• 제목/요약/키워드: cost items

검색결과 916건 처리시간 0.027초

공동주택 장기수선계획 수립기준 항목 조정에 관한 기초 연구 (Preliminary Study on the Coordination of the Repair works' items of the Long Term Repair Plan in Apartment Housing)

  • 이강희
    • 한국주거학회논문집
    • /
    • 제27권4호
    • /
    • pp.13-22
    • /
    • 2016
  • The long term plan for apartment housing has a important role to make a decision making whether a repair work should be done or not. But, items for repair works are so various that field workers could not understand the context or plan the repair cost and time. These difficulties are drawn from the number of repair items, duplicated application and meaning, new material application and technology time-gap. Therefore, it needs to change or coordinate the repair items to improve the repair condition, reflecting the current material level or repair technologies. In this paper, it aimed at coordination of the repair items through the repair recording sheet which was surveyed in 22 metropolitan areas of Seoul, conducted between 2011 and 2014. The surveyed data are classified into six categories such as building exterior, building interior and so on, according to long term repair plan and the number of data are 1,918. It analyzed the appearing word for repair-concerned and compared the existing items of the long term plan. Items of building exterior are proposed as roof, exterior wall and painting. Building interior has a little meaning to propose the repair items. The water supply facilities are proper to keep the existing repair items. Items of the outdoor facilities could not need a sign board, drainage root and PVC sheath. Through this study, we can coordinate the repair items in apartment and provide the repair item and cost level.

DEVELOPMENT OF LIFE CYCLE COST ANALYSIS SYSTEM FOR THE BUILD-TRANSFER-LEASE PROJECTS

  • Chun-kyong Lee;Bong-ho Cho;Tae-keun Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.119-129
    • /
    • 2007
  • In January 2005, the BTL private investment project was introduced in the Korean construction market as part of the plan to provide high-quality public service and expand the required facilities in a timely manner. Nonetheless, problems such as the low earning rate at the beginning of the business, burden of service compared to the cost of the proposed business, and limitations of the local small and medium-sized companies in relation to their participation in the project arose. The LCC analysis system for the BTL projects was developed as part of efforts toward efficiently investigating the investment eligibility. Specifically, methods for LCC analysis were selected for each stage of the BTL project in relation to the requests of experts for military residential facilities and public educational facilities. Variables were then extracted to derive an accurate analysis value, LCC for the 5 cost items (initial investment cost, operating expenses, maintenance expenses, energy cost, and disposal cost), analyzed, and system enabling comparative analysis for single and multiple initiatives by year and item, developed. Thus, we have to clearly require the accumulation of data to examine the appropriateness of the results of LCC analysis based on data and results.

  • PDF

소형자동창고에 있어서 품목간 상관관계를 이용한 저장위치 결정법 (Correlated Assignment Strategy in Miniload AS/RS)

  • 김갑환
    • 대한산업공학회지
    • /
    • 제19권1호
    • /
    • pp.19-29
    • /
    • 1993
  • The problem of clustering stock-keeping-units to assign storage locations is treated. Firstly, a construction heuristic algorithm is developed to cluster items considering demand dependencies(correlated assignment) for the case that the maximum number or the maximum volume(weight) of items per tray is constrained by the capacity of tray. Secondly, inventory-related cost as well as material handling cost is considered to determine the space requirement and the storage location of each item simultaneously.

  • PDF

수리가능한 아이템의 최적무상보증기간 (Optimum Free Warranty Interval for Repairable Items)

  • 정영배
    • 산업경영시스템학회지
    • /
    • 제21권45호
    • /
    • pp.301-307
    • /
    • 1998
  • This paper proposes free warranty interval for repairable items when the failure types of item are considered. Failure types are classified into major failure and minor failure. If major failure occurs during warranty period, the item is replaced and if minor failure occurs during warranty period, the item is minimally repaired. This paper determines the optimum free warranty interval which minimizes total expected cost of the free warranty cost model. Numerical example is shown in which failure time of item has weibull distribution.

  • PDF

설계도서 변경에 의한 실 공사비의 책정에 관한 연구 (The Research About Suitability of The Cost of Work According to The Alteration of Design Literature)

  • 임칠순;이규철
    • 한국건축시공학회지
    • /
    • 제3권3호
    • /
    • pp.113-120
    • /
    • 2003
  • The purpose of this thesis is to provide an appropriate trade-off information for the conflicting interests caused by the various factors between building owner and contractor during selecting the contractor and performing the construction work, in which the construction was contracted by open bidding from the government or private organizations. In order to propose the legitimate evidence, the differences between the domestic contract sheet of drawing change and the process of drawing change and those of the foreign countries were compared and analysed. The number of construction ordered in Youngdong area in 2001 whose construction expenses are more than 100,000,000 won is 218 items and 147,005,000,000 won in total cost. Among them, the number of 218 items whose total cost amounts to 16,705,000,000 (11.36%) is in case of increase of construction expenses due to the drawing changes, and the number of 48 items whose total cost amounts to 2,009,000,000 won (1.37%) is the case of decrease. In conclusions, the contractor could have more benefits than the building owner in case they submit the detailed estimate sheet without eliminating the increasing expenses of construction. It is shown that the building owner's loss is increasing whenever the labor cost is higher than material cost. Therefore, this thesis proposes a proper standards for the harmonious compromise between the contractor and the building owner for the problems caused by the drawing changes when the contract agreement is occurred.

