conclusion, it is considered that the findings would provide practical ways to improve the system in using the Development Fund for Women, and in setting relevant policies in the future.

On the Improvement of the Preliminary Feasibility Study for the System Development Program (체계개발 연구사업의 사전타당성 조사 개선 방향)

  • Kim, Jae-Gon;Kim, Dong-Guen;Jun, Hong-Bae
    • Journal of Korea Technology Innovation Society
    • /
    • v.18 no.4
    • /
    • pp.641-666
    • /
    • 2015
  • Recently, it becomes more important to carry out the feasibility study on government R&D projects since the amount of R&D funds increases. For this purpose, until so far the general framework on the preliminary feasibility study for government driven research projects has been built and modified, and well applied to several domains. However, there is still the limitation in applying the method of preliminary feasibility study to system development research projects. The system development research projects have many different features compared to general research projects, for example, long-period development, lots of stakeholder involvement, multi-disciplinary works, and so on. Considering these characteristics, it is necessary to improve the method for the preliminary feasibility study. In this vein, this study deals with looking into the improvement points of the preliminary feasibility study in terms of the application of the system development projects.

Efficiency Analysis on Sales Performance of NPD Projects in ICT Industry Using DEA : Focusing on Empirical Instance from 'S' corporation (자료포락분석을 이용한 ICT산업 신제품 개발 프로젝트 매출 성과에 관한 효율성 분석 : 중견기업 S사의 실례를 중심으로)

  • Jang, HeeSeok;Park, SoHyun;Kim, Seung-Chul
    • Journal of Information Technology Services
    • /
    • v.18 no.5
    • /
    • pp.209-224
    • /
    • 2019
  • When evaluating the performance of a NPD(New Product Development) project, it is common to evaluate the project performance according to the achievement of the planned goal in terms of time, quality and cost management, which are usually three main constraints of the project. The evaluation of the financial factors by which sales contributed to the return of the company is more influential. This is why companies need to increase sales and raise profits. Therefore, it is more reasonable to evaluate the sales performance of NPD projects over a certain period of time against the input costs. At this time, we can analyze the causes of inefficient projects and compare them with other projects and find out how to improve the sales performance to help the company increase its competitiveness. In this paper, we analyze the relative efficiency of the sales performance on the input of the projects by using the actual sales in the period of one year after mass production of the NPD projects of 'S' company in ICT industry. Input factors include developer resource and development cost for the NPD reported after the project has been completed, the delay weeks for the schedule targeted at the project planning stage, and the number of quality issues due to development design faults during initial mass-production. The sales figure and the contribution margin of the product after one year from the start of mass production are defined as the output factors. In this paper, we analyze the efficiency of the projects by using data envelope analysis (DEA). As a result, we found out the reason of the inefficient project of DMUs according to the differences in the characteristics of the efficient and inefficient B2B markets based on the result of DEA of NPD projects. Thus, the goal of this paper is to identify strategies for improving sales performance of NPD projects in inefficient markets.

Analysis of national R&D projects related to herbal medicine (2002-2022) (한약 관련 국가연구개발사업 분석 및 고찰 (2002-2022))

  • Anna Kim;Seungho Lee;Young-Sik Kim
    • Herbal Formula Science
    • /
    • v.31 no.2
    • /
    • pp.81-98
    • /
    • 2023
  • Objectives : This study aimed to analyze the trends in research and development projects related to herbal medicine and natural products in the field of traditional Korean medicine (TKM) over the past 20 years. Methods : Research projects were identified using "Korean medicine" as the subject heading in the National Science and Technology Information Service. The included projects investigated Korean medicine, natural products, or were related to the TKM industry. Data pre-processing and network analysis were performed using Python and Networkx package, and the network was visualized using the ForceAtlas2 visualization algorithm. Results : 1. Over the study period, 4,020 projects were conducted with a research budget of KRW 835.2 billion. Seven institutions performed over 100 projects each, accounting for 2.4% of all participating institutions, and the top 10 institutions accounted for 58.9% of total projects. 2. Obesity was the most frequently mentioned disease-related keyword. Chronic or age-related diseases such as diabetes, osteoporosis, dementia, parkinson's disease, cancer, inflammation, and asthma were also frequent research topics. Clinical research, safety, and standardization were also frequently mentioned. 3. Centrality analysis found that obesity was the only disease-related keyword identified, alongside TKM-related keywords. Standardization, safety, and clinical trials were identified as central keywords. Conclusions : The study found that research projects in TKM have focused on standardizing and ensuring the safety of herbal medicine, as well as on chronic and age-related diseases. Clinical studies aimed at verifying the effectiveness of herbal medicine were also frequent. These findings can guide future research and development in herbal medicine.

