• Title/Summary/Keyword: cost-schedule data

Search Result 189, Processing Time 0.022 seconds

INTRA-AND INTERGOVERNMENTAL INFORMATION SYSTEM TO MANAGE INFORMATION IN URBAN RENEWAL PROJECT

  • Dong-bum Kim;Jin-Won Kim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.561-566
    • /
    • 2011
  • In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.

  • PDF

Development of Nursing Costs by Nursing Activities in Clinical Nurse Specialist (전문간호사 간호행위에 관한 간호수가체계 개발)

  • Kim, Yoon-Hee;Lee, Hyang-Yeon;Han, Sang-Sook;Shin, Hye-Sook;Lee, Myung-Hee;Kim, Sook-Neoung;Lee, Hye-Jin;Kim, Hye-Sook;Choi, Hyes-Sun
    • Journal of East-West Nursing Research
    • /
    • v.13 no.2
    • /
    • pp.197-207
    • /
    • 2007
  • Purpose: This study was carried out to deveop nursing costs and to substantiate the application of appropriate activity-based nursing costs for the current clinical nurse specialists. Method: The study sample was a group of 8 home health care team of the tirtiary Hospital in Korea. The data was collected from September 2003 through December 2004. The statistical analysis was done by SPSS PC 11.0 program and calculated mean and the standard deviation. In Lee(2003)'s nursing activity analysis, nursing activities were classified into two major classification, 19 domains and 70 activities. Each activities was calculated using its work validity, physical effort, psychological effort, stress as a intensity, and the necessary time. The simple work costs was calculated the work wage per minute and the necessary time. The work load intensity was calculated using the work wage per minute and the necessary time work load intensity/100. Results: In this study, the work wage was 283 won per minute. The work validity ranged from 2.71-4.00. The highest simple work cost/work load intensity cost was 12,735won/47,374won for research activity, 10,700won/27,499won for bedsore care, and 9,727won/35,114won for deathbed care. The lowest simple work cost/work load intensity cost was 2,123won/2,038won for intramuscular injection, 2,210won/2,166won for hypodermic injection, and 2,210won/1,547won for a application of medicine(or ointment or cream). Conclusions: It revealed that the nursing cost should be considered validity, physical effort, psychological effort, stress as a intensity, and necessary time. Therefore, It is necessary to calculate nursing cost systematically based on activities.

  • PDF

Determination of Base Capacity Values for Short-Term Freeway Work Zone (고속도로 단기공사구간 기본용량 결정에 관한 연구)

  • Kim, Sang Gu;Hong, Gil Seong
    • Journal of Korean Society of Transportation
    • /
    • v.31 no.1
    • /
    • pp.37-46
    • /
    • 2013
  • Lane closure in freeway work zone due to maintenance and repair of freeway facilities results in abrupt change of traffic flow. Sudden change of traffic flow results strong interactions among vehicles, and reduces capacity compared to the ordinary traffic condition. Such capacity reduction is likely to cause congestion, traffic queues, and economic loss cost. This study aims to determine the base capacity for a short-term freeway work zone that can be used to establish a work zone schedule in advance without any traffic impact. First, the research collected detector data and schedule data of road works on all freeways in Korea. Second, the research determined 23 study sites finding the capacity values of work zone after matching two kinds of data. All study sites had varying characteristics regarding traffic flow being adjacent to work zone during road works. The capacity values were reviewed in terms of lane closure configuration, the types of work, and design speed. Finally, research proposed capacity values for a short-term freeway work zone with the design speeds of 100 kph, 120 kph and 1,700 pcphpl, 1,750 pcphpl, respectively.

The Effect of Task Interdependence and User Participation on Software Development Project Performance (업무상호의존성과 사용자참여가 소프트웨어 개발 프로젝트 성과에 미치는 영향)

  • Hong Myung-Hon;Kim Shinkon;Kim Jeonggon
    • Journal of Information Technology Applications and Management
    • /
    • v.12 no.1
    • /
    • pp.213-229
    • /
    • 2005
  • Cost overrun or schedule delay of the software development project happens frequently despite that software developers continue to make every effort for the effective management of the projects. Previous researches have ascertained that these problems are ascribed to the uncertainty of projects and the improper management of the projects. The purposes of this research are to investigate the impacts of user participation and task interdependence on the performance of the projects and also to find out the appropriate project management method to improve the project performance. Even though the model fitness of the path model is proved to be very high, the verification of the hypotheses showed a variety of results including the four verifications and the one refutation of the hypotheses as well as the suggestion of one alternative hypothesis. The contribution of this research is that the integration model is proposed and verified, comprising the relationship among the user participation, the task interdependence, and the performance of software development projects. A project manager can utilize the implication of this research for an effective management of software development project.

  • PDF

Estimating Relative Risk Level of Construction Work (건설공사 상대적 위험도 산정)

  • Son, Ki-Sang;Yang, Hak-Soo;Gal, Won-Mo
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.53-59
    • /
    • 2006
  • Standard safety management costs can not be applied to each site with same rate, it is very difficult, because it depends on the experience, work method, work kind, work progress schedule, and hazard level of each construction company. Therefore, this study is to find out hazard level of each work kinds through questionnaire and interview and investigate analyze the status which standard safety management costs have been used. Also, this study is to show reasonable rates of standard safety management costs in construction industry and to set up countermeasures against those problem after reviewing its status in korea with in Japan and Europe. The domestic system of standard safety management costs is not considered in the foreign country, while only related subjective items have been investigated and evaluated for this study. This study is to investigate eleven project kinds of domestic system, first, and to investigate eleven items of apartment bldg, office, civil work such as bridge, tunnel, dam, plant etc, secondly. Additionally, three items of gymnasium, railway, particular steel tower are investigated in this study. Also this study is to investigate and analyze performed costs of presently processing worker finished work so that it shows a new reasonable rate against standard safety management costs in construction industry, in order to make basial data and material to be systemized.

