• Title/Summary/Keyword: cost-analysis system

검색결과 4,367건 처리시간 0.032초

System model reduction by weighted component cost analysis

  • Kim, Jae-Hoon;Skelton, Robert-E.
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1993년도 한국자동제어학술회의논문집(국제학술편); Seoul National University, Seoul; 20-22 Oct. 1993
    • /
    • pp.524-529
    • /
    • 1993
  • Component Cost Analysis considers any given system driven by a white noise process as an interconnection of different components, and assigns a metric called "component cost" to each component. These component costs measure the contribution of each component to a predefined quadratic cost function. One possible use of component costs is for model reduction by deleting those components that have the smallest component cost. The theory of Component Cost Analysis is extended to include finite-bandwidth colored noises. The results also apply when actuators have dynamics of their own. When the dynamics of this input are added to the plant, which is to be reduced by CCA, the algorithm for model reduction process will be called Weighted Component Cost Analysis (WCCA). Closed-form analytical expressions of component costs for continuous time case, are also derived for a mechanical system described by its modal data. This is very useful to compute the modal costs of very high order systems beyond Lyapunov solvable dimension. A numerical example for NASA's MINIMAST system is presented.presented.

  • PDF

Relationship of Ceramic Insulation Panel System Development and Verification of LCC

  • Han, Min-Cheol;Jeon, Kyu-Nam;Lee, Gun-Cheol;Kim, Tae-Hui
    • 한국건축시공학회지
    • /
    • 제12권4호
    • /
    • pp.386-392
    • /
    • 2012
  • In this study, life cycle cost (LCC) is analyzed according to insulation panel system type using a deterministic LCC analysis method. Through this analysis, it was found that the construction cost in the deterministic LCC analysis for Ceramic panels was low compared to the construction cost for metal and stone panels. Also, the difference in cost between the Ceramic panel and the metal panel was about 2 times. In the area of maintenance cost, it was found to be similar to the previously analyzed construction cost, in which the metal panel has the highest cost due to the high cost of construction and the frequent need for maintenance. In the case of the stone panel, a small difference in cost is shown compared with that of the Ceramic panel, but the cost is higher than the Ceramic panel. Regarding the cost of waste disposal, the Ceramic panel can reduce the cost by at least 1.5 times and up to 2 times compared to other panel systems. Finally, in the analysis of sensitivity according to changes in discount rates, the Ceramic panel and metal panel systems have a similar cost, and the cost of the metal panel is a bit larger than that of other panel systems. Thus, in the subjects used in the analysis, the Ceramic panel system shows the highest economic benefits.

의사 결정자를 위한 HVAC 시스템의 LCC 분석 방법론 개발에 관한 연구 (A Study on the Development of Life Cycle Cost Analysis Methodology in HVAC system for Decision Maker)

  • 정순성
    • 한국태양에너지학회 논문집
    • /
    • 제24권4호
    • /
    • pp.55-63
    • /
    • 2004
  • The purpose of this study is to development of life cycle cost analysis methodology of HVAC system for decision maker. The results of this study are as follows; maintenance/management, equipment construction, planning/design, and demolition/sell phases (1) To develop the cost breakdown structure for LCC in HVAC system, this study apply the method of additional pertinent level, title, CBS number, block number and variable index. (2) LCC analysis order of HVAC system compose four phase. (3) Life cycle costing influence diagram can bring us to make the most efficient decision through a visual graphical diagram that is shown relationship among variables and that decision maker traces easily from life cycle cost analysis situation.

캘리포니아 표준 테스트 방법을 사용한 압전 발판의 경제성 분석 (Economic Analysis of the Piezoelectric Power using the California Standard Test)

  • 정순성
    • 동력기계공학회지
    • /
    • 제21권4호
    • /
    • pp.51-56
    • /
    • 2017
  • The purpose of this study is to suggest economic analysis for piezoelectric power. Economic analysis method uses california standard test. Perspectives of california standard test is participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. This study identifies the cost and benefit components. This study identifies benefit-cost calculation procedures from four test : participant test, ratepayer impact measure test, program administrator cost test and total resource cost test. In the economic analysis, the order of benefit cost ratio in piezoelectric power shows total resource cost test, program administrator cost test, ratepayer impact measure test and participant test.

적외선 검출기 개발가능성 및 대안 분석 연구 (A Study on Feasibility Analysis and Alternatives for Infrared Detector Development)

  • 김경수;민성기;김철환
    • 시스템엔지니어링워크숍
    • /
    • 통권4호
    • /
    • pp.123-134
    • /
    • 2004
  • This paper deals with the feasibility analysis and alternatives for infrared detector development. The purpose of this paper analyze development requirement and feasibility study in both technology and cost. We get raw input data for system engineering process from development and technical expert, and then analyze cost and technology for development feasibility, and alternative study. Infrared Detector is core component of Thermal Imaging System and developed by ADD from 2006 to 2008 year. Technical level is analyzed by TRL(Technical Readiness Level) and AOA(Analysis of Alternative) is done by development and production cost estimate. We use SEER-H tool for cost estimate, that is parametric cost estimate tool based on Knowledge Base. Also this paper presents risk analysis for project management because it is necessary to risk driver management during the infrared detector development. The result of IR Detector feasibility and alternative study will be used in technical and cost analysis. This study can help those who are related to the cost analysis and development feasibility of other weapons

  • PDF

LCC 분석을 이용한 중앙공급식 공동주택의 수축열식 지열원 히트펌프시스템의 적용연구 (Application study of heat storage type GSHP system in Apartment building with central cooling and heating facilities using life cycle cost analysis)

