VE Adaptability and Activation plan in Design Phase of BTL Projects (민간투자(BTL)사업의 설계VE 적용 및 활성화 방안 연구)

  • Shin, Jeong-Hoon;Sim, Un-Jun;Lee, Taick-Oun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.4
    • /
    • pp.93-99
    • /
    • 2007
  • Highly advanced technologies are being adopted into the domestic construction industry in accordance with rapidly changing global construction industry in the 21st century. Value Engineering methodologies have often been discussed but not yet settled in the country. This research, therefore, aims to provide a useful guide to utilizing design Value Engineering in Build Transfer Lease. 1. Questionnaires had been conducted, answered by those in the field. 2. Questionnaires were in regard to the obstacles in the application of design Value Engineering and activation schemes. 3. Five standards were provided to be chosen according to the degree of influence from each factor, whose answers were technically analyzed by a statistical program afterward. 4. Four obstacles classified in this method were approached systematically to analyze the problems. 5. Efficient Activation schemes have been suggested after various analyses in a variety of aspects.

A Study on the Design Development and Construction Process in British Airways London Eye (런던아이의 디자인 전개와 건립과정에 관한 연구)

  • Woo, Dae-Seung
    • Journal of architectural history
    • /
    • v.15 no.1 s.45
    • /
    • pp.7-27
    • /
    • 2006
  • This study aims to identify and analyze the factors that influenced the construction of London Eye which was led by private groups, including characteristics in progress, differentiated value in design, the combination of technology and design, and construction costs. The results of this study were the followings. 1) London Eye provides a new construction method for a landmark in the downtown in that the architects became the clients of the project which might have been hoarded, procuring the construction costs and completing it by themselves. 2) London Eye presents a space utilization method where undeveloped spaces in the downtown are used in three-dimensions by erecting a structure on the river with a minimum land. 3) The process of design, production and erection is propelled the realization of technical intention design with one system and from at the initial stage, the participation of the engineer where the designer is equal with you must accompany. 4) London Eye is endowed with strong shape by a circle in design concept, which is the simplest geometrical figure, and it provides organic relationship between the past and the present by utilizing historical elements in various ways. 5) The construction was completed through four phases including idea phase, promotion phase, turn-key contract phase, and design-build phase. The most critical factor to the success is derived from the direct contact with Involved companies from the production phase. 6) In a project facing many challenges in terms of technology, the design-build method proves to be a more effective method than turn-key contract in that it may more allocate risks and enable coherent implementation of the core concept in design. The organization for the design-build method was composed of three phases including general affairs, responsible contracting by sector, and cooperative system by sector. Since that was a new concept structure, high-level contractors who hadn't had existing cooperative relationships with one another formed new cooperative relationship, while collaborating companies who had long cooperated led the responsible contracting and sub-cooperative system, which resulted in reduction of risks and time. 7) The major factors to change design were the design characteristics, derived from a technically great combination, and the opening time. 8) A new erection method was applied to London Eye, a structure that overcame the limitation in land and period, and the process of installation demonstrated that it is an important value for the construction of a landmark in the city. 9) In spite of many visitors and tremendous operational income, the factors that London Eye fails to free itself from debts include the construction costs expended double than expected, and interest burden to the investments, which occurred in the course of procuring the costs. Absolute limit in time increased the construction costs, resulting in being a great obstacle in the course of operation.

  • PDF

A Study on Guidelines for School Space Innovation Project - focused on the Manual for Project of Future Classroom in Incheon Metropolitan City Office of Education - (학교공간혁신사업 운영 가이드라인에 관한 연구 - 인천광역시교육청 미래교실사업 매뉴얼 중심으로 -)

