• Title/Summary/Keyword: curtain-wall work

Search Result 19, Processing Time 0.031 seconds

Efficiency Analysis for RFID-based Curtain Wall of unit Type Construction (RFID 기술 적용에 따른 유닛타입 커튼월 공사의 효율성 분석)

  • Kang, Hyun-Koo;Ha, Young-Seo;Lim, Chul-Woo;Kim, Chang-Duk;Yu, Jung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.206-213
    • /
    • 2008
  • Due to the following reasons, the management of curtain wall parts and material is very Important. Firstly, curtain wall work is one of the main works in High-rise building construction for it takes about $10{\sim}15%$ of the total construction cost. Secondly, the whole process of curtain wall work including manu acture, delivery, storage, installation and maintenance is very complicated and sometimes more than 30 companies involve in the process. Thus there are many control points for curtain wall units. Thirdly, there are not enough space on site for material storage and this situation is more serious for sites in urban area. The purpose of this research is to validate an information systems using RFID technology that is developed to manage the curtain wall units following the process of curtain wall work. For the validation, the cycle times of curtain wall work before and a ter the system was used. The results show that using the systems shorten the cycle time of the curtain wall work. Thus it is concluded that the system can increase the efficiency of managing curtain wall work.

A Productivity Analysis Method of Curtain Wall Works Using Construction Simulation (건설 시뮬레이션을 활용한 커튼월 적층공법의 생산성 분석방안)

  • Park, Dong-Geun;Lee, Kyung-Suk;Yu, Byung-In;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.256-261
    • /
    • 2008
  • The curtain-wall work has been more frequently applied in the construction industry since demand of high-rise buildings has been increased. The curtain-wall work is usually performed with the frame work simultaneously for reducing construction period, but it might be delayed because of several problems caused by interference of process. However, there is not an appropriate tool which can be used by a work manager for adjusting quantity of the construction equipments or the workers when the curtain-wall work was delayed. To resolve this problem a construction simulation anticipating and analyzing potential problems before starting the work can be applied in the curtain wall work. This research suggests a general model for the curtain-wall work by using construction simulation and produces a combination of construction equipments and workers which can estimate optimum work productivity.

  • PDF

Development and Performance Evaluation of Under Cut Anchor Stone Curtain Wall Construction Method (언더컷 앵커 방식의 석재 커튼월 공법 개발 및 성능평가)

  • Chang, Kug-Kwan;Park, Nam-Wook
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.18 no.4
    • /
    • pp.138-146
    • /
    • 2014
  • Structural safety as well as variety and aesthetics of building facade are currently gathering more attention in building construction and stone curtain wall is widely used in exterior wall. However, two main problems are existed in curtain wall construction method. One is an uniformity of construction quality and the other is a repair work of stone panels. Also, the noise and vibration occurring in construction may be cause of civil complaint. Therefore, a new method is needed to overcome these problems. This paper presents a new stone curtain wall system using under cut anchor and secondary holes that was developed in this study. Additionally, structural performance evaluation was conducted to verify the constructability and structural safety for wind pressure and seismic load. Through the evaluation of this method, improved constructability and economic efficiency were verified.

Comparison on the Application of Various Productivity Analysis Methods for a Curtain wall Operation in High-rise Building Construction (초고층 커튼월 공사의 생산성 분석 기법에 대한 적용성 비교)

  • Lee, Tae-Hee;Ko, Yong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.211-212
    • /
    • 2011
  • The construction industry has become larger and higher in size. The process of high-rise building construction is complicated and has various conditions affecting productivity. Analysing productivity in high-rise buildings is difficult despite the various productivity analysis methods. In this study, data was collected from actual construction site to analyse the productivity of curtain wall operation by means of Work sampling and Method Productivity Delay Model. As a result, this paper suggests advantages and disadvantages deducted from comparing the two productivity analysis methods.

  • PDF

A Study on the Development of the Structural Performance Evaluation Manual of the Skyscrapers Curtain Wall Systems for Construction Managers (초고층건축 알루미늄커튼월 구조설계검토 프로세스와 매뉴얼 개발에 관한 연구: 멀리언과 트랜섬을 중심으로)

  • Cho, Ye-Won;Lee, Min-Cheol;Ock, Jong-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.92-101
    • /
    • 2009
  • The purpose of this study was to develop the curtain-wall structure design evaluation manual that can easily examine the curtain-wall structural members (Mullion and Transom) stability from the position of the construction managers. Through analyzing the structural design reports in the previous studies and interview with industry experts, the curtain-wall structural member design process was elicited. The manual, which consists of Microsoft Excel-based work sheet and its manual, was applied to a real curtain-wall design project to make sure its usability. A workshop with three curtain-wall experts and three construction managers was conducted to identify pros and cons of the manual, thereby enhancing its applicability in the future.

Development of Stone Curtain Wall Anchor Method for the Constructability Improvement (시공성이 개선된 석재 외장재 앵커공법 개발)

  • Park, Nam Wook;Kim, Jong Seong;Kim, Sung Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.76-77
    • /
    • 2014
  • Stone is one of the oldest and most popular materials used on the external wall because of its durability, abundance and aesthetic effect. However, there are two main problems in the existing pin hole construction method. One is uniformity of construction quality, and the other is a repair work of stone panels. Therefore, a new method is needed to overcome these problems. This paper presents a new stone curtain wall system using under cut anchor and secondary holes that was developed by authors. The improved quality and reduction of construction period can be obtained by this system.

