• Title/Summary/Keyword: demolition work

Search Result 96, Processing Time 0.02 seconds

A Study on the estimation method for the term of demolition work In Low-rise Apartment house - Focus on Clutcher Method - (저층아파트 해체공사의 공기산출에 관한 연구 - 압쇄공법을 중심으로 -)

  • 양극영;문명완;이대재;윤여완;정미선
    • Journal of the Korean housing association
    • /
    • v.8 no.3
    • /
    • pp.231-236
    • /
    • 1997
  • After 1970 Years. Korea has developed a concept of public domestic housing. But this house is reached the uppermost limit time of using the occupant's satisfying life. Then reconstruction of Apartment house is urgently needed which is developed in Korea. So this study is examined the demolition work on current reconstructing apartment site. for reconstruction. Therefore this research examined the fitted demolition time of low-rise house and characteristics of demolition works. The conclusions from this experiment are shown below. 1. The average day work in clutcher method is shown about 1, 032㎥/Day. 2. The calculations of the term of construction which is produced by the analysis of demolition construction period on low-rise house is below. D(day) = S(day) + (0.272+0.000902b(㎥))+R(day)

  • PDF

Structural Analysis Methods for RC Building Demolition Work under Heavy Equipment Loading (해체공사 실무자를 위한 기계식 해체대상 RC구조물의 해석기법 제안)

  • Park, Seong-Sik;Lee, Bum-Sik;Park, Ji-Young;Kim, Hyo-Jin;Sohn, Chang-Hak
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.569-575
    • /
    • 2011
  • In domestic mechanical demolition work against RC building, unsuitable selection and loading of heavy equipment have led to occasional accidents such as collapse of structural members during the work. Therefore, proper analysis technique to easily decide allowable equipment load on the structure is needed at the planning stage of mechanical demolition work. In this paper, performing loading test and elastic analysis against 4-story building at full scale, we confirm appropriateness for allowable load of equipment on RC structures, which was suggested in previous study, and suggest structural analysis method that can evaluate safety of RC building during the mechanical demolition. The suggested method can be effectively utilized to improve work efficiency through safety of mechanical demolition work against RC building and proper management of equipments.

Demolition Cost Estimation of Small-size Rental Housing based on the Quantity per Unit Method (원가계산방식에 의한 다가구임대주택 해체공사비 예측)

  • Park, Seong-Sik;Lee, Sung-Bok;Shin, Sang-Hoon
    • Land and Housing Review
    • /
    • v.2 no.4
    • /
    • pp.415-427
    • /
    • 2011
  • This study is aiming at estimating the demolition cost of deterioration housing by the rational method in order to provide for the demolition and new build project of the rental multi-family housing of LH. We investigated the actual state of demolition construction and work process of small size housing, and analysed an actual condition of estimation for the demolition cost through an advice by the expert of construction cost estimate. Furthermore, the 'estimation standard for the predetermined amount', 'estimation standard for the disposal cost of construction wastes' and precedent studies in public construction work were considered. As one of results in this study, cost accounting system, breakdown system and construction cost for the demolition work based on the standard of estimate were proposed and the predetermined amount of demolition construction for the multi-family housing with 2 or 3 floors could be produced by them. Eventually, It is estimated that the demolition cost per a multi-family housing is about 18,331,000(won) and 104,000(won) per floorage($m^2$). To the details, the result indicated that the direct demolition cost needs about 14,339,000(won) per a multi-family housing and the consignment disposal cost of wastes needs 3,992,000(won) per one. The results of the study will be used as the fundamental data to estimate the project cost in the phase of budget establishment for demolition and new build project of the deteriorated rental multi-family housings, and also cost accounting system of demolition construction and breakdown system are expect to be used effectively at the ordering of public construction work.

Estimation of the Waste Generation in Building Demolition Work using Drone (드론-BIM 기반 건축물 해체공사의 폐기물 발생량 평가)

  • Ryu, Jung Rim;Park, Won-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.309-310
    • /
    • 2021
  • In order to respond to environmental problems and to efficiently recycle resources, it is important to evaluate the amount of construction waste generated. In particular, the estimation of the amount of waste generated in the demolition work was performed based on the basic unit of waste generated per floor area. This study proposes a method using drones as a method for evaluating the amount of demolition waste in a wide area. In the simulated application, the field measurement results and the proposed method were compared, and the effectiveness of the building volume calculation using drones was confirmed. It was confirmed that the building volume can be calculated quickly in the additional pilot application.

  • PDF

On the explosive demolition technology of construction building CDI, USA (미국 CDI사의 건축물 발파해체 기법)

  • 장병하
    • Explosives and Blasting
    • /
    • v.13 no.4
    • /
    • pp.73-81
    • /
    • 1995
  • Explosives demolition mothod is allowed for more efficient time-saving and safer demolitioni operations as compared to conventional / mechanical demolition methods. CDI has to minimize the effects of noise, dust and various demolition hazards to the public areas, and residences that are located adjacent to the project site. CDI's explosives demolition work on the Nam san Foreigner's Apartment Complex and chosun trading Co's factory are backed by over 45 years of explosives experience in the demolition of over 6,000 structures worldwide, many of these structures are similar to the Nam san Foreigner's Apt. and Chosun trading's factory in construction and proximity to sensitive adjacent exposures. Recoginized worldwide as the founder of the leader in explosives demolitioni technology, CDI always will applied "State-of-the-Art" explosives techniques to safely and successfully achieve the desired demolition results on these project. CDI has never injured, much less caused any fatality, to either a worker on one of our sites or to a third party during the implosion of high-rise structure.

