• 제목/요약/키워드: cost items

검색결과 916건 처리시간 0.027초

고장을 고려한 공정평균 이동에 대한 조정시기 결정 (Determination of Resetting Time to the Process Mean Shift with Failure)

  • 이도경
    • 산업경영시스템학회지
    • /
    • 제42권4호
    • /
    • pp.145-152
    • /
    • 2019
  • All machines deteriorate in performance over time. The phenomenon that causes such performance degradation is called deterioration. Due to the deterioration, the process mean of the machine shifts, process variance increases due to the expansion of separate interval, and the failure rate of the machine increases. The maintenance model is a matter of determining the timing of preventive maintenance that minimizes the total cost per wear between the relation to the increasing production cost and the decreasing maintenance cost. The essential requirement of this model is that the preventive maintenance cost is less than the failure maintenance cost. In the process mean shift model, determining the resetting timing due to increasing production costs is the same as the maintenance model. In determining the timing of machine adjustments, there are two differences between the models. First, the process mean shift model excludes failure from the model. This model is limited to the period during the operation of the machine. Second, in the maintenance model, the production cost is set as a general function of the operating time. But in the process mean shift model, the production cost is set as a probability functions associated with the product. In the production system, the maintenance cost of the equipment and the production cost due to the non-confirming items and the quality loss cost are always occurring simultaneously. So it is reasonable that the failure and process mean shift should be dealt with at the same time in determining the maintenance time. This study proposes a model that integrates both of them. In order to reflect the actual production system more accurately, this integrated model includes the items of process variance function and the loss function according to wear level.

강박스교량 공사비 특성 분석 (Analysis on Characteristic of Construction Cost for Steel Box Bridge)

  • 선창원;경갑수;강신화;권순철
    • 한국강구조학회 논문집
    • /
    • 제21권1호
    • /
    • pp.1-14
    • /
    • 2009
  • 설계단계별 적정공사비를 산출하는 것은 건설공사의 효율적인 예산확보 및 집행에 있어서 중요한 이슈의 하나이다. 이러한 것을 고려하여 본 연구에서는 강교량 공사비 산출을 위한 기본자료 구축의 일환으로 기존 설계된 강교량의 수량 및 단가산출서, 내역 산출서 등의 설계내역서를 분석하여 강박스 교량의 기본적인 제원 특성 등을 조사하고자 한다. 또한 강박스교량의 예정가격 공사비 특성과 교량 공사 공종별과의 상관관계를 평가하는 것에 의해 향후 강교량 기획단계의 적정공사비 산정을 위한 기초자료를 제공하여 효율적이고 타당한 적정공사비 산정모델 구축을 위한 기본 자료를 제시하고자 한다. 이상의 연구 결과 전체 공사비에서 각 공종이 차지하는 비율 및 단위 공사비를 산출하였으며, 강교량 공사비의 영향요인을 도출하였다.

민간투자시설사업에 있어 총사업비 변경관리의 개선방안 연구 - 고속도로 민간투자시설사업을 중심으로 (A Study on the Improvement of Total Cost Change Control in Private Investment Projects)

  • 김세종;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.119-126
    • /
    • 2001
  • 국내에서 대규모로 진행되고 있는 민간투자사업의 시행에는 많은 난제들이 산재해 있으며, 특히, 민간의 창의와 효율성을 극대화하고자 $\lceil$사회간접자본시설에 대한 민간투자법$\rfloor$ 에 명시된 총사업비 사전확정 및 사후정산 금지규정은 사업비변경과 관련하여 정부와 사업시행자간 분쟁의 요소를 제공하고 있다. 본 연구에서는 민간투자사업의 총사업비 변경에 관련된 문제점들을 파악하고, 그의 개선을 위한 총사업비변경 관리방안을 사업관리요소인 계약·조직·정보·비용·공정관리의 틀로서 접근, 분석하였다. 계약관리의 측면에서 실시협약 관련조항의 표준안을 구축하고, 조직관리의 측면에서 업무범위를 명확화한 업무플로우를 수립하고자 하였다. 아올러 정보관리의 측면에서 설계서 변경관리의 효율화를 위한 도면, 문서관리시스템(DMIS)을 제안하고, 비용·공정관리의 측면에서 실공정과 일치되는 통합 내역관리방안을 제시하고자 하였다.