  • PDF

Effects of Fire Curtain and Forced Smoke Ventilation on Smoke Spread to Auditorium in Stage Fire of Theater (공연장 무대 화재 시 방화막과 강제 배연구가 객석으로의 연기 확산에 미치는 영향)

  • Kim, Jae Han;Kim, Duncan;Lee, Chi Young
    • Fire Science and Engineering
    • /
    • v.31 no.5
    • /
    • pp.28-36
    • /
    • 2017
  • In this work, the effects of fire curtain and forced smoke ventilation on smoke spread to auditorium in the stage fire of theater were investigated using the Fire Dynamics Simulator (FDS). For the stage of 31 m (Width)${\times}$34 m (Depth)${\times}$32 m (Height) in dimension, the fast growth fire condition with 10 MW of heat release rate was applied. The forced smoke ventilation was set based on the National Fire Safety Code (NFSC) and previous research. The gap distances between the fire curtain and proscenium wall was established to be 0 m and 0.5 m. When the fire curtain was attached completely to the proscenium wall without any gap, no smoke spread from the stage to the auditorium occurred, independent of forced smoke ventilation. When the gap distance between the fire curtain and proscenium wall was 0.5 m, the smoke layer in the stage descended to the lower height from the bottom than the case without the fire curtain, which was because the smoke spread to auditorium was impeded by the fire curtain. Under the same fire curtain condition, the case with the forced smoke ventilation led to decreasing the mass flow rate of outflow through the gap between the fire curtain and proscenium wall, as compared to the case without the forced smoke ventilation. Based on this study, it was confirmed that the fire curtain and forced smoke ventilation were the effective tools to hold down the smoke spread to the auditorium in the stage fire of theater.

A Study of the Automation System using a Multi-DOF Manipulator for the Curtain Wall Installation in a Skyscraper (다 자유도 매니퓰레이터를 이용한 커튼월 시공 자동화에 관한 연구)

  • You, Seung-Nam;Lee, Soung-Yel;Choi, Hyeun-Seok;Lee, Kye-Young;Lee, Sang-Heon;Han, Chang-Soo
    • Proceedings of the KSME Conference
    • /
    • 2004.04a
    • /
    • pp.940-945
    • /
    • 2004
  • Recently, the trend in architectural forms has been toward taller and larger building. The building materials, therefore, are getting larger and heavier as wall. Most of the construction projects are, however, dependent on outdated equipment and human resources. Construction processes up to now face a number of problems, including dangerous work, high construction cost and heterogeneous construction quality. In various construction sites, automation in construction has been introduced to address these problems. This paper proposes a human-machine cooperative system in the construction site; the system utilizes construction of a curtain wall in tall buildings. The use of automation system at construction sites can reduce the need of human involvement. Construction time and cost can be reduced as well. The most important aspect of the use of automation system at construction sites is prevention of accidents.

  • PDF

Conceptual design development of Guide Rail for Cleaning Robot in Curtain Wall Facade of Skyscraper (초고층 건축물 외벽 청소로봇 운용을 위한 가이드레일 개념(안) 개발)

  • Kim, Chang-Han;Han, Jae-Goo;Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.2
    • /
    • pp.220-229
    • /
    • 2012
  • In recent years, the number of high-rise buildings has been on the rise. As buildings have become larger in scale, significantly different issues related to their construction and maintenance have emerged. In addition, the automation and mechanization of the cleaning work for the curtain wall, one of the most frequently-performed tasks in building maintenance, is required as a fundamental measure. For this reason, a guide-rail cleaning robot system is emerging as one of the measures in response to external factors, including gust. Therefore, this is a preliminary study for the automation and mechanization of the curtain wall cleaning of high-rise buildings, and aims to derive the basic units and prepare for the concept of the guide rail. It is expected to serve as precedent research for the development and operation of a curtain-wall cleaning robot, and to prepare the basis for an final design of optimal guide rail.

Case Study on Seepage Analysis and Countermeasure Against the Seepage Flow of In-ground LNG Storage Tank (LNG 지하저장탱크의 침투해석 및 용수 대책공법에 대한 사례분석)

  • 신은철;오영인;이상혁
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.03a
    • /
    • pp.65-72
    • /
    • 2001
  • Since Pyoungtaek thermal power plant began using natural gas in 1986, the annual using volume has rapidly increased and reached 12.7 million tons in 1999. When the natural gas is cooled to a temperature of approximately -162$^{\circ}$C at atmospheric pressure, it condenses to a liquid called liquefied natural gas(LNG). LNG has a special characters such as odorless, colorless, non-corrosive, and non-toxic. So, LNG storage tank, tanker ship, transfer pipelines are required the special storage and transportation systems and technology. The presently operating LNG terminals are Pyongtaek and Inchon terminals. A total of 19 above-ground LNG storage tanks(100 thousand ㎘ grade) are currently in operation with a sendout capacity of 4,360tons/hour. To meet the growing domestic demand of LNG supply, the Inchon receiving terminal is expanding(six in-ground tank) and constructing a third LNG terminal at Tongyong. In this paper, case study on seepage analysis and countermeasure against increasing the seepage volume of in-ground LNG storage tank excavation work is reported. The results of an additional seepage analysis are presented to verify the design seepage volume of assumption section and seepage volume after curtain-grouting in the slurry wall.

  • PDF