• Title/Summary/Keyword: design-build project

Search Result 221, Processing Time 0.028 seconds

A Study on The Construction of Cloud BIM-based Medical Facility Design Support System (클라우드 BIM 기반 의료시설 설계지원 시스템 구축에 관한 연구)

  • Jung, Sung-Ho;Lee, Byung-Soo;Choi, Yoon-Ki
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.6
    • /
    • pp.39-46
    • /
    • 2019
  • In the 21st century, medical facility projects are required to operate appropriate digital technologies as the development of technology and the interests of various participants become more complex. In order for architects to successfully lead negotiations among various stakeholder groups, it is necessary to plan for effective communication through appropriate design reflecting their opinions and coordination of conflicts. For this purpose, building information modeling (BIM), which is a method of designing based on knowledge information related to medical facilities in the building database, can respond to change of order promptly and minimizes the occurrence of design errors can do. Recently, BIM technology and cloud computing technology in ICT have been combined and research on cloud BIM has been actively carried out. The use of cloud computing technology in BIM-based healthcare facility projects can effectively support decision making among project participants and has the advantage of sharing and collaborating on various forms of information generated during the design process, regardless of location and time. Therefore, the purpose of this study is to build of system that can support the design of medical facility using cloud computing technology in BIM.

A Sensitivity Analysis for Risk Management of Private Investment Projects - Focused on BTL Projects - (민자유치사업의 리스크 관리를 위한 민감요인 분석 - BTL 사업을 중심으로 -)

  • Kim, Sun-Kuk;Park, Tong-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.168-175
    • /
    • 2006
  • Since the partly changed 'Private Investment Act for Social Infrastructure Projects' set forth in January 2005, the number of BTL(Build-Transfer-Lease) projects offered to the market has rapidly increased. The scope of BTL projects offered covers not only legally defined facilities but several facilities for the private schools. A BTL project, by definition, is a way of project management that includes the entire process of development such as planning, design, construction and operation over the period of 20-30 years. As a result, various types of risk may happen at each stage of the project and it is extremely important to efficiently control the sensitive factors that affect the risk profiles of the project. The examples of the sensitive factors are construction cost, interest rate, discount rate, lease amount, rental fee, O&M cost and so on. This study examines the characteristics of these sensitivity factors, analyzes their impact on the project feasibility and suggests the alternatives to manage them efficiently.

The Study of Quality Control in Engineering on the Turnkey Project(Focus on Change Orders at the Construction Phase) (턴키공사 설계품질관리에 관한 연구(시공단계의 설계변경을 중심으로))

  • Lee Yong-Jin;Lee Teck-Wn;Kim Jin-Young;Han Choong-Hee;Kim Sun-Kuk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.58-66
    • /
    • 2001
  • Turnkey project, also called Design-Build project, has been expanding and diversifying its business into the Korean market. However, it has been experiencing numerous difficulties due to a large number of change orders on the public turnkey project. Change order during the construction phase impact on time deliveries, budget and quality on a turnkey project. In preparation for this, the government has to improve the awarding procedure and general conditions for turnkey projects. Contractors should also cooperate with their co-working partners and establish a standardized procedure, which provides change order control for efficient implementation on the construction site.

  • PDF

Research to define facility type, project consideration and restriction when conceiving civil-military sharing facilities, by applying the Delphi technique (델파이기법을 활용한 민군간 공용 시설유형 및 고려요소 판단 연구)

  • Gong, Keum Rok;Kang, Han-Seung;Ahn, Jin-Ho;Park, Young Jun
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.34 no.2
    • /
    • pp.57-66
    • /
    • 2018
  • When developing projects to build facilities to be shared by both military bases and surrounding communities, strategies are needed to achieve two objectives: 1) minimize missteps and opposition from local communities in the process of developing and implementing such projects, and 2) promote cost-benefit optimization and user-satisfaction. With aim of promoting co-operation and co-existence between military bases and adjust communities, this research proposes esthetical factors to be considered in conceiving civil-military sharing facilities. It seeks experts' opinions on the development of civil-military sharing facilities, and examines critical factors (economic feasibility, security, and satisfaction, etc.) for project development as well as building types suitable for shared-use between military bases and local residents. It then establishes a method to prioritize facility-type and narrow down design factors (considerations and restrictions) in project development by applying quantitative analysis. The methodological approach of the research employs the Delphi survey method to quantitatively analyze qualitative information drawn from experts' opinions. At the first round of the survey, facility types, items for consideration and restrictions are drawn, and then at the second round of the survey, criticality of each item is analyzed. Finally, it reaches a conclusion on suitability of facility types for civil-military sharing facilities, and selects project considerations and restrictions when developing this kind of project.