  • 이상훈;박종우;조성환
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.1497-1502
    • /
    • 2009
  • The present study has been conducted economic analysis of heat storage type ground source heat pump system(HSGSHP) and normal ground source heat pump (GSHP) and central boiler system with individual air conditioning facility which are installed at the same building in the shared an apartment house. Cost items, such as initial construction cost, annual energy cost and maintenance cost of each system are considered to analyze life cycle cost (LCC) and simple payback period (SPP) with initial cost different are compared. The initial cost is a rule to the Government basic unit cost of production. LCC applied present value method is used to assess economical profit of both of them. Variables used to LCC analysis are prices escalation rate and interest rate mean values of during latest 10 years. The LCC result shows that HSGSHP (1,351,000,000won) is more profitable than central boiler system with individual air conditioning facility by 86.7% initial cost. And SPP appeared 8.0 year overcome the different initial cost by different annual energy cost.

  • PDF

설계.시공일괄입찰공사 및 대안입찰공사의 생애주기비용 분석 및 평가체계 개선방향 (Improvement Directions for Life Cycle Cost Analysis and Evaluation in the Design-Build and Alternative Bidding Projects)

  • 강태경;이유섭
    • 한국건축시공학회지
    • /
    • 제8권1호
    • /
    • pp.97-102
    • /
    • 2008
  • The report of the Korean Board of Audit and Inspection(BAI) on May 2007 indicates the problems of Life Cycle Cost (LCC) analysis and evaluation in the Design-Build(Turn-Key) and alternative bidding system. The point which the report indicates is that the cost estimation system for LCC analysis has nothing in common each other and there's no consistency among the repair cycle and ratio per facilities parts. For solving these problems, BAI demands the establishment of the guidelines for LCC analysis and evaluation from the competent authority Korean Ministry of Construction And Transportation(MOCT). The objective of this study is to develop the improvement directions for LCC analysis and evaluation which are suitable to the public construction projects especially for the Design-Build and alternative bidding system in Korea. For this study, the LCC related raws and regulations, LCC analysis guidelines of public cooperations, actual condition of LCC analysis and evaluation which include, the elements of LCC, the estimation rules of the initial cost and the maintenance cost, the analysis standards of time value of money, etc. are investigated to provide the improvement directions for LCC analysis and evaluation.

공공건물 건축설비 갱신 계획시 비용-효율분석 평가기준에 관한 연구 (Evaluation Standard of Cost-Effectiveness Analysis for Renew of Architectural Equipment in Public Building)

  • 정순성
    • 동력기계공학회지
    • /
    • 제17권4호
    • /
    • pp.131-138
    • /
    • 2013
  • The purpose of this study is to suggest the evaluation standard of cost-effectiveness analysis for renew of architectural equipment in public building. Evaluation items of cost-effectiveness analysis for renew of architectural equipment in public building were used life cycle cost, energy consumption(ton of oil equivalent), green house gas emissions(ton of carbon dioxide) and maximum power demand. Life cycle cost is the process of making an economic assessment of an item, area, system, or facility by considering all significant costs of ownership over an economic life, expressed in terms of equivalent costs. The essence of life cycle costing is the analysis of equivalent costs of various alternative proposals. The social concern with green house gas and maximum power demand of architectural equipment field has been growing for the last several years.

웹 기반 VE Cost모델 분석 시스템의 개념적 모형 (A Conceptual Model of Web-based VE Cost Model Analysis System)

  • 이창홍;오치돈;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.416-419
    • /
    • 2007
  • 국내의경우, 초기 Cost모델 작성을 위한 비용관련 정보의 축적이 체계적으로 이루어지지 않고, 과거에 수행된 유사 프로젝트의 실적데이터에 대한 정보가 부족해 주 기능 대비 비용에 대한 효용성을 명확히 판단하기 어려워 신뢰할 수 있는 대상선정이 이루어지지 않고 있다. 따라서, 본 연구는 과거 수행된 유사 프로젝트의 비용 정보를 축적, 공유, 활용, 학습할 수 있고, VE활동의 대상선정을 위해 준비단계에서 수행되는 Cost모델의 체계적이고 효율적 분석이 가능한 웹기반 'Cost 모델 분석 시스템(Cost Model Analysis System: CMAS)'의 개념적 모형을 제시하고자 한다. 본 연구에서 제시한 Cost모델 분석 시스템의 개념적 모형을 활용하여 실질적인 시스템이 구축된다면 효과적인 VE 수행을 위한 합리적이고 신뢰성 있는 대상선정이 이루어질 것으로 판단된다.

  • PDF

각종지원금제도에 의한 냉열원시스템의 라이프 사이클 코스트 분석 (Life Cycle Cost Analysis of Primary Cooling System by Systematic Support Cost)

  • 김종민;정순성;최창호
    • 한국태양에너지학회 논문집
    • /
    • 제22권4호
    • /
    • pp.97-106
    • /
    • 2002
  • The purpose of this study is to analyze the life cycle cost of primary cooling system by systematic support cost. Life Cycle Cost(LCC) is the process of making an economic assessment of an item, area, system, or facility by considering all significant costs of ownership over an economic life, expressed in terms of equivalent costs. The essence of life cycle costing is the analysis of equivalent costs of various alternative proposals. In order to select economical primary cooling system in early heat source plan stages, the research investigates cost items and cost characteristics during project process phases such as planning/design, construction, maintenance /management, and demolition/sell phases. The study also analyze the life cycle cost by capacity leading to suggest the most economical primary cooling system by systematic support cost.