A Study on the estimation method for the term of demolition work In Low-rise Apartment house - Focus on Clutcher Method -

저층아파트 해체공사의 공기산출에 관한 연구 - 압쇄공법을 중심으로 -

  • Published : 1997.10.01

Abstract

After 1970 Years. Korea has developed a concept of public domestic housing. But this house is reached the uppermost limit time of using the occupant's satisfying life. Then reconstruction of Apartment house is urgently needed which is developed in Korea. So this study is examined the demolition work on current reconstructing apartment site. for reconstruction. Therefore this research examined the fitted demolition time of low-rise house and characteristics of demolition works. The conclusions from this experiment are shown below. 1. The average day work in clutcher method is shown about 1, 032㎥/Day. 2. The calculations of the term of construction which is produced by the analysis of demolition construction period on low-rise house is below. D(day) = S(day) + (0.272+0.000902b(㎥))+R(day)

Keywords

References

  1. 중앙대학교 석사학위논문 건축부산물의 배출량 예측에 관한 연구 서성원
  2. 구조물의 해체공법에 관한 연구(1) 박흥태(외)
  3. 해채공사 김태훈
  4. 해체공법과 적산 유병억(역)
  5. 建築物の解體除去技術に關する調査硏究(財) 日本建築センタ-
  6. Code of Practice for Demolition British Standards Institution
  7. Technical Information Demolition Soc of Explosive Engineers
  8. Demolition of special structures The Concrete Society
  9. Handbook of Noise Control(2nd ed.) Cyril M. Harris