Analyzing the effects of artificial intelligence (AI) education program based on design thinking process (디자인씽킹 프로세스 기반의 인공지능(AI) 교육 프로그램 적용 효과분석)

  • Lee, Sunghye
    • The Journal of Korean Association of Computer Education
    • /
    • v.23 no.4
    • /
    • pp.49-59
    • /
    • 2020
  • At the beginning of the discussion of AI education in K-12 education, the study was conducted to develop and apply an AI education program based on Design Thinking and analyze the effects of the AI education programs. In the AI education program, students explored and defined the AI problems they were interested in, gathered the necessary data to build an AI model, and then developed a project using scratch. In order to analyze the effectiveness of the AI education program, the change of learner's perception of the value of AI and the change of AI efficacy were analyzed. The overall perception of the AI project was also analyzed. As a result, AI efficacy was significantly increased through the experience of carrying out the project according to the Design Thinking process. In addition, the efficacy of solving problems with AI was influenced by the level of use of programming languages. The learner's overall perception of the AI project was positive, and the perceptions of each stage of the AI project (AI problem understanding and problem exploration, practice, problem definition, problem solving idea implementation, evaluation and presentation) was also positive. This positive perception was higher among students with high level of programming language use. Based on these results, the implications for AI education were suggested.

A Study on the Current Status of Application of Construction Management in Pusan National University Yangsan Hospital and Guidelines for CM Improvement (양산 부산대학교병원의 건설사업관리 적용현황과 발전 방향)

  • Park, Jong-Soon;Shin, Chang-Joon;Yoo, Byeong-Gi;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.5-12
    • /
    • 2008
  • The construction of Pusan National University Yangsan Hospital is a new construction of a medical town in Yangsan. It is a case that CMr participated in the project from planning to post-completion. It shows an actual proof of Construction Management business applied CM by each phase. In this case, CMr selected the design-build contractor in the planning phase and technically performed CM businesses in every single phase such as design and construction schedule management regarding application of Fast Track technique, procurement management and contract administration in phases based on the Fast-tract; technique, design review, VE in the design phase, change order management in the construction phase and operating and maintenance in the post-construction phase. This study would go far toward applying CM to Mega Turnkey projects by analyzing the problems of CMr's practical application to the project and providing guidelines for effective and efficient CM business implementation especially in the Turnkey projects.

  • PDF

Evaluating New Track Construction Costs of Two Different Options: Conventional Trains vs. Tilting Trains

  • Rho, Hag Lae;Han, Seong Ho;Kim, Gang Seog
    • International Journal of Railway
    • /
    • v.5 no.3
    • /
    • pp.103-113
    • /
    • 2012
  • Infrastructure costs could be greatly reduced if the need for bridges and tunnels was reduced, or if the line could be shortened. Tilting trains might be a less costly alternative to building new tracks with large curve radii, because tilting trains can negotiate tighter curves without having to decrease their speeds. Tracks built for tilting trains would be cheaper, as they require fewer bridges and tunnels. This paper compares the construction costs of two different options for the new Dodam-Yeoncheong section on the Central line, which includes 148.65 km of new electrified double-track with a design speed of 250 km/h. The first option is to straighten the high-speed line. The second option is to build a line with small radii curves and run tilting trains on the line. In the first option, tunnels would account for about 51% of the new section. In comparison, the second option would have shorter curves and fewer tunnels and bridges which would reduce construction costs. Furthermore, alignment modifications could be made to several segments on the straight line, making the most of the existing roadbed. The analysis concluded that the line suited to tilting trains would be 95.7 million USD cheaper to build the straight route. That is a savings of 2.8% of the total project cost. However, this option would increase the total travel time of the route by 1.2 minutes, which means it is not necessarily the best choice.

A Study on a Cost-Based Information Management System for Apartment Finishing Work Items (원가기반의 공동주택 마감재 정보관리 시스템에 관한 연구)

  • Lee, Hoon-Ku;Lee, Yoon-Sun;Kim, Kyung-Sook;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.29-37
    • /
    • 2010
  • In recent years, apartment finishing work items have increasingly become more upscale and diverse, and the kinds have increased in exponential numbers. A huge amount of information about finishing work items is produced and changed in the stages of planning finishing work item design and selecting alternatives in the early days of an apartment project. However, there are many problems raised by the poor information management of finishing work items. Thus this study suggested a cost-based information management system to manage information about finishing work items generated in the initial stage of an apartment project. In order to build the suggested system, the investigator designed an information management system based on the concepts and organization of system. And after setting a scenario of selecting finishing work items by conditions including the initial information values of finishing work items, information management for each alternative, and cost fix or free condition, I implemented and applied a prototype of an information management system for finishing work items among the participants including the project manager, interior designer, and builder.

A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea (국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례)

  • Kim, Gyoung-Hun;Choi, Jun-Dong;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF

A Case Study on M & E Design for Double-Deck Tunnel in Urban Area (도심지 대심도 복층터널의 환기 및 방재계획)

  • Byun, Sang-Hun;Jeong, Jae-Ho;Jun, Duk-Chan;Shin, Il-Jae;Sim, Dong-Hyun
    • Tunnel and Underground Space
    • /
    • v.21 no.4
    • /
    • pp.281-286
    • /
    • 2011
  • The west underground express way is a recent initiated BTO (Build-Transfer-Operate) project for releasing heavy traffic of the existing west express way which is notorious on-ground road for extremely traffic stuck area in the west of Seoul, South Korea. The new express way for light vehicles is the first double-deck tunnel ever designed in South Korea and 10.91 km long including both open cut structures and concrete lining with middle-deck in bored tunnel. Because the new express way is going through underground of heavily populated area, mechanical & electrical design for the safety of drivers in tunnel is one of the most important parts among many design issues. This paper discusses M & E design focuses including ventilation-evacuation plan and various safety facilities.