  • PDF

생산량이 감소하는 공정평균이동 문제에서 Cpm+ 기준의 손실함수를 적용한 보전모형 (A Maintenance Model Applying Loss Function Based on the Cpm+ in the Process Mean Shift Problem in Which the Production Volume Decreases)

  • 이도경
    • 산업경영시스템학회지
    • /
    • 제44권1호
    • /
    • pp.45-50
    • /
    • 2021
  • Machines and facilities are physically or chemically degenerated by continuous usage. The representative type of the degeneration is the wearing of tools, which results in the process mean shift. According to the increasing wear level, non-conforming products cost and quality loss cost are increasing simultaneously. Therefore, a preventive maintenance is necessary at some point. The problem of determining the maintenance period (or wear limit) which minimizes the total cost is called the 'process mean shift problem'. The total cost includes three items: maintenance cost (or adjustment cost), non-conforming cost due to the non-conforming products, and quality loss cost due to the difference between the process target value and the product characteristic value among the conforming products. In this study, we set the production volume as a decreasing function rather than a constant. Also we treat the process variance as a function to the increasing wear rather than a constant. To the quality loss function, we adopted the Cpm+, which is the left and right asymmetric process capability index based on the process target value. These can more reflect the production site. In this study, we presented a more extensive maintenance model compared to previous studies, by integrating the items mentioned above. The objective equation of this model is the total cost per unit wear. The determining variables are the wear limit and the initial process setting position that minimize the objective equation.

농어촌정비사업 공종별 실적공사비 적산시스템개발 (Development of Cost Estimate System Based on the Itemized Historical Data for Rural Improvement Projects)

  • 김현영;이정재;김영기;오상원;전효묵
    • 한국농공학회지
    • /
    • 제40권3호
    • /
    • pp.35-41
    • /
    • 1998
  • Cost estimate system Will be changed from the prime. cost calculation to the historical cost data because the present system has some problems. In this situation, each owner should prepare his own cost estimate system based on the historical cost data. In this study, the standard work items were classified and the criteria of their work amount computation were established for rural improvement projects. And also the historical cost data were collected in all range of rural improvement projects, and the database system, "HICOMS" (HIstorical COst data Management System) was built. In order to test the applicability of the HICOMS, standard work cost and contractor cost were compared. The results by HICOMS showed high significance and it was concluded that the HICOMS could be applicable for the cost estimate of the rural improvement projects. projects.

  • PDF

가정간호서비스에 대한 국내 비용분석 연구비교 (The Comparison of Cost Analysis Researches for the Home Care Nursing Service)

  • 임지영
    • 가정간호학회지
    • /
    • 제10권2호
    • /
    • pp.113-122
    • /
    • 2003
  • Purpose: This is a simple survey for discussion about cost analysis methodological issues in home care nursing service studies. Method: The subject of this study were articles published in Korea from 1961 to August, 2002, and searched by key word 'cost' and 'nursing' from various DB(National Assembly Library, The National Library of Korea, RICH etc). Finally, 13 articles were collected. Result: 1) The major type of cost analysis studies was a cost comparison or a simple cost study. 2) The important methodological weaknesses were as followers; (1) few studies were suggested cost analysis framework or analytic perspective, (2) it ,was not enough to describe for basis of selection of cost/effectiveness items, (3) few studies were done by sensitivity analysis. Conclusion: These above results will be used to develop a more proper cost analysis methodological framework in home care nursing services and also to contribute as a guideline for further studies.

  • PDF

도시 가로수 관리 품셈 개선에 관한 연구 (A Study on Improvement Methods of Cost Estimation in Order for the Proper Management of Street Trees)

