Journal of the Korea Institute of Building Construction
/
v.23
no.6
/
pp.785-796
/
2023
The adoption of Environmental, Social, and Governance(ESG) practices in domestic construction firms is predominantly driven by major corporations. These companies not only publish reports on their ESG management but also engage in a meticulous process of identifying key issues and setting priorities. This process entails an in-depth evaluation of the severity of various issues and the gathering of insights from experts in the field. Interestingly, a comparative analysis of ESG assessments for construction companies, both domestically and internationally, reveals significant discrepancies in outcomes. These differences stem from the varied evaluation methodologies and criteria employed by different assessing bodies. Addressing this gap, our study proposes a suite of strategies aimed at bolstering ESG management within the construction sector. We advocate for enhanced policy support and financial backing, especially targeting small and medium-sized enterprises(SMEs) to facilitate their engagement in ESG practices. A critical step forward involves the standardization and transparent disclosure of ESG evaluation criteria, tailored to reflect the unique aspects of the construction industry. Moreover, the standardization and publication of ESG assessments for subcontractors are essential, equipping them with the necessary tools for effective ESG management and evaluation. Given the global nature of construction projects, particularly those commissioned by the European Union in regions like Africa and East Asia, adherence to ESG standards is imperative. Our long-term vision includes the development of a comprehensive database detailing ESG regulations and their impacts, segmented by region and country. This repository will serve as a valuable resource for companies venturing into international construction projects.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.24
no.1
/
pp.125-132
/
2024
The purpose of this study is to discover a drone utilization model tailored to local characteristics, propose directions for building a drone demonstration city based on demand surveys for drone activation, and suggest ways to utilize and support a drone application system. First, according to the survey results, there was a high understanding of and necessity for drone demonstration projects, particularly in addressing urban issues, which were deemed to have a significant impact. Second, based on the analysis of priorities and short- and long-term approaches, disaster-related tasks were evaluated as a priority, requiring an approach through medium- to long-term strategies. Third, it was noted that budgetary considerations emerged as the most critical issue during project implementation. Practitioners and experts expressed willingness to actively introduce drone-based technologies into their work when budget and technology were ready. Budgetary constraints were identified as the most significant obstacle to proper implementation, emphasizing the need for resolution. Fourth, the necessity of demand surveys during project development was identified in certain areas. Demand surveys were deemed essential for drone-based demonstration city construction, and a survey indicated that public leadership in this regard was also necessary. Fifth, concerning approaches in specific areas, the field of safety and disaster management was highlighted as the most crucial for application.
Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
Journal of the Korea Institute of Building Construction
/
v.24
no.1
/
pp.145-156
/
2024
In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.
Jaewoong Hwang;Heetaek Yoon;Junhyun Bae;Youngkon Park
Land and Housing Review
/
v.15
no.2
/
pp.125-137
/
2024
A conventional Design for Safety (DfS), introduced to eliminate potential hazards in the design phase proactively, has encountered persistent challenges, such as perfunctory risk assessments and hazard identifications based on 2D drawings and inefficient workflow processes. This study proposes a BIM-based approach to Design for Safety (DfS) to address the limitations of conventional methods, aiming to enhance efficiency and achieve practical safety management benefits. The proposed workflow process for BIM-based DfS has been refined and validated for on-site applicability through various case studies, including risk assessments during the design phase and field applications for safety management activities during the construction phase. Specifically, the critical process of risk assessment within the DfS methodology has also been transitioned to a BIM-based approach. This BIM-based risk assessment process has been evaluated through case studies, encompassing safety reviews for structural design, construction equipment operation, and construction methodology with sequence in design projects. Additionally, the proposed BIM-based DfS has demonstrated exceptional on-site applicability and efficiency, as validated by the application of a BIM deliverable embedded in DfS information for CDE-based daily activity briefing, VR-based safety training, AR-based mitigation measures inspections, and other safety management activities in the construction phase.