  • PDF

Economic Evaluation of Eco-friendly Demolition Work and Case study in Remodeling Project (친환경 리모델링 철거공사의 경제성 평가 및 사례적용)

  • Kim, Yoon-Duk;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.45-53
    • /
    • 2010
  • When increasing quantity of construction wastes, how to deal with construction wastes and environmental problems relating to disposal of construction wastes are discussed as social issues, treatment of construction waste and subsidiary issues are raised as important problems. The demolition work produce construction wastes most in construction industry. Various researches on eco-friendly treatment of construction wastes, recycling rates and recycled materials were conducted aspect of sustainability in developed countries, however, domestic remodeling projects were performed demolition work with first-demolition and second-classification method which emphasize productivity focused on efficiency. It caused not only environmental problems, but also economical problems such as increasing disposal cost of construction wastes. Solving these problems, the previous study, suggested the process model of eco-friendly demolition work to recycle materials. This paper applied eco-friendly remodeling process to practical projects and economic feasibility on eco-friendly remodeling process. Moreover these results expect to contribute the revitalization of eco-friendly demolition work in remodeling projects.

A Case Study on Blast Demolition Work of a Pier Structure (교각구조물 발파해체 시공사례)

  • Park, Keun-Soon;Lee, Joon-Seok;Park, Sang-Soo
    • Explosives and Blasting
    • /
    • v.25 no.2
    • /
    • pp.47-60
    • /
    • 2007
  • The blast demolition technology has been used to demolish various industrial facilities and tall buildings since 1950s in the advanced countries such as USA and U.K. It is now considered as one of safe demolition methods in the above countries. In Korea, several companies have tried to introduce blast demolition technology in the early days of the 1990s. However, this technology is still at the beginning stage and not fully adopted due to situation of avoiding technology transfer by overseas technical tie-up companies, lack of objects to be demolished and low level recognition on blast demolition. This technology shall be considered as a cutting edge technology to be applicable to demolition of skyscrapers, various industrial structures and factory buildings in the near future. Blast demolition of a pier structure was carried out under the site condition where there were already the constructed 2 pier structures of up and down line which had safety problems in an expressway construction project. The pier structures need to be demolished and reconstructed for a short period of time in consideration of the construction work process to be followed.

A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis (생산성 분석에 기초한 친환경 리모델링 철거공사 기간 산출 방안)

  • Woo, Joong-Pyung;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.124-132
    • /
    • 2013
  • An influx of the population to the city has soared due to industrialization. As times go by, cities become densely populated so Korean government started to construct a number of buildings including apartment housings. Because they have become functionally, structurally, esthetically deteriorated over the past two decades. some improvements are needed. There are mainly two ways to improve old buildings: remodeling and reconstruction. Between the two, the first one is more popular as it is less time-consuming and more eco-friendly. Demolition work comes first for both of them and it should not give negative effects since it is regarded as a CP(Critical path) in the overall process. For this reason, a thorough construction management must be done. The reality, however, demolition is managed by the construction manager's experiences and decisions. If the key factor of demolition which is the planning of manpower and machine equipment, is determined by unscientific and subjective judgments, its period and risk also will increase. In particular, eco-friendly demolition can be more risky because it's been rarely conducted. Therefore, scientific and objective ways of demolition management are needed. In this context, this paper aims at analyzing productivity in each process of demolition focusing on manpower and machinery equipment which are the main parts of demolition assuming that the demands of eco-friendly remodeling demolition projects will be increasing. At the same time, by estimating working period through the output, this paper would be helpful to set up the plans for overall project in earlier stage.

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

A Model for Evaluating Eco-friendly Demolition Works for Remodeling in the Pre-construction Stage (친환경 리모델링 철거공사 수행을 위한 사전검토 모델 개발)

  • Chae, Seong-Hyun;Kim, Kyung-Rai;Shin, Dong-Woo;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.14-23
    • /
    • 2012
  • Due to the increase of aged housing demolition in preparation for the rapid growth of the market, Eco-friendly remodeling demolition work which can minimize environmental destruction have been studied. However, the owner or contractor to apply for eco-friendly remodeling demolition work does not reflect the characteristics of the site can not have a potential for many variables. In addition, There is no standard which can find effective part and catch a problem by performing eco-friendly remodeling demolition. Therefore, the project owner and construction company executives in the Pre-construction stage to the implementation of eco-friendly remodeling demolition construction by providing a model for the pre-evaluating the project. In this paper, the performance of eco-friendly remodeling of demolitions is proposed for the pre-evaluating model. After the eight items were drawn affecting the performances which are influence to accomplishment of the eco-friendly remodeling demolition, evaluation criteria was suggested for each item. Also By classifying and assessing the evaluation items, It will be able to identify the problems and supplements for eco-friendly remodeling demolition. Through the final evaluation sheet, The works of the appropriacy and supplement will be checked for the eco-friendly remodeling demolition. Finally The preinvestigation model is helpful for making the plan of systematic demolition, futhermore It is contribute to the expansion of the eco-friendly remodeling demolition.