• 제목/요약/키워드: critical path method

검색결과 221건 처리시간 0.032초

준공현장의 분쟁해결방안으로서의 사후적 공정분석에 관한 연구 (Studies on Post Contract Schedule Analysis)

  • 고기혁;박성필;김용길
    • 한국중재학회지:중재연구
    • /
    • 제32권4호
    • /
    • pp.103-141
    • /
    • 2022
  • Traditionally, schedule analysis in Korea has been used, mainly through the Critical Path Method, to evaluate the claim for extension of time and/or the amount of liquidated damages for delay. Critical path method, however, cannot identify the delay event and its impact occurred in non-critical path especially in multi facility projects. In multi facility projects that comprise several independent but related facilities or structures, each facility has its own facility critical path the duration of which will be impacted by facility specific critical delays. Thus, only through the non-critical delay analysis along with the critical delay analysis damages not attributable to contractors may be remedied in full. Because all the records and pictures can reveal what has actually happened in post contract review, only the retrospective analysis rather than the prospective analysis based on the assumptions can establish the cause and allocate the each parties' responsibilities appropriately.

Critical Path 기법을 이용한 자동화 시스템의 공정 최적화 사례 연구 (Process Optimization of an Automated System Using Critical Path Method)

  • 이승연;강길순;장종태;유준
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 학술회의 논문집 정보 및 제어부문 A
    • /
    • pp.219-222
    • /
    • 2003
  • 본 논문에서는 주어진 자동화 시스템에 대하여 Critical Path 기법을 적용한 최적화 연구를 수행하였다. 탄약 운반 자동화 시스템에 대하여 공정순서와 시간개념이 들어간 Timed Petri-Net을 이용한 이산사건 공정모델을 구축하였으며, 이를 기초로 초기조건 및 제약조건을 고려하여 제악탐색기법을 이용하여 Critical Path를 찾고 여유 공정을 산출항으로써 공정 시간 최적화를 수행하였다.

  • PDF

Quantifying Monetary Value of Float

  • Park, Young-Jun;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.111-113
    • /
    • 2015
  • Floats are used by the parties involved in a construction project. The owner may use float by changing order(s) or by executing risk avoidance plan; the contractor may use it for leveling resources or substituting activities' construction methods to reduce costs. Floats are accepted either just as by-product obtained by critical path method(CPM) scheduling or as asset having significant value. Succinctly, existing studies involved in float value does not consider its' changes on project time domain. It is important to identify float ownership and to quantify its' corresponding values. This paper presents a method that quantifies float value of money that changes over project execution. The method which accurately computes the monetary value of float may contributes to resolve conflicts relative to float ownership and/or delay issues among project participants. It compares the difference between the monetary value of total float - on non-critical path in each and every schedule update. It makes use of critical path method (CPM) and commercial software with which practitioners are already familiar.

  • PDF

반복작업 PERT 네트워크의 확률기반 주공정 산정기법 (Probability-based Critical Path Estimation for PERT Networks of Repetitive Activities)