This study seeks to shed light on the contributions of Horst Klaus Berg to German Bible didactics, underscoring the pivotal role of diverse interpretative approaches in the teaching and learning of the Bible. In an era where the complexities and intricacies of the Bible present significant challenges to contemporary readers, the prevalence of one-dimensional interpretations further obstructs the pathway to a profound comprehension of the spiritual depth embedded within its texts. By centering on Horst Klaus Berg's influential theories in the field of German Bible didactics, this research delves into the impact of varied biblical interpretations on Christian education. Berg's work is celebrated for its insightful strategies, notably his advocacy for comprehensive interpretative methods such as "Railway Tracks" and "Free-Learning." These approaches seek to reconcile traditional biblical teachings with individual experiences, thereby facilitating a more expansive understanding of the Bible's applicability to modern life. Through a detailed examination of Berg's theory on biblical interpretation, this paper argues that Christian education must prioritize the cultivation of diverse interpretative skills and their practical integration into Bible study. This educational model encourages learners to become active interpreters, capable of discerning the text's deep-seated meanings by relating it to their personal experiences. The study concludes by affirming Berg's delineation of three critical tasks in biblical interpretation: "reciprocal interpretation," "acknowledgment of the biblical texts' diversity," and "free learning." These elements are portrayed as interrelated and essential, reinforcing Berg's proposition that understanding the Bible's complexity and diversity is crucial for advancing Christian education. This paper offers a novel perspective on the significance of embracing multifaceted interpretations within the domain of biblical studies.
Generally, when constructing a tunnel close to existing structures, the tunnel must be built at a constant distance from the structures that is more than width of tunnel to minimize the impact of interference between an existing structures and new tunnel. Spacing of these closed tunnels should be designed considering soil state, size of tunnel and reinforcement method. Particularly when the ground is soft, a care should be taken with the tunnel plans because the closer the tunnel is to the existing structures, the greater the deformation becomes. As methods of reviewing the effect of cavities on the stability of a tunnel, field measurement, numerical analysis and scaled model test can be considered. In the methods, the scaled model test can reproduce the engineering characteristics of a rock in a field condition and the shape of structures using the scale factor even not all conditions cannot be considered. In this study, when construction of a tunnel close to existing structures, the method and considering factors of the scaled model test were studied to predict the actual tunnel behavior in planning stage. Furthermore, model test results were compared with the numerical analysis results for verifying the proposed model test procedure. Also, practical results were derived to verify the stability of a tunnel vis-a-vis cavities through the scaled model test, which assumed spacing distances of 0.25 D, 0.50 D, and 1.00 D between the cavities and tunnel as well as the network state distribution. The spacing distances of 1.0 D is evaluated as the critical distance by the results of model test and numerical analysis.
A field experiment was conducted on a soil where habitual zinc deficiency has been observed, to investigate the effectiveness of two forms of zinc containing fertilizers: zinc enriched fused phosphate and zinc enriched compound fertilizer. The result of present study is summarized as following. 1. The sail used for the study contained relatively large amount of 1N $CH_2COONH_4$ extractable Ca and the pH was 7.03. Available Zn extracted by 0.1 HCl and available $SiO_2$ extracted by NaOAc were 3.35 ppm and 67.7 ppm respectively. 2. In control plots Zinc content of rice plant measured at 20 days after transplanting was 22-23 ppm, which was a little higher than the critical level (20ppm). But at harvesting stage it dropped to 15ppm. 3. The ratios of $P_2O_5/Zn$ and N/Zn tended to lower as the zinc applied to the soil increased. 4. Application of Zinc clearly increased the number of tillers and plant height as compared to the control. It was also observed that the plots received znic headed and matured earlier compared to the control plots by two weeks. 5. Application of zinc increased all of the yield components and the yield of rice. However, there were no statistical differences in yield and yield components among the forms and levels of zinc fertilizers.
Three differing sandstones, two synthetic and one field sample, have been tested ultrasonically under a range of confining pressures and pore pressures representative of in-situ reservoir pressures. These sandstones include: a synthetic sandstone with calcite intergranular cement produced using the CSIRO Calcite In-situ Precipitation Process (CIPS); a synthetic sandstone with silica intergranular cement; and a core sample from the Otway Basin Waarre Formation, Boggy Creek 1 well, from the target lithology for a trial $CO_2$ pilot project. Initial testing was carried on the cores at "room-dried" conditions, with confining pressures up to 65 MPa in steps of 5 MPa. All cores were then flooded with $CO_2$, initially in the gas phase at 6 MPa, $22^{\circ}C$, then with liquid-phase $CO_2$ at a temperature of $22^{\circ}C$ and pressures from 7 MPa to 17 MPa in steps of 5 MPa. Confining pressures varied from 10 MPa to 65 MPa. Ultrasonic waveforms for both P- and S-waves were recorded at each effective pressure increment. Velocity versus effective pressure responses were calculated from the experimental data for both P- and S-waves. Attenuations $(1/Q_p)$ were calculated from the waveform data using spectral ratio methods. Theoretical calculations of velocity as a function of effective pressure for each sandstone were made using the $CO_2$ pressure-density and $CO_2$ bulk modulus-pressure phase diagrams and Gassmann effective medium theory. Flooding the cores with gaseous phase $CO_2$ produced negligible change in velocity-effective stress relationships compared to the dry state (air saturated). Flooding with liquid-phase $CO_2$ at various pore pressures lowered velocities by approximately 8% on average compared to the air-saturated state. Attenuations increased with liquid-phase $CO_2$ flooding compared to the air-saturated case. Experimental data agreed with the Gassmann calculations at high effective pressures. The "critical" effective pressure, at which agreement with theory occurred, varied with sandstone type. Discrepancies are thought to be due to differing micro-crack populations in the microstructure of each sandstone type. The agreement with theory at high effective pressures is significant and gives some confidence in predicting seismic behaviour under field conditions when $CO_2$ is injected.
