A Study on Estimating the Contingency Cost of Small Construct Project (소규모 건설 프로젝트에서의 공사예비비 산정방법에 관한 연구)

  • 송진우;표영민;박성호;이상범
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2004.05a
    • /
    • pp.113-117
    • /
    • 2004
  • We need the contingency cost in order to deal with the uncertainty to be accompanied inevitably at the construction and an every kind risk not to forecast in advance. And also the contingency colt needed for the change order and we need it for reduction of the delay and reduce the trouble between owner and constructor. This study, through checking and analyzing the risk factor, in the step of domestic construction, suggests optimal management reserve to specific business about the contract type and the scale. The main results of this research are summarized as follow. First, I investigated the recognition about the contingency cost, grasped the risk to be happened at the construction step and found out the frequency occurrence, through making up question to engineer are carrying out their job in the domestic construction. Second, I computed optimal contingency cost rate by the statistics investigation, and proposed an improvement plan and problem when compute a contingency cost.

  • PDF

A Study on the Maintenance Cost Estimation Model of the Apartment Housing (공동주택의 관리비 추정모델 연구)

  • Lee, Kang-Hee;Yang, Jae-Hyuk;Chae, Chang-U
    • Journal of the Korean housing association
    • /
    • v.21 no.2
    • /
    • pp.59-67
    • /
    • 2010
  • The maintenance cost plays a important role to plan the scale of the apartment housing such as a number of household, building area and building type. Therefore, it is required to forecast the cost considering various maintenance characteristics. The maintenance characteristics are floor area, number of household, heating type, site area and etc.. In addition, the maintenance cost are classified into 5 area. These are a personal expense, facility maintenance cost, energy and water cost, insurance and sanitary cost. These five cost area are related with various characteristics and brought up the estimation model using the stepwise multiple regression analysis. The energy and heating cost share over the 50% in the total cost and the personal expense cost shares about 40%. The personal expense cost per area is 5,272 won/$m^2{\cdot}yr$ irregardless of heating type and the district heating type is a higher cost than other type. In facility maintenance cost, the central heating type is 2,015 won/$m^2{\cdot}yr$ and higher than other type. The estimation models have good statistics in each model. Most of the model have a determination coefficient over 0.7 and Durbin Watson value between 1.5 and 2.5.

Time Series Analysis and Forecast for Labor Cost of Actual Cost Data (시계열분석을 통한 실적공사비의 노무비 분석 및 예측에 관한 연구)

  • Lee, Hyun-Seok;Lee, Eun-Young;Kim, Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.24-34
    • /
    • 2013
  • Since 2004, the government decided to gradually introduce Actual Cost Data into cost estimate for improving problems of below-cost tendering and to reflect fair market price through competition and carry contract efficiently. However, there are many concerns that Actual Cost Data has not reflected real market price, even that has contributed to reduce the government's budget. General construction firm's burden for labor cost is imputed to specialty contractors and eventually it becomes construction worker's burden. Therefore, realization of Actual Cost Data is very important factor to settle this system. To understand realization level and make short term forecast, this paper drew construction group of which labor cost constitutes more than 95% of direct cost, and compares their Actual Cost Data with relevant skilled workers's unit wage and predicts using time series analysis. The bid price which is not be reflected market price accelerates work environment changes and leads to directly affect such as late disbursement of wages, bankruptcy to workers. Therefore this paper is expected to be used to the preliminary data for solving the problem and establishing improvement of Actual Cost Data.