  • 이규진
    • 한국건축시공학회지
    • /
    • 제18권6호
    • /
    • pp.595-602
    • /
    • 2018
  • 건설공사의 공정 계획에 많이 사용되는 네트워크 방식의 공정표는 CPM방식과 PERT 방식으로 분류할 수 있다. 네트워크 공정표에서는 주공정선의 산정은 전진 계산과 후진 계산을 통하여 가장 합계기간이 크게 산출되는 경로를 선택하는 방식에 의하는 것이 일반적이다. CPM 기법에서는 각 액티비티의 소요기간이 고정된 값으로 제시되므로 이를 기반으로 하여 주공정선의 산정이 용이하다. 그러나 PERT 네트워크에서는 소요기간이 확률적으로 주어지므로 단순히 특정 경로 상 액티비티 기간의 합계만으로 주공정은 정하는 것은 불합리하며, 확률에 기반하여 산정된 예상기간에 의해 최가능 주공정으로 제시되어야만 PERT의 목적에 부합할 것이다. 이는 목표 기간에 따라 주공정선이 변화할 수 있으며, 경우에 따라서는 예상 기간이 더 작은 경로가 최가능 주공정이 될 수 있음을 의미한다. 이러한 개념에 의거하여 본 연구에서는 PERT 네트워크 공정표에서 경로별로 예상기간의 비교를 통해 확률적 의미를 가진 최가능 주공정을 도출하는 기법을 제안하는 것을 목적으로 진행한다. 체계적인 대안 경로 도출을 위해 작업 구획과 작업 공정이 교차하여 반복적으로 진행하는 방식의 네트워크 반복 작업 공정표를 대상으로 하여 대안 경로 도출 방식을 제시하였으며, 도출된 경로를 대상으로 예상 기간과 표준 편차를 산출하여 예상기간이 목표 기간을 초과할 확률을 기반으로 하여 최가능 주공정을 산출하는 기법을 제안하였다. 사례 연구를 통해 최가능 주공정은 고정된 경로가 아니며 목표 기간과 표준편차에 따라 변화할 수 있음을 예시한다. 본 연구에서 제시된 기법은 건설 공사와 같이 목표 공사기간이 변화하는 상황에서 유용하게 활용될 수 있을 것이며 기간 예측의 리스크를 명확화하는데 도움을 줄 수 있을 것으로 기대된다.

양방향 알고리즘을 이용한 2의 보수 표현 기법에 의한 디지털 필터의 설계에 관한 연구 (Study on Design of Digital filter by 2's Complement Representation using Bidirectional algorithm)

  • 이영석
    • 한국정보전자통신기술학회논문지
    • /
    • 제2권1호
    • /
    • pp.37-42
    • /
    • 2009
  • 디지털 신호 처리 분야에서 디지털 필터는 필수불가결한 요소이다. 디지털 필터는 이진수의 곱셈 및 덧셈을 기본으로 하는 것으로 많은 연산량을 필요로 한다. 디지털 필터 내의 곱셈기는 VLSI 기술을 이용한 디지털 필터의 설계에 있어 반도체 칩 내부의 넓은 영역을 차지하고 전력의 대부분을 소비하며, 필터의 critical path를 결정하여 필터의 성능을 결정하는 중요한 요소로서 작용 한다. 본 연구에서는 특히 디지털 필터의 복잡성(complexity)를 해소하고 critical path를 줄여 필터의 연산속도를 증가시키기 위한 방법으로 2의 보수로서 표현되는 이진수를 CSD(canonical signed digit)와 MSD(minimal signed digit)로 동시에 변환하여 표현하는 방법을 제안하였다. 제안된 방법은 VHDL로 구현하고 임의의 필터에 적용하여 필터의 critical path가 감소하는 것을 보였다.

  • PDF

가정배달 노인급식서비스 작업공정관리 모형개발을 위한 PERT-Type System의 적용 (Application of a PERT-Type System on Work Management in Home-Delivered Meals Service Program for Elderly)

  • 양일선;채인숙;유일근
    • Journal of Nutrition and Health
    • /
    • 제34권6호
    • /
    • pp.701-714
    • /
    • 2001
  • The purpose of this study was to apply a PERT-type system, a combination of the project evaluation and review technique(PERT) and critical path method(CPM) on the employees' work time management of flood preparation, assembly, transportation and cleaning in home-delivered meals program for elderly The resources allotment heuristic program was developed by considering the number of employees and cooking utilities, being limited resources of home- delivered meals program. This program could assign the employees to perform the works included in flood preparation, assembly, transportation ind cleaning. Critical path and activities ware identified by PERT-type system on the basic of work time investigation in five senior centers. Work sheets were invented to perform the work by the shortest path with flexible employees'maximum flow As a result of the work time investigation, the most prevalent activities were ones of preparation in center C and E. Besides, the preparation(over fifty percent) was the most proportion among flood preparation, assembly, transportation and cleaning in center C and E. Critical path and activities of 'C'center were cucumber in sauce preparation path and assembly, wrapping in assembly path and case delivery in transportation path. Critical path and activities of 'E'center were Pan-fried Potato Preparation Path and assembly, case covering, wrapping in assembly Path. The work sheet invented by the heuristic program and PERT-type system reduced the work completion time and man hours in both centers.