  • 도윤택;한봉호;박석철
    • 한국조경학회지
    • /
    • 제50권4호
    • /
    • pp.20-36
    • /
    • 2022
  • 본 연구는 가로수 관리의 합리적인 표준품셈 항목 및 적정 단가 설정을 통한 고품질 가로수 관리의 기초자료 제공을 목적으로 하였다. 현재 가로수 관리항목은 가로수 전정을 제외하고, 일반 조경수 품셈을 가로수 관리 품셈으로 활용하고 있다. 또한 한국전력공사에서는 표준전기품셈의 가지치기 항목을 적용하여 표준품셈 대비 강전정의 경우 평균 51%, 약전정의 경우 평균 39% 낮은 단가로 사업을 수행하고 있다. 이는 가로수 관리 품질을 유지하거나 향상시킬 수 없는 한계로 판단되었으며, 가로수 관리의 적정 단가 기준이 필요함을 뜻한다. 가로수 관리 품셈을 개선하기 위해 현업에서 투입되는 비용을 검토할 필요가 있었다. 하지만 국내의 조경 분야 실적공사비에 대한 데이터의 부재로 미국 RSMeans Building Construction Cost Data(RSMeans)의 세부항목을 검토하였다. RSMeans란 1942년부터 누적된 미국의 실적기반 적산방식으로 주로 연방교통부와 각 주정부의 도로국을 중심으로 공사비를 산정하는 데이터베이스이다. RSMeans는 지속적인 신기술 도입과 노동 및 재료비용의 계속된 변경을 반영하기 위해 매해 건설제품과 방법을 찾고 수량화하며, 생산성 비율을 조정하고 있다. 본 연구에서는 국내 조경 관리 방법과 큰 차이가 없는 RSMeans의 세부항목과 현행 인건비 등을 적용하여 실적공사비를 산출하였다. 적용 결과 표준품셈은 실적공사비와 비교하면 가로수 전지의 강전정의 경우 107%로의 양호한 비율이었지만, 약전정은 59%로 과소 설계가 되어 있었다. 또한, 관목 전정은 82%, 제초는 92%, 교목 시비는 87%, 방풍벽 설치는 91% 수준으로 과소 설계되어 있었다. 살수차 관수와 약제 살포는 각각 118%와 124%의 비율로 실적공사비와 비교하면 과대 설계된 부분도 확인하였다. 과소평가된 항목들은 가로수의 특수성으로 도로 안전통제 등으로 인건비 및 장비의 투입비 상승이 주요 원인으로 판단되었다. 향후 표준품셈의 조경 유지 관리항목에 일반 조경수뿐만 아니라 가로수에 관한 항목 추가가 필요하다.

비정상적 수요를 갖는 품목들의 통합발주정책 (Joint Replenishment Policy for Items with Non-stationary Demands)

  • 양영현;김종수;김태영
    • 대한산업공학회지
    • /
    • 제38권2호
    • /
    • pp.116-124
    • /
    • 2012
  • This paper concerns a joint replenishment problem for a single buyer who sells multiple types of items to end-customers. The buyer periodically replenishes the inventory of each item to a preset order-up-to-level to satisfy the end customers' demands, which may be non-stationary. A joint replenishment policy characterized by variable order-up-to-levels is proposed for the buyer who wishes to minimize the expected cost of operating the retail system. The proposed policy starts each period by calculating the expected cost of ordering and not ordering action based on the information of the current inventory position and forecasted demand for the upcoming period. It then takes advantage of an integer programming model to get a cost effective joint replenishment plan. Computer experiment was performed to test efficiency of the proposed policy. When compared with the most efficient policy currently available, our policy showed a considerable cost savings especially for the problems having non-stationary demands.

시뮬레이션을 통한 제철플랜트 배관장치 설계비용의 변동 범위 분석 (Analysis of Cost Variation of Piping Equipment Design of a Steel Manufacturing Plant by Simulation)

  • 배경석;허기무;윤성훈;문윤재;유호선;이재헌
    • 플랜트 저널
    • /
    • 제10권4호
    • /
    • pp.29-34
    • /
    • 2014
  • 본 연구에서는 배관설계항목을 조사하여 전문가 면담 및 설문을 통해 주요 설계항목을 도출하였고, 이를 국내외 사례 프로젝트에 적용하여 주요 배관설계 항목별 비중 및 비용변동 범위를 조사하였다. 조사결과를 바탕으로 몬테카를로 시뮬레이션을 활용하여 배관설계비 전체에 대한 비용변동 범위를 분석하여 유사 프로젝트 수행 시 입찰단계에서 합리적인 입찰금액 산정 및 입찰참여에 대한 타당성을 검토할 수 있는 방안을 제시하였다.

  • PDF