에너지 다소비형 건물 축냉 시스템의 경제성에 관한 연구 (The Study of Economical Efficiency for the Ice Storage System of more Energy Consumption Building)

  • 이제묘
    • 설비공학논문집
    • /
    • 제24권10호
    • /
    • pp.733-738
    • /
    • 2012
  • It is important issue to reduce the electric energy to save the operating cost of HVAC system. Even if electrical energy is the clean energy, it is difficult and takes high cost for storage of electricity. These cause the high peak load of electric energy for HVAC in summer season. In korea, government impose the electric charge with several grade for the purpose of cut-off the peak load of electricity. Government has a policy to support to design and install the heat/ice storage system using midnight electricity. In this study, analysis of cooling load and operating characteristics for ice storage system are performed. And, also economical efficiency is compared between ordinary charge system of electricity and midnight rate charge of electricity. The systematic and economical supports are needed for expansion of usage of energy saving equipments.

부하패턴을 이용한 전력시장 정보의 불완비성 추정에 관한 연구 (The Estimation of Incomplete Information in Electricity Markets by Using Load Pattern Changes)

  • 신재홍;이광호
    • 전기학회논문지
    • /
    • 제56권5호
    • /
    • pp.848-853
    • /
    • 2007
  • This paper presents a methodology of estimating incomplete information in electricity markets for analyzing the gaming behavior of Generating Companies (GENCOs). Each GENCO needs to model its opponents' unknown information of strategic biddings and cost functions. In electricity markets with complete information, each GENCO knows its rivals' payoff functions and tries to maximize its own profit at Nash equilibriurnl Nli) by acknowledging the rivals' cost function. On the other hand, in the incomplete information markets, each GENCO lacks information about its rivals. Load patterns can change continuously due to many factors such as weather, price, contingency, etc. In this paper, we propose the method of the estimation of the opponents' cost function using market price, transaction quantities. and customer load patterns. A numerical example with two GENCOs is illustrated to show the basic idea and effectiveness of the proposed methodology.

RELIABLE ROLE OF NUCLEAR POWER GENERATION UNDER CO2 EMISSION CONSTRAINTS

  • Lee, Young-Eal;Jung, Young-Beom
    • Nuclear Engineering and Technology
    • /
    • 제39권5호
    • /
    • pp.655-662
    • /
    • 2007
  • Most decision makers in the electricity industry plan their electric power expansion program by considering only a least cost operation, even when circumstances change with differing complexities. It is necessary, however, to analyze a long-term power expansion plan from various points of view, such as environmental friendliness, benefit of a carbon reduction, and system reliability, as well as least cost operation. The objective and approach of this study is to analyze the proper role of nuclear power in a long-term expansion plan by comparing different scenarios in terms of the system cost changes, $CO_2$ emission reduction, and system reliability in relation to the Business-As-Usual (BAU). The conclusion of this paper makes it clear that the Korean government cannot but expand the nationwide nuclear power program, because an increased energy demand is inevitable and other energy resources will not provide an adequate solution from an economic and sustainability point of view. The results of this analysis will help the Korean government in its long-term resource planning of what kinds of role each electric resource can play in terms of a triangular dilemma involving economics, environmental friendliness, and a stable supply of electricity.

전력소비자 수요관리용 전지전력저장시스템의 적정 가격 산정 (Estimation of Reasonable Price of Battery Energy Storage System for Electricity Customers Demand Management)

  • 김슬기;조경희;김종율;김응상
    • 전기학회논문지
    • /
    • 제62권10호
    • /
    • pp.1390-1396
    • /
    • 2013
  • The paper estimated the reasonable market price of lead-acid battery energy storage system (BESS) intended for demand management of electricity customers. As time-of-use (TOU) tariffs have extended to a larger number of customers and gaps in the peak and off-peak rates have gradually risen, deployment of BESS has been highly needed. However, immature engineering techniques, lack of field experiences and high initial investment cost have been barriers to opening up ESS markets. This paper assessed electricity cost that BESS operation could save for customers and, based on the possible cost savings, estimated reasonable prices at which BESSs could become a more prospective option for demand management of customers. Battery scheduling was optimized to maximize the electricity cost savings that BESS would possibly achieve under TOU tariffs conditions. Basic economic factors such as payback period and return on investment were calculated to determine reasonable market prices. Actual load data of 12 industrial customers were used for case studies.

배전기자재별 고장확률을 고려한 배편계통 수용가 정전비용 산출 기법 (Evaluation Methodology of System Interruption Cost Taking into Consideration Failure Rate of Distribution Facilities)

  • 최상봉;김대경;정성환
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제51권5호
    • /
    • pp.232-237
    • /
    • 2002
  • It is increased for methodology to evaluate distribution power system interruption cost in power supply zones under competitive electricity market. This paper presents algorithms to evaluate system interruption cost in distribution power supply zones taking into consideration failure rate of distribution facilities and composite customer interruption cost. In this paper, it is introduced for weighting factor for each customer failure duration and failure rate of distribution facilities to evaluate reasonable system interruption cost in distribution power supply area. Also, this Paper estimates evaluation results of system interruption cost using a sample model system. Finally, evaluation results of system interruption cost based on failure rate of distribution facilities and composite customer interruption cost are shown in detail.