공동구의 정량적 경제성 평가를 위한 항목별 중요도 분석 (Analysis of importance by category for quantitative economic evaluation of multi-utility tunnel)

  • 조중연;심영종;김훈겸;이필윤;이민재
    • 한국터널지하공간학회 논문집
    • /
    • 제20권1호
    • /
    • pp.119-130
    • /
    • 2018
  • 기존 공동구에 관한 VE/LCC 연구는 정량적 방법을 통하여 편익(7개 항목), 비용(5개 항목)에 대하여 서울시의 주요 10개노선을 대상으로 비용-편익 분석을 통한 공동구의 경제적 타당성을 검토하였다. 기존 공동구에 관한 VE/LCC 연구는 정량적 방법을 통하여 편익(7개 항목), 비용(5개 항목)에 대하여 분석을 수행하였다. 이에 본 논문에서는 3개의 항목(교통사고감소, 차량소음저감, 사회 경제 손실)을 추가하여 서울시 주간선도로 61개 구간에 대하여 경제성 평가를 분석 하였다. 교통사고감소 항목은 사업시행으로 절감할 수 있는 교통사고 비용을 개량화한 것이며, 차량소음저감 항목은 사업시행으로 발생하는 소음 변화량을 나타낸 지표이다. 마지막으로 사회 경제손실 항목은 공동구의 시공으로 인하여 지역경제에 미치는 영향을 금액으로 나타낸 것이다. 편익은 10개의 항목, 비용은 8개의 항목들 중 우선 추가 항목들의 금액을 비교 분석 하였으며, 개착식 및 터널식 공동구에서 추가된 항목들과 전체 항목들이 각 분석에 미치는 영향 정도를 분석하였다. 분석의 결과로 공동구 경제성 평가시 기초 및 상세 모델에 적용되는 항목들을 분석하여 공동구 설계시 보다 효율적인 경제성 평가가 가능하도록 하였다. 본 연구에서 추가로 제시된 항목들을 포함한 기초 및 상세 모델의 경제성 평가는 공동구 설계시 자주 활용될 것으로 판단된다.

비용을 극소화하는 최적 번인시간 결정 (Cost Optimizing Burn-in Time Determination)

  • 이상용;박해근
    • 품질경영학회지
    • /
    • 제21권2호
    • /
    • pp.102-108
    • /
    • 1993
  • The purpose of burn-in is to eliminate the early failures of the products before they are delivered for customer use. Therefore burn-in should he continued until one is reasonally sure that all the weak items have failed, thus leaving the remaining items in a healthy state of reliability. From this point of view, burn-in time dependent costs such as a cost per product per burn-in time, and cost of repair of the product per failure occurred during burn-in time will he increased. Conversely, the cost of field repair of the product per failure occurred during the guarantee period will be decreased since the early failure of the product is fully eliminated during burn-in. Hence, this paper intend to determine optimal burn-in time which minimize the total of above costs associated with burn-in.

  • PDF

출하 품질목표 조건하에 검사비용을 최소화하는(K, r) 부분검사정책의 분석 (Analysis of (K, r) Incomplete Inspection Policy for Minimizing Inspection Cost subject to a Target AOQ)

  • 양문희
    • 산업공학
    • /
    • 제24권1호
    • /
    • pp.87-96
    • /
    • 2011
  • In this paper, we address an optimization problem for minimizing the inspection and rework cost in an inspection-rework system, which forms a network of nodes including a K-stage inspection system, storage areas for items, a source inspection shop, and a re-inspection shop. We assume that (n, 0) acceptance sampling is performed in the source inspection shop and that only 100(1-r)% of items of rejected lots are re-inspected in the re-inspection shop. Since all the nodes are interrelated, in order to formulate our steady-state objective function, we make a steady-state network flow analysis between nodes, and derive both the steady-state amount of flows between nodes and the steady-state fraction defectives by solving a nonlinear balance equation. Finally we provide some fundamental properties and an enumeration procedure for determining the optimal values of (K, r) which both minimizes our objective function and attains a given target average outgoing quality.

건설공사의 안전관리비 사용에 대한 투자효과 분석에 관한 조사 연구 (A Study on the Benefit cost Analysis of the Safety Cost in Construction Work)

  • 이영섭;김남훈;박종근
    • 한국안전학회지
    • /
    • 제16권3호
    • /
    • pp.111-116
    • /
    • 2001
  • This study is conducted to review the ratio of direct and indirect cost accompanied by industrial accident in construction sites. It is surveyed that how to use safety cost in construction work is most efficient in comparison with several items of safety cost through the regression analysis.

  • PDF

정량적 위험성 평가에 의한 안전관리 투자의 비용-편익분석 (Cost-Benefit Analysis for Safety Management Cost using Quantitative Risk Analysis)

  • 장서일;조지훈;김태옥
    • 대한안전경영과학회지
    • /
    • 제4권4호
    • /
    • pp.15-26
    • /
    • 2002
  • The quantitative evaluation method of the safety management cost was suggested to prevent a gas accident as a major industrial accident. In a gas governor station, process risk assessments such as the fault tree analysis(FTA) and the consequence analysis were performed. Based on process risk assessments, potential accident costs were estimated and the cost-benefit analysis(CBA) was performed. From the cost-benefit analysis for five classification items of safety management cost, the order of the cost/benefit ratio was estimated.