• Title/Summary/Keyword: design and construction approach

Search Result 784, Processing Time 0.024 seconds

An Approach to the Graph-based Representation and Analysis of Building Circulation using BIM - MRP Graph Structure as an Extension of UCN - (BIM과 그래프를 기반으로 한 건물 동선의 표현과 분석 접근방법 - UCN의 확장형인 MRP 그래프의 제안 -)

  • Kim, Jisoo;Lee, Jin-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.3-11
    • /
    • 2015
  • This paper aims to review and discuss a graph-based approach for the representation and analysis of building circulation using BIM models. To propose this approach, the authors survey diverse researches and developments which are related to building circulation issues such as circulation requirements in Korea Building Act, spatial network analysis, as well as BIM applications. As the basis of this paper, UCN (Universal Circulation Network) is the main reference of the research, and the major goal of this paper is to extend the coverage of UCN with additional features we examined in the survey. In this paper we restructured two major perspectives on top of UCN: 1) finding major factors of graph-based circulation analysis based on UCN and 2) restructuring the UCN approach and others for adjusting to Korean Building Act. As a result of the further studies in this paper, two major additions have demonstrated in the article: 1) the most remote point-based circulation representation, and 2) virtual space-based circulation analysis.

Challenges to Prevent in Practice for Effective Cost and Time Control of Construction Projects

  • Olawale, Yakubu A.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.16-32
    • /
    • 2020
  • Cost and time control of projects is important in preventing project failure. However, achieving effective cost and time control in practice is often challenging. The challenges of project cost and time control in practice are investigated by carrying out a questionnaire survey on the top 150 construction contractors in the UK followed by in-depth semi-structured interviews of practitioners from 15 construction companies in the country. Quantitative analysis reveals that design change is the most important factor inhibiting the ability of UK contractors from effectively controlling both the cost and time of construction projects. Four of the top five factors inhibiting effective cost control are also the top factors inhibiting effective time control albeit in a different order. These top factors-design changes, inaccurate evaluation of project time/duration, risk and uncertainty, non-performance of subcontractors and nominated suppliers were also found to be endogenous factors to the project. Additionally, qualitative analysis of the interviews reveals 16 key challenges to prevent for effective project cost and time control in practice. These are classified into four categorised based on where they stem from as follows; from the organisation (1. Lack of integration of cost and time during project control, 2. lack of management buy-in, 3. complicated project control systems and processes, 4. lack of a project control training regime); from the construction management/project management approach (5. Lapses in integration of interfaces, 6. project control not being implemented from the early stages of a project, 7. inefficient utilisation and control of labour, 8. limited time devoted to planning how a project will be controlled at the outset); from the client; (9. Excessive authorisation gates, 10. use of adversarial and non-collaborative forms of contracts, 11. communication problems within client set-up, 12. obstructive client representatives) and; from the project team (13. Lack of detailed/complete design, 14. lack of trust among the project partners, 15. limited time devoted to project control on site, 16. non-factual reporting). The study posits that knowledge of these project control inhibiting factors and challenges is the first step at ensuring they are avoided and enable the implementation of a more effective project cost and time control process in practice.

Institutional Improvement of Construction-Related Laws for Practical Application of 3D Printing (3D 프린팅 실무 적용을 위한 건설 관련법 제도적 개선 방향)

  • Lee, Sung-Min;Park, Sang-Hoon
    • Journal of Korean Association for Spatial Structures
    • /
    • v.19 no.4
    • /
    • pp.85-94
    • /
    • 2019
  • Then 3D printing is used practically at construction sites, there is a serious lack of studies on the conflict with construction-related laws and expected operational problems. Accordingly, the purpose of this study is to present obstacles and directions for improvement in construction-related laws (Building Act, Construction Technology Promotion Act, Housing Act, Construction Machinery Management Act, etc.) for practical operation of 3D printing. The important results are as follows. Amending existing construction-related laws for 3D printing is irrational and inefficient in terms of structure and material. This study proposed a method of satisfying performance required by laws or standards based on the performance design method presented in existing laws and systems through structure and material performance certification procedure. In addition, inclusion of 3D printing equipment in the Construction Machinery Management Act results in various restrictions such as equipment inspection and certification of machine parts. As such restrictions can block vitalization of 3D printing, a long-term and step-wise approach was suggested.

Mapping Submarine Bathymetry and Geological Structure Using the Lineament Analysis Method

  • Kwon, O-Il;Baek, Yong;Kim, Jinhwan
    • The Journal of Engineering Geology
    • /
    • v.24 no.4
    • /
    • pp.455-461
    • /
    • 2014
  • The Honam-Jeju, Korea-Japan, and Korea-China subsea tunnel construction projects have drawn significant attention since the early 2000s. These subsea tunnels are much deeper than most existing natural shallow sea tunnels linking coastal areas. Thus, the need for developing new technologies for the site selection and construction of deep subsea tunnels has recently emerged, with the launch of a research project titled "Development of Key Subsea Tunnelling Technology" in 2013. A component of this research, an analysis of deep subsea geological structure, is currently underway. A ground investigation, such as a borehole or geophysical investigation, is generally carried out for tunnel design. However, when investigating a potential site for a deep subsea tunnel, borehole drilling requires equipment at the scale of offshore oil drilling. The huge cost of such an undertaking has raised the urgent need for methods to indirectly assess the local geological structure as much as possible to limit the need for repeated borehole investigations. This study introduces an indirect approach for assessing the geological structure of the seafloor through a submarine bathymetry analysis. The ultimate goal here is to develop an automated approach to the analysis of submarine geological structures, which may prove useful in the selection of future deep subsea tunnel sites.