  • Park, Yeol;Choi, Jin-Hee;Oh, Seung-Ju
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.27 no.4
    • /
    • pp.11-16
    • /
    • 2020
  • Today, the paradigm of education is changing from teacher-centered, facility-centered, supplier-centered to student-centered, people-centered, and user-centered. In 2019, the Ministry of Education promoted the school space innovation project to provide a school space as a balanced life space, such as learning, play, and rest, through educational activities led by students, who are the leaders of the future society. Based on this, Incheon Metropolitan City Office of Education prepared a manual for practice while carrying out a project to build a future classroom. In those projects 'user participatory design' is applied as a new design approach and facilitators play an important role as experts in the process of user participatory design. However, it is different from the guidelines by the Ministry of Education in terms of facilitator role; facilitator in Incheon's future classroom projects can be in charge of designer part. This was possible because the design scope was limited to the classroom space and the construction permit work was not applied, and the Incheon Metropolitan City Office of Education seems to be able to successfully implement the plan derived through 'user participatory design' under the responsibility of the facilitator. However, this may be considered to be inconsistent with the basic purpose of the school space innovation project. In the case of the school unit project, it is considered that more systematic supplementation is necessary.

A Plan for an Interior Design of the "N" Company Relocation Project ("N" 회사 재배치 프로젝트의 인테리어 디자인 계획안)

  • Ryu, Hye-Ji;Park, Hyun-Ok
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2007.05a
    • /
    • pp.79-80
    • /
    • 2007
  • Office interior design is based on the understanding of diversity information about working program, organization and networking system of the company. To build a good working environment, flexibility of space and communication between employees and employer in the office are very important. Due to the business growth, the "N" company requires more working space and this project is basically initiated to relocate in new working environment. This work pursues the clients can enhance more creativity and productivity in their working area. In order to promote the efficiency and comfort of the working environment, diverse employee's working characteristic, individual and collective requirements have been observed. The basic concept of the design can be summarized in the following : youth, simplicity, modern and nature.

  • PDF

A Plan for an Interior Design of the "K" Financial Company ("K" 금융회사 인테리어 디자인 계획안)

  • Ryu, Hye-Ji;Park, Hyun-Ok
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2007.11a
    • /
    • pp.206-209
    • /
    • 2007
  • Today rapid change in information and economy takes the changing of office design. It is very important to understand about the needs of employees and working environment. To promote the efficiency and comfort of the working environment, diverse employee's working characteristic and individual requirements have been observed. To build a good working environment, flexibility of space and communication between employees and employer in the office are very important. Due to the business growth, "K" financial company requires more working space. The design idea for the main areas such as the executive officer's room, the reception, the elevator hall, the conference rooms and the working areas in this project targets the harmony of the functionality and the aesthetic. This project could be able to deliver more convenient and comfortable working place by adopting three main concepts, which are modern, simplicity and moderation.

  • PDF

ROLES AND RELATIONSHIPS BETWEEN ARCHITECTS AND CONTRACTORS BASED ON CONTRACTOR-DESIGNER ISSUE IN JAPAN

  • Sayaka Nishino;Shin Takamatsu;Shuzo Furusaka
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.758-763
    • /
    • 2009
  • In Japan, it has been argued between architects and contractors that which process is desirable, the traditional process or the design-build process. It is called the contractor-designer issue. In 1968, Kajima Corporation chairman Morinosuke Kajima and the Japan Architects Association had a public controversy over it. On the other hand, in practice, architects and contractors have secured quality of buildings thorough a close communication in the design and construction process of building. What are the relationships between architects and contractors? What roles do architects and contractors have in practice? This study has two aims. First one is to analyze the contractor-designer issue based on roles and relationships between architects and contractors, and then to show conflicts between them. Second one is to consider issues which architects face in the relationships with contractors.

  • PDF

A Framework for Guaranteed Maximum Price and Contingency Development for Integrated Delivery of Transportation Projects

  • Gransberg, Douglas D.;Shane, Jennifer S.;Ahn, Jun-Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.1
    • /
    • pp.1-10
    • /
    • 2011
  • This paper discusses the components of a guaranteed maximum price (GMP) and proposes a framework for the development of GMPs as contract payment provisions for construction manager-at-risk (CMR) and design-build (DB) contracts for transportation projects. The framework is the synthesis of a comprehensive literature review, a content analysis of CMR and DB solicitation documents and contracts, and case study project output from twelve projects in nine states worth $3.1 billion. The research also discusses the development of three common types of contingencies that are often utilized in projects with GMPs. The study concludes that owners should specify the structure of the GMP and its components to enhance clarity and understanding of the GMP's composition. It recommends that this structure be included in the CMR and DB solicitation documents so that pricing proposals can be formulated in a manner that is consistent with the contract payment provisions that will be useful to practitioners that need to implement GMP-based contracts.