Water quality of effluent from wastewater treatment plants (WWTPS) was reviewed to examine the feasibility of agricultural reuse using USEPA and WHO guidelines. It might meet the guidelines for BOD and SS, however, the most critical microbiological concentration was too high and further treatment is required. The pilot study of three treatments were performed to reduce microbiological concentrations. The UV irradiation was proved to be very effective in disinfection of secondary level effluent, and about 30 mW ${\cdot}$ s/$cm^2$ of dose was suggested to meet the even most stringent USEPA guidelines. Slow sand filter demonstrated effective removal of bacteria, and effluent concentration of total coliform (TC), fecal coliform (FC), and E. coli. dropped from about 10,000/100 mL to 300, 200, and 150 MPN/100 mL, respectively, showing over 95% removal. These level of bacterial concentration sufficiently meet the WHO guidelines ($10^3\;{\sim}\;10^5$ FC/100 mL), and could meet the more stringent USEPA guidelines (200 FC/100 mL) if properly applied. Slow sand filter also provided about 50% removal of SS, turbidity, and BOD in addition to bacterial removal. The removal efficiency of pond system was relatively poor, but still showed over 85% removal and effluent concentration of TC, FC, and E. coli was all below 10,000/100 mL. The pond system alone could meet the WHO guidelines, but hardly meet the USEPA guidelines and further treatment might be necessary. Overall, three methods evaluated in the study treat the effluent to meet the WHO microbiological guidelines for agricultural reuse. The UV disinfection and slow sand filter might also could the USEPA guidelines, while the pond system can hardly meet the USEPA guidelines if applied alone. The WHO and USEPA guidelines were made based on data from upland field agricultural system and may not be directly applicable to the paddy field agricultural system. Therefore, national standards for agricultural reuse of reclaimed water should be made considering domestic agricultural systems as well as international guidelines. Also, further investigation is recommended to develop optimum and feasible treatment measures for agricultural reuse of effluent from WWTPs.
Some preliminary studies were conducted to find out whether the levee-burning could justifiable for the suppression of insect pests, particularly the smaller brown planthopper (Laodelphax striatellus F.). Density surveys on pests and their enemies (mostly spiders) were carried out upto the mid May at an experimental paddy field located in Suwon after of it's levee $(72\times1m)$ was burned on Feb. 20, 1987. Results were discussed in relation to density recovering of both pests and their possible enemies (spiders) and summarized as below. Not a single individual of any pest or enemy was found from the levee upto sometime after the levee-burning. Grasses started to grow more vigorously in burned ares than in unburned upto about 60 days after the burning. And densities of both pest and enemies grew higher in burned areas than in unburned from about 75 days after the burning (in Early may). It is suspected that all individuals of pests and enemies fond from the burned areas could have immigrated from the surrounding areas. If levee-burning was carried out in much wider areas, much longer time would be needed to recover the density of both pests and enemies to the center region of the burning. Wingless spiders would require even longer time than winged pest species to re-establish in the center region of the widely burned field. Pirata subpiraticus, the most abundant spider species in Korean paddy fields, starts to move about and searches for food at above $9^{\circ}C$ which is somewhat lower than the critical temperature for the pest species. Thus P. subpiraticus would require more food than other pest species early in the spring, and therefore, it would have lower probability to survive than pest species particularly in burned areas. Experiments for pest suppression with levee-burning would better be carried on in much wider areas, and its justification seems to be discussed after man other disciplines related to both pests and their natural enemies were throughly studied together with their density surveys. However, according to the present point of vie, the opinion that levee-burning is helpful for controlling pests which over winter on levee areas could not be justifiable.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.