  • PDF

Complete Time Algorithm for Stadium Construction Scheduling Problem

  • Lee, Sang-Un
    • 한국컴퓨터정보학회논문지
    • /
    • 제20권9호
    • /
    • pp.81-86
    • /
    • 2015
  • This paper suggests heuristic algorithm with linear time complexity to decide the normal and optimal point at minimum loss/maximum profit maximum shortest scheduling problem with additional loss cost and bonus profit cost. This algorithm computes only the earliest ending time for each node. Therefore, this algorithm can be get the critical path and project duration within O(n) time complexity and reduces the five steps of critical path method to one step. The proposed algorithm can be show the result more visually than linear programming and critical path method. For real experimental data, the proposed algorithm obtains the same solution as linear programming more quickly.

워크플로우 임계 경로에 관한 분석 (Analyses on the Workflow Critical Path)

  • 손진현;장덕호;김명호
    • 한국정보과학회논문지:데이타베이스
    • /
    • 제28권4호
    • /
    • pp.677-687
    • /
    • 2001
  • 임계 경로는 방향성 비순환 그래프 분야를 포함하여 많은 컴퓨터 공학 분야들에서 널리 활용되어 왔다. 워크플로우에서 임계 경로는 여러 개의 예상 수행 경로들 중에서 가장 긴 평균 수행 시간을 가지는 하나의 경로로 정의되며, 이 개념은 워크플로우 옹용 영역들에서 유용하게 사용될 수 있다. 일반적 으로 특정 워크플로우에 대해 동시에 수행되는 워크플로우 인스턴스들이 여러 개가 존재하므로 워크플로 우 환경에 적합한 새로운 임계 경로 결정 방법의 개발이 필요하다. 본 논문에서 우리는 먼저 워크플로우 특징들을 쉽게 분석할 수 있는 워크플로우 대기 행렬 네트워크 모델에 대해서 언급한다. 그리고, 이 모델을 기반으로 워크플로우 임계 경로를 결정하는 방법을 제안한다. 추가적으로. 워크플로우 임계 경로 개념을 효율적으로 활용할 수 있는 워크플로우 응응 영역들을 몇가지 소개한다.

  • PDF

Optimal Path Planning Using Critical Points

  • Lee, Jin-Sun;Choi, Chang-Hyuk;Song, Jae-Bok;Chung, Woo-Jin;Kim, Mun-Sang
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2001년도 ICCAS
    • /
    • pp.131.4-131
    • /
    • 2001
  • A lot of path planning algorithms have been developed to find the collision-free path with minimum cost. But most of them require complicated computations. In this paper, a thinning method, which is one of the image processing schemes, was adopted to simplify the path planning procedure. In addition, critical points are used to find the shortest-distance path among all possible paths from the start to the goal point. Since the critical points contain the information on the neighboring paths, a new path can be quickly obtained on the map even when the start and goal points change. To investigate the validity of the proposed algorithm, various simulations have been performed for the environment where the obstacles with arbitrary shapes exist. It is shown that the optimal paths can be found with relative easiness.

  • PDF

조합논리회로를 위한 새로운 Path-Based 타이밍 최적화 알고리듬 (Path-based new Timing Optimization Algorithm for Combinational Networks)

  • 양세양;홍봉희
    • 전자공학회논문지A
    • /
    • 제29A권9호
    • /
    • pp.85-93
    • /
    • 1992
  • In this paper, the new timing optimization algorithm for combinational networks is proposed. First, we introduce the concept of P-path redundancy which is the extension of redundancy concept used in the testing of combinational networks. In this approach, the critical delay is minimized by removing the P-path redundant side inputs of the critical path, and more accurate timing optimization is possible by systematically considering the statically unsensitizable paths as well as the statically sensitizable paths. It's possible with all previous longest path based approaches that the critical delay of resulting network after timing optimization may be even increased. However, the proposed method guarantees to exclude such a possibility, and can be applied to optimize the timing of combinational networks in technology independent, and dependent phase.

  • PDF