Development of Construction Benchmarking for Oversea Industrial Projects (해외플랜트 공사 벤치마킹 프로그램 개발)

  • Park, Hee-Sung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1165-1171
    • /
    • 2013
  • The oversea construction contract amount has sharply increased since 2003. The contractor's capability for EPC and project management is a key factor for a successful industrial construction project. Construction performance measurement and evaluation is needed to improve contractor's project management capability. Therefore, this paper proposes the construction performance benchmarking program for oversea industrial projects. Performance metrics consists of project cost, schedule, quality, and safety. Data from 10 oversea industrial projects were collected and analyzed. Also, this paper describes the process for development of the benchmarking program and lessons learned from industry are summarized. Finally, this paper recommends how sustainable benchmarking program should be established and implemented.

A calculation method on the loss of labor productivity due to change orders (설계변경으로 인한 작업 생산성 손실 산정방법)

  • Jeon Yong-Deok;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.295-300
    • /
    • 2001
  • Additional costs as well as schedule delay are occurred due to change orders in today's construction projects. Additional costs, overhead calculation methods are of various types. In a foreign country cases, many claims related to the loss of labor productivity quote research statistics data. In domestic cases, the study of the reason why the loss of labor productivity occurs and its effect have not been performed. Therefore, this paper analyzes factors affecting lost productivity and a methodology is presented to estimate the lost productivity.

  • PDF

Facilitating the Usage of Value Management Processes by Charactering Capital Facility Projects

  • Cha Hee Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.144-152
    • /
    • 2004
  • Defining value as a measure of how well the project value objectives are met, Value Management Process (VMP) is considered to be any management effort or process that can proactively pursue one or more project objectives (i.e., security/safety, cost effectiveness, schedule optimization, and risk containment). The collection of 44 VMPs has been established based on a rigorous effort conducted by Construction Industry Institute (CII). Because varying circumstances on each project determine the level of suitability, it is crucial to identify which VMP should be implemented on a particular project. The current VMP selection process is primarily based on human intuition. The main objective of this paper is to provide a systematic method to facilitate the usage of VMPs on a particular project. This paper identified and quantified the selection principles (i.e., targeted value objectives, timing of initiation, project characteristics, and relative impact). The data collected from industry practitioners and VMP experts characterized each VMP in terms of the magnitude of benefit. An automated selection tool by Visual Basic Application (VBA) on MS Excel TM, was developed and proved its validity. As a pioneering study, this paper provides a comprehensive and structured knowledge on the subject of VMPs. From the industry's perspective, the automated selection tool, the premier of this study, contributes the facilitation of the VMP implementations in the construction industry thereby maximizing the potential benefits to a particular project.

Correlation Analysis between Delay and Turnaround Time at Jeju International Airport (제주국제공항의 지연과 Turnaround Time 간의 상관관계 분석)

  • Lee, Choongsub;Kim, Dongsin;Kim, Hyewook;Baik, Hojong
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.30 no.1
    • /
    • pp.1-11
    • /
    • 2022
  • The capacity of Jeju International Airport has reached its limit due to a surge in air traffic demand such as passengers and cargo and the continuous expansion of Low Cost Carriers (LCC). Despite COVID-19 that has began in November 2019, Jeju International Airport still has continuous demand in terms of passenger and cargo transportation. As a result, it is undeniable that the delay rate also unexpectedly increased as the air traffic volume at Jeju International Airport continued to increase. In this study, the correlation between Turnaround Time and delay rates of national airlines is analyzed based on past flight data at Jeju International Airport, and the cumulative delay time trend for sampled airlines is compared with Turnaround Time. Through this study, it is expected to contribute to securing aircraft operation efficiency and on-time by analyzing delays related to Turnaround Time at Jeju International Airport.

A Study of Development Schedule Estimation Based on Development Type (소프트웨어 개발형태 기반 개발기간 추정 연구)

  • Park Seok-Gyu;Kim Woon-Yong
    • Journal of the Korea Computer Industry Society
    • /
    • v.7 no.3
    • /
    • pp.191-198
    • /
    • 2006
  • Area of software measurement is active more than thirty years. There is a huge collection of researches but still no concrete software development effort, duration and cost estimation model. The data sets used to conduct previous studies in the duration estimation model are often small and not too recent, these types of models should not be apply in recent projects that have complex architecture and various development environment. Therefore, Oligny et al. presents empirical models that predict software project duration in accordance with project platform based on project effort using the log data transformation. These models are based on the analysis of 396 project data provided by release 4 of the ISBSG Benchmark. Applying Oligny et al.'s models to 534 project data provided release 6 of the ISBSG Benchmark, the project duration is affected by development type more than development platform. Therefore, This paper presents the model of duration estimation according to development type. This paper proves the duration is more affected by development type than development platform. And, The model according to development type is more adequate for duration estimation.

  • PDF