전력수급기본계획의 불확실성과 CO2 배출 목표를 고려한 발전용 천연가스 장기전망과 대책 (Scenario Analysis of Natural Gas Demand for Electricity Generation in Korea)

  • 박종배;노재형
    • 전기학회논문지
    • /
    • 제63권11호
    • /
    • pp.1503-1510
    • /
    • 2014
  • This study organizes scenarios on the power supply plans and electricity load forecasts considering their uncertainties and estimates natural gas quantity for electricity generation, total electricity supply cost and air pollutant emission of each scenario. Also the analysis is performed to check the properness of government's natural gas demand forecast and the possibility of achieving the government's CO2 emission target with the current plan and other scenarios. In result, no scenario satisfies the government's CO2 emission target and the natural gas demand could be doubled to the government's forecast. As under-forecast of natural gas demand has caused the increased natural gas procurement cost, it is required to consider uncertainties of power plant construction plan and electricity demand forecast in forecasting the natural gas demand. In addition, it is found that CO2 emission target could be achieved by enlarging natural gas use and demand-side management without big increase of total costs.

DSM 프로그램의 비용효과 분석 (A Benefit-Cost Analysis on the DSM Programs)

  • 오영진;김발호;박종배
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제52권9호
    • /
    • pp.535-541
    • /
    • 2003
  • Demand Side Management (DSM) activities have been designed to encourage customers to modify their patterns of electricity consumption including the timing and level of electricity demand. The role of DSM has been more and more important in the point of social energy utilization on the limited resources. The objectives of DSM are generally related to load reductions and generation cost savings. This paper presents an approach to B/C analysis to evaluate the impact of DSM programs especially on the strategic conservation and the load management programs. The proposed approach embedding the existing B/C analyses is applicable to the new electricity market. Case studies show the B/C ratio and the avoided cost due to the impact of DSM programs.

예비축전지를 갖는 배전계통 전압강하의 비용최적 설계 (An optimal design guideline for voltage drop of DC distribution system with batteries)

  • 조일권;김만고
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1994년도 추계학술대회 논문집 학회본부
    • /
    • pp.400-402
    • /
    • 1994
  • The voltage drop in distribution path of battery-reserved DC power system can affect the total of battery, cable and electricity costs. To determine an optimum voltage drop in distribution path for minimizing the total cost, battery, cable and electricity costs are represented as a function of the voltage drop, respectively, and are summed up to the total cost. An optimum voltage drop is selected as the value giving the minimum total cost. In this paper, a design technique of optimum voltage drop in distribution path of DC power system is proposed to minimize the total of battery, cable and electricity costs. The design procedure is described and design curve for selecting optimum voltage drop is also presented as a function of distribution distance.

  • PDF

Group Building Based Power Consumption Scheduling for the Electricity Cost Minimization with Peak Load Reduction

  • Oh, Eunsung;Park, Jong-Bae;Son, Sung-Yong
    • Journal of Electrical Engineering and Technology
    • /
    • 제9권6호
    • /
    • pp.1843-1850
    • /
    • 2014
  • In this paper, we investigate a group building based power consumption scheduling to minimize the electricity cost. We consider the demand shift to reduce the peak load and suggest the compensation function reflecting the relationship between the change of the building demand and the occupants' comfort. Using that, the electricity cost minimization problem satisfied the convexity is formulated, and the optimal power consumption scheduling algorithm is proposed based on the iterative method. Extensive simulations show that the proposed algorithm achieves the group management gain compared to the individual building operation by increasing the degree of freedom for the operation.

하수처리시설의 에너지 자립화 방안 연구 (Study on Energy Independence Plan for Sewage Treatment Plant)

  • 김영준;정철권;강용태
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2008년도 동계학술발표대회 논문집
    • /
    • pp.15-20
    • /
    • 2008
  • The objectives of this study are to analyze the energy independence plan and to propose a suitable sewage treatment plant in Korea. The total amount of electricity consumption for public sewage treatment plant was estimated as 1,182 GWh in 2007. It was estimated that total 16 sewage treatment plants with renewable energy systems produced electricity of 15.2 GWh per year, which could replaced 0.8% of total electricity used for sewage treatment. It was found that domestic sewage treatment plants with power generation plants by digestion gas were installed in 7 places and produced electricity of 13 GWh per year. It was also found that the power generation plants by digestion gas were the most cost-effective for sewage treatment out of the renewable energy systems based on the benefit-cost analysis.

  • PDF