DOI QR코드

DOI QR Code

VE Adaptability and Activation plan in Design Phase of BTL Projects

민간투자(BTL)사업의 설계VE 적용 및 활성화 방안 연구

  • Published : 2007.12.20

Abstract

Highly advanced technologies are being adopted into the domestic construction industry in accordance with rapidly changing global construction industry in the 21st century. Value Engineering methodologies have often been discussed but not yet settled in the country. This research, therefore, aims to provide a useful guide to utilizing design Value Engineering in Build Transfer Lease. 1. Questionnaires had been conducted, answered by those in the field. 2. Questionnaires were in regard to the obstacles in the application of design Value Engineering and activation schemes. 3. Five standards were provided to be chosen according to the degree of influence from each factor, whose answers were technically analyzed by a statistical program afterward. 4. Four obstacles classified in this method were approached systematically to analyze the problems. 5. Efficient Activation schemes have been suggested after various analyses in a variety of aspects.

Keywords

References

  1. 건설저널, 기본에 충실한 VE장려 - 지속적 성과향상 담보, 건설저널, 2005
  2. 기획예산처, 민간투자 사업 기본계획 2006
  3. 김수용, 건설프로젝트 설계VE 업무의 중점 관리 요인분석, 부경대학교, 한국건설관리학회논문집, 2006
  4. 김해곤, 공공부문 일괄입찰사업의 설계VE파트너링 활용방안, 서울시립대학교, 한국건설관리학회논문집, 2006
  5. 이상근, 서울시 공공공사의 공사비 절감을 위한 설계VE 체계화 방안연구, 서울도시연구제7권 제2호, 2006
  6. 이승훈, 건설사업 설계초기단계VE 적용방안, 서울시립대학교, 한국건설관리학회논문집, 2005
  7. Alphonse, DellIsola J. Value Engineering : Practical Applications for Design, Construction, Maintenance & Operations, Roberts Means Co., 1997, pxvii
  8. John Kelly and Steven Male, Value Management in Design in Design and Construction : The economic management of projects, E&FN SPON, 1993