DEFORMED BUILDING DESIGN AND FABRICATION BASED ON THE PARAMETRIC TECHNOLOGY

  • Eonyong Kim;Jongjin Park;Hanjong Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1107-1112
    • /
    • 2009
  • To design and build a deformed building, new approaches and technologies are required, in which a design approach with parametric and generative technology is used for design and for building it, computer based fabrication technology. Even if parametric design technology is not a state of the art thing, the technology is still used widely, in order to effect the efficiency and furthermore it will continue to be innovated upon continuously. To cope with the limitation of it, the generative design system is developed. Deformed building design requires new methodology to overcome the limitations of conventional ways, which have difficulties to create enough design alternatives to explore satisfied design solutions order to deformed design have geometrical complexity and dramatically increased amount of data. Hence the generative design system can be a cutting edge methodology to solve it. However we should consider how to build the design in the real world. For this, the computer based fabrication technology which is used in mechanical industry is required to introduce to architecture and construction domain for efficiency. In this research, the methodology is modeled and tested with Bezier surface based shell structure.

  • PDF

Organizational Design for New Product Architecture Development: Comparative Analysis of Sharp and Casio on PDA Development (신규 제품아키텍처 개발을 위한 기업조직의 설계: PDA 개발에 있어 샤프와 카시오의 개발조직 비교 분석)

  • Wi John-H.
    • Journal of Technology Innovation
    • /
    • v.14 no.1
    • /
    • pp.1-30
    • /
    • 2006
  • The purpose of this paper is to analyze the organizational design and management of product development in creating new product architecture by an established firm. For the purpose, the paper put up the organizational design in the process of PDA(Personal Digital Assistant) development of Sharp and Casio which were Japanese major PDA firms in 1990s. PDA is the product born through architectural change from Electronic Organizer. Prior research on the product architecture change and organizational adaptation emphasized that an established firm is difficult to adapt to new product architecture due to the restriction of prior technology or organizational inertia. For overcoming these problems and successful development of new product architecture, organizational design and management in the process of product development becomes essential. In case of Sharp, corporate development project team had been used to overcome the restrictions from architectural knowledge accumulated through previous product. After launching first new PDA by corporate development project team, Sharp created a new division and pushed an evolution of PDA, when new PDA market start to grow up rapidly toward a major market segmentation. As a result, Sharp was able to build up stable PDA project trajectory. However, Casio was late for three years in launching of new PDA architecture because previous division charging of Electronic Organizer tried to develop first new PDA. Casio's PDA development was prohibited by engineers of previous division because new PDA architecture was inferior on user interface and display definition. That is, Casio's first PDA development was restricted by architectural knowledge of previous product.

  • PDF

A Study of Game Project Curriculum for Integrated Subject (통합교과로서의 게임 프로젝트 교육과정 운영방안 탐구)

  • Choi, Seung-Kwan
    • Journal of Korea Game Society
    • /
    • v.16 no.5
    • /
    • pp.111-122
    • /
    • 2016
  • The purpose of this study is to suggest an curriculum model of teaching scheme which performs team project learning based on Integrated project with different fields. To address this goal, the present study suggests a practical game project model under the same game-making circumstances as game industry by consisting of real case of convergence parts(game graphic, game design, game program). This project-based learning case has been conducting Integrated project education since 2008 in A educational Institute in Korea. The results of study suggest a standard of Integrated-based curriculum model and it is constructed with two parts. The first part is what students learned during project processing, such as responsibility, communication. The other part is how to construct the educational environment for integrated project. It explains how to organize and build teams, plan of integrated project, rule the role of team task, perform collaborative task, present interim/final presentation, evaluate grade. This study is expected to be utilized as a framework for the instructional design and the guideline for improving learner competency in team project learning.