Investigating Main Causes for Schedule Delay in Construction Projects in Bangladesh

  • Rahman, MD. Mizanur;Lee, Young Dai;Ha, Duy Khanh
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.33-46
    • /
    • 2014
  • Delay is the most common problem in the construction industry. It has many negative effects on project's success in terms of time, cost, quality, and safety. From the literature review, a total of thirty-five factors of delay were selected. These factors were divided into seven groups related to materials, manpower, owner, consultant, contractor, construction, and external problems. This study was carried out to identify the main causes of delay for a construction project through their importance level. The importance level was determined based on the frequency of occurrence and severity of impact. The structured questionnaire has distributed to the respondents who have much experience in construction management in Bangladesh. The results of analysis indicated that top five factors of construction delay according to their level of importance are: (1) price of construction materials increased very rapidly, (2) political situation (revolution/ public strikes), (3) shortages of skilled workers, (4) poor site management and supervision by contractor, (5) incompetent/ immature subcontractors. These findings of this study are expected to be significant contributions to Bangladesh construction industry in controlling current performance of project on time overrun.

Types of Train Delay of High-Speed Rail : Indicators and Criteria for Classification (고속철도 열차지연 유형의 구분지표 및 기준)

  • Kim, Hansoo;Kang, Joonghyuk;Bae, Yeong-Gyu
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.38 no.3
    • /
    • pp.37-50
    • /
    • 2013
  • The purpose of this study is to determine the indicators and the criteria to classify types of train delays of high-speed rail in South Korea. Types of train delays have divided into the chronic delays and the knock-on delays. The Indicators based on relevance, reliability, and comparability were selected with arrival delay rate of over five minutes, median of arrival delays of preceding train and following train, knock-on delay rate of over five minutes, correlation of delay between preceding train and following train on intermediate and last stations, average train headway, average number of passengers per train, and average seat usages. Types of train delays were separated using the Ward's hierarchical cluster analysis. The criteria for classification of train delay were presented by the Fisher's linear discriminant. The analysis on the situational characteristics of train delays is as follows. If the train headway in last station is short, the probability of chronic delay is high. If the planned running times of train is short, the seriousness of chronic delay is high. The important causes of train delays are short headway of train, shortly planned running times, delays of preceding train, and the excessive number of passengers per train.

An Analysis on Work Delay Factors in Apartment House Construction (공동주택 공사의 작업지연요소 분석)

  • Ahn, Sang-Hyun;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.6
    • /
    • pp.159-166
    • /
    • 2007
  • Work delay is one of the facts that make the reliability of construction projects decrease. Therefore, it is important to classify and prioritize the delay factors. This research analyzed key delay factors in apartment house construction through survey. The results of analysis are as follows. (1) Insufficient work force is the key delay factor in structural and finish work. (2) Improper craft of worker is the key delay factor in electrical work. (3) Incompletion of proceeding work is the key delay factor in mechanical work.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

Causes of Delay in Construction Projects in Bangladesh

  • Islam, Mohammad Saiful;Trigunarsyah, Bambang;Hassanain, Mohammad;Assaf, Sadi
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.82-86
    • /
    • 2015
  • Construction delay is a common problem worldwide, which is considered as one of the main reasons for project failure. Bangladesh construction industry is no exception. This study investigated the main causes of delay in large building construction projects in Bangladesh. A questionnaire survey was conducted to determine the causes of delay from owners, consultants, and contractors of large building construction projects. About 70 respondents participated in the survey. Using the importance index analysis, the study identified 10 most important causes of delay from a list of 30 different causes. Ten most important causes were: (1) lack of experienced construction manager, (2) lowest bidder selection, (3) funding shortage by owner, (4) lack of proper management, (5) improper planning and scheduling, (6) lack of skilled workers, (7) site constraints, (8) contractors' cash flow problems during construction, (9) escalation of resources price, and (10) contractors' excessive workload. Furthermore, Kruskal-Wallis test indicates that there is no significant variation exists among the three group of respondents, ie owners, consultants and contractors.