Minimum Expected Cost based Design of Vertical Drain Systems (최소기대비용에 의한 연직배수시설의 설계)

  • Kim, Seong-Pil;Son, Young-Hwan;Chang, Pyung-Wook
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.49 no.6
    • /
    • pp.93-101
    • /
    • 2007
  • In general, geotechnical properties have many uncertain aspects, thus probabilistic analysis have been used to consider these aspects. It is, however, quite difficult to select an appropriate target probability for a certain structure or construction process. In this study, minimum expected cost design method based on probabilistic analysis is suggested for design of vertical drains generally used to accelerate consolidation in soft clayey soils. A sensitivity analysis is performed to select the most important uncertain parameters for the design of vertical drains. Monte Carlo simulation is used in sensitivity analysis and probabilistic analysis. Total expected cost, defined as the sum of initial cost and expected additive cost, varies widely with variation of input parameters used in design of vertical drain systems. And probability of failure to get the minimum total expected cost varies under the different design conditions. A minimum value of total expected cost is suggested as a design value in this study. The proposed design concept is applicable to unit construction process because this approach is to consider the uncertainties using probabilistic analysis and uncertainties of geotechnical properties.

Influence line- model correction approach for the assessment of engineering structures using novel monitoring techniques

  • Strauss, Alfred;Wendner, Roman;Frangopol, Dan M.;Bergmeister, Konrad
    • Smart Structures and Systems
    • /
    • v.9 no.1
    • /
    • pp.1-20
    • /
    • 2012
  • In bridge engineering, maintenance strategies and thus budgetary demands are highly influenced by construction type and quality of design. Nowadays bridge owners and planners tend to include life-cycle cost analyses in their decision processes regarding the overall design trying to optimize structural reliability and durability within financial constraints. Smart permanent and short term monitoring can reduce the associated risk of new design concepts by observing the performance of structural components during prescribed time periods. The objectives of this paper are the discussion and analysis of influence line or influence field approaches in terms of (a) an efficient incorporation of monitoring information in the structural performance assessment, (b) an efficient characterization of performance indicators for the assessment of structures, (c) the ability of optimizing the positions of sensors of a monitoring system, and (d) the ability of checking the robustness of the monitoring systems applied to a structure. The proposed influence line- model correction approach has been applied to an integrative monitoring system that has been installed for the performance assessment of an existing three-span jointless bridge.

Comparative numerical analysis for cost and embodied carbon optimisation of steel building structures

  • Eleftheriadis, Stathis;Dunant, Cyrille F.;Drewniok, Michal P.;Rogers-Tizard, William;Kyprianou, Constantinos
    • Advances in Computational Design
    • /
    • v.3 no.4
    • /
    • pp.385-404
    • /
    • 2018
  • The study investigated an area of sustainable structural design that is often overlooked in practical engineering applications. Specifically, a novel method to simultaneously optimise the cost and embodied carbon performance of steel building structures was explored in this paper. To achieve this, a parametric design model was developed to analyse code compliant structural configurations based on project specific constraints and rigorous testing of various steel beam sections, floor construction typologies (precast or composite) and column layouts that could not be performed manually by engineering practitioners. Detailed objective functions were embedded in the model to compute the cost and life cycle carbon emissions of the different material types used in the structure. Results from a comparative numerical analysis of a real case study illustrated that the proposed optimisation approach could guide structural engineers towards areas of the solution space with realistic design configurations, enabling them to effectively evaluate trade-offs between cost and carbon performance. This significant contribution implied that the optimisation model could reduce the time required for the design and analysis of multiple structural configurations especially during the early stages of a project. Overall, the paper suggested that the deployment of automated design procedures can enhance the quality as well as the efficiency of the optimisation analysis.

An Interactive Design System for Construction of Superyacht Profiles based on Freeform Curve Functionality (자유곡선의 모델링기능을 활용한 대화식 수퍼요트 프로파일 설계시스템 개발)

  • Nam, Jong-Ho;Kim, Dong-Ham
    • Journal of Ocean Engineering and Technology
    • /
    • v.22 no.2
    • /
    • pp.78-84
    • /
    • 2008
  • As a preliminary step to build a complete superyacht hull design program, the development of superyacht profile design system is introduced. The two-dimensional hull profile is decomposed into four local zones depending upon the functionality and connecting continuity of the profile. Characteristics of each zone are investigated and used to generate the model describing the geometric shape of zone using freeform curves. A set of design parameters is derived from the established geometric model. Generation and modification of a model are is by manipulating the chosen parameters. Four zones designed are integrated to form a final profile. An interactive design system performing all the modeling and modification processes is implemented using the graphic user interface system based an Microsoft Foundation Class and OpenCASCADE, a open graphic library. The shapes of the profiles generated by the developed design system are verified with those of built superyachts. The developed design system will be used for the construction of three-dimensional superyacht hull modeling system.

Evaluation Model for Design Quality using Change Order Analysis (설계변경 분석을 통한 설계품질 평가모델)

  • Lee Seung-Heon;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.72-79
    • /
    • 2000
  • Design quality in constructed project is a primary consideration to achieve overall project objectives. It is not easy to evaluate the design quality because various factors are involved in the design process. This paper presents a new approach to improve the evaluation process of design quality In the construction project The evaluation model is developed to satisfy the requirement for implementing the ISO 9000 Quality Assurance Standards in the design process. It is assumed that design changes are resulted from the poor management of design quality. The model relates design changes to design quality management items. It assigns weight ratio to each design quality item to evaluate quantitatively Design Quality Index (DQI) is calculated to assess design quality based on the Objectives Matrix. A case study is performed to illustrate the practical implementation of the design quality evaluation.

  • PDF