Design and Application of PMO-Based Project Management Systems (PMO 기반 프로젝트 관리 시스템의 설계 및 적용)

  • Jeong, Cheon-Su;Kim, Seung-Ryeol;Kim, Nam-Gyu
    • The Journal of Information Systems
    • /
    • v.20 no.4
    • /
    • pp.119-143
    • /
    • 2011
  • Recently, Information System (IS) development projects such as the next generation IS project of the financial business domain have shown tendency to become large and complex. Accordingly, a large number of enterprises have introduced a Project Management Office (PMO) to successfully manage multiple complex large-scaled projects. Many researches and empirical studies have proved the positive results of PMO-based projects. For example, most PMO-based projects have been accomplished successfully without exceeding the planned deadline and budget. However, even in the case of PMO-based projects, participants are still supported by legacy Project Management Systems (PMS) developed without considering the PMO. It implies that recent large projects are hardly performed efficiently because of the large gap between the legacy PMS tools developed only for single small projects and the real process of PMO-based project management. Therefore, we attempt to design and develop a PMO-based PMS in which the role and responsibility of PMO are completely implemented. To demonstrate our systems practicality, we applied the devised system to the real project management cases of "K" bank in The Republic of Korea. According to the results of case analysis, all of the four projects supported by our PMO-based PMS have been completed without exceeding planned deadline and budget, and the quality of their final outcome is appraised to be superior.

A Study of the Risk Analysis Technique Optimization in the Pre-Project Evaluation Phase of the Development Projects (개발사업 사전평가단계에 적용하는 위험분석기법 최적화 연구)

  • Kim, Han;Kim, Seon-Gyoo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.517-520
    • /
    • 2008
  • The city refreshing development projects in the domestic recently have been performed under leading of public institution laying stress on new city and existing urban district. These development projects are still staying in safety control level despite risk factor management at preliminary estimation stage has been more important factor to success and add value creation. Understanding inaccurately about various risk analysis techniques that can analyze risk factors and the insufficient application of step that can analysis technique s could make projects more difficult. Therefore, this research suggests the more effective methods for risk analysis that can control the risks in the pre-project evaluation stage.

  • PDF

The Characteristic of Wind Turbine Industry of the West-South Seashore of Leading Industry Development for Honam Economic Region (호남광역경제권의 서남해안 풍력산업 특성)

  • Cha, In-Su;Kim, Tae-Hyung;Lee, Ki-Bong
    • Proceedings of the KIPE Conference
    • /
    • 2010.07a
    • /
    • pp.101-102
    • /
    • 2010
  • This paper represents about the characteristics of wind turbine industry of the west-south seashore of Leading Industry Development for Honam Economic Region. These projects have 8 R&D and 3 non R&D project. The period of these projects is from October 2009 to April 2012. The R&D projects are composed three bright prospect products (1) the base construction of MW off-shore wind turbine components and system with Outer-rotor type PMSG, (2) the Development of 3MW wind power system with accommodation of the west-south seashore, and (3) the development of hybrid wind turbine system with wind base construction. Also, the non-R&D projects are composed three parts with above three bright prospect products. Above two projects support the companies with characteristic of low speed wind turbine system. Other project supports the companies related to wind turbine with small and medium capacity of form 3 kW to 10kW.

  • PDF