  • PDF

THE ROOT CAUSE ANALYSIS METHOD FOR SCHEDULE DELAY IN CONSTRUCTION (건설공사의 작업지연 원인분석방법)

  • Ji, Kun-Chang;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.131-136
    • /
    • 2006
  • In constructing projects, there exist various kinds of work interferences, which cause a delay of the outset and completion of planned schedule because of some attributions, such as variability, uncertainty and complexity. and so schedule delay has been treated as a natural phenomenon. To reduce or prevent the schedule delay, a constant confirmation of schedule delay and a preparation of counter plans for finding out the cause structure of schedule delay should have been done. However, all this time the research has been mostly done on the calculation method or claim cases of schedule delay. Moreover, the analysis method did not consider the trait, which cause the schedule delay, in constructing projects. This paper restricts the range of the cause analysis of schedule delay to the field of site management in the projects and divides the cause structure of schedule delay into the cause objects and cause attributes of schedule delay according to the input elements. The system of classifying causes of schedule delay is examined by interviews with experts and questionnaire. Additionally, this paper analyzes the attributes of cause attributes and cause subjects and presents the analysis method and procedure of schedule delay with the application of VSM.

  • PDF

Delay Analysis Method Considering Productivity (생산성을 고려한 공기지연 분석방법)

  • Koo Ja-Min;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.438-441
    • /
    • 2003
  • Construction delays are a common occurrence of most construction projects and difficult to analyze. there are some techniques to analyze delays, such as using CPM, Bar Chart but they are not enough to analyze concurrent and productivity lost delays. Productivity lost delays are different to interruption delays in computing the number of delays and analyzing concurrent delay. This paper describes the delay analysis method considering productivity including concurrent delay analysis.

  • PDF

Critical Factors Causing Delay on State-Funded Construction Projects in Vietnam

  • Luu, Van Truong;Kim, Soo-Yong;Pham, Nguyen-The-Thanh;Nguyen, Thanh-Long;Nguyen, Tuan-Kiet
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.104-108
    • /
    • 2015
  • Delay on State-Funded Construction Projects (SFCPs) in Dong Thap - a province in Mekong Delta of Vietnam, as many provinces of Vietnam, have caused budget overrun through many recent years. The budget-overrun situations, in turn, have deepened the delay. Identifying critical factors affecting delay SFCPs plays a key role to mitigate negative impact of delay. 134/160 questionnaires were collected from personals working for project owners, consultants, supervisors and contractors in Dong Thap Province. Convenient sampling method was used. EFA was resulted in critical 04 factors with 20 variables caused delay in SFCPs, including: "Project technic, contractor's financial capacity and adjustment role of the government", "Regulation and Policy", "Mutual benefit support and concern between the government and residents", and "Disadvantage of construction site and weather season". Reliable measures to reduce delay on SFCPs are discussed to establish legal corridors to strictly controlling the process, consider mutual benefit between the government and its residents, and evaluating construction conditions. Those measures are considered could be applied in not only Dong Thap province, but most provinces of Vietnam as well.

  • PDF

Construction Delay Risk and its Prevention Measures

  • Acharya, Nirmal Kumar;Lee, Young-Dai;Im, Hae-Man
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.268-270
    • /
    • 2006
  • The purpose of this paper was to explore delay avoiding measures and strategies. The paper was based on previous work of authors on finding delay causes. Firstly, the paper has discussed about delay avoidance measures prescribed by the previous work. As the previous study identified five main causes of construction delays, various measures and strategies to overcome those delay problems have been discussed in sequence in the last sections. Major delay prevention strategies are: involving stakeholders in the project decisions, outreach program, realistic time and resource estimation, try to adjust the triple constraints of time, cost and scope, ensure fair and complete disclosure of information at an early stage of the construction project, contractor, itself should inquire about patent design errors prior to submitting its bid, owner should include in its contract with the consultant an indemnity (protection) clause etc.

  • PDF

Development of a methodology for analysing and quantifying the impact of delay factors affecting construction projects

  • Shebob, Abdulhamid;Dawood, Nashwan;Shah, Raj K.
    • Journal of Construction Engineering and Project Management
    • /
    • v.2 no.3
    • /
    • pp.17-29
    • /
    • 2012
  • Delays are one of the biggest problems facing by the construction industry and they have significant financial and social impact in construction projects. The paper presents a framework of Delay Analysis System (DAS) with the aim of analysing the impact of delay factors in Libyan construction projects. The system has designed by integrating the possible delay factors, critical activities of a project using@risk simulator. A case study of building project was demonstrated to identify the impact of delays and the sensitivity of delay factor. The case study result showed that the project might be delayed by 97 to 103 days in comparison to the planned duration. The developed DAS is a tool for analysing and identify the impacts of delay factors and assist to construction manager to take necessary measure in reducing the delay impact. The paper provides a methodology for analysing the possible delay impact in a construction project and informing to construction manager in advance of the possible delay factors.