Evaluation of Travel Time Prediction Reliability on Highway Using DSRC Data (DSRC 기반 고속도로 통행 소요시간 예측정보 신뢰성 평가)

  • Han, Daechul;Kim, Joohyon;Kim, Seoungbum
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.17 no.4
    • /
    • pp.86-98
    • /
    • 2018
  • Since 2015, the Korea Expressway Corporation has provided predicted travel time information, which is reproduced from DSRC systems over the extended expressway network in Korea. When it is open for public information, it helps travelers decide optimal routes while minimizing traffic congestions and travel cost. Although, sutiable evaluations to investigate the reliability of travel time forecast information have not been conducted so far. First of all, this study seeks to find out a measure of effectiveness to evaluate the reliability of travel time forecast via various literatures. Secondly, using the performance measurement, this study evaluates concurrent travel time forecast information in highway quantitatively and examines the forecast error by exploratory data analysis. It appears that most of highway lines provided reliable forecast information. However, we found significant over/under-forecast on a few links within several long lines and it turns out that such minor errors reduce overall reliability in travel time forecast of the corresponding highway lines. This study would help to build a priority for quality control of the travel time forecast information system, and highlight the importance of performing periodic and sustainable management for travel time forecast information.

A Study of the Application for Proper Construction Cost Estimating Method based on the Actual Cost Data (실적자료에 의한 적정 건축공사비 산정 방법에 관한 사례연구)

  • Cho Jae-Ho;Park Sang-Jun;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.383-386
    • /
    • 2001
  • The ability to make good cost overruns predictions is a very important aspect of in major construction project. The probabilistic cost models can provide more reliable than traditional cost models which have been used in korea to prepare Bill of Quantities, if the actual cost data are sufficient enough to analyze the trends of the variables. The paper considers non-deterministic methods in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The objectives of this research is to develop a method to forecast the probabilistic total construction cost and the elemental work cost

  • PDF

Solar Power Generation Forecast Model Using Seasonal ARIMA (SARIMA 모형을 이용한 태양광 발전량 예보 모형 구축)

  • Lee, Dong-Hyun;Jung, Ahyun;Kim, Jin-Young;Kim, Chang Ki;Kim, Hyun-Goo;Lee, Yung-Seop
    • Journal of the Korean Solar Energy Society
    • /
    • v.39 no.3
    • /
    • pp.59-66
    • /
    • 2019
  • New and renewable energy forecasts are key technology to reduce the annual operating cost of new and renewable facilities, and accuracy of forecasts is paramount. In this study, we intend to build a model for the prediction of short-term solar power generation for 1 hour to 3 hours. To this end, this study applied two time series technique, ARIMA model without considering seasonality and SARIMA model with considering seasonality, comparing which technique has better predictive accuracy. Comparing predicted errors by MAE measures of solar power generation for 1 hour to 3 hours at four locations, the solar power forecast model using ARIMA was better in terms of predictive accuracy than the solar power forecast model using SARIMA. On the other hand, a comparison of predicted error by RMSE measures resulted in a solar power forecast model using SARIMA being better in terms of predictive accuracy than a solar power forecast model using ARIMA.

A Study on the Improvement of Aircraft Contract Maintenance System (항공장비 외주정비체계 개선방안 연구)

  • Suh Sung-chul;Park Seung-hwan
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.2
    • /
    • pp.96-107
    • /
    • 2004
  • This paper deals with $\ulcorner$Requirement Decision Model for Repair Parts supplied by the Government$\lrcorner$ which is to reduce Aircraft Contract Maintenance Cost. It aims to find solutions to the fundamental problems of the Aircraft Contract Maintenance System. Under the current Aircraft Contract Maintenance System, it is hard to forecast the exact demand of repair parts, so support rate of Repair Parts supplied by the Government is restricted under 50 percent. It is inevitable to purchase Repair Parts from the firm with much higher price than those of Government source. However, absence of fixed demand pattern makes it difficult to improve accuracy of demand forecast. As a solution to these problems, this model prevents a cost increase due to the unit price difference between Repair Parts supplied by the Government and Repair Parts purchased by the Firm. It also reflects demand characteristics of each repair part, and prevents continual stock increase by setting an upper limit on the amount of Repair Parts supplied by the Government. The effectiveness of this model is verified by empirical analysis using the latest raw data. By applying this model to real situation, we expect to reduce about 4 billion won every year.

A Computerized Construction Cost Estimating Method based on the Actual Cost Data (실적 공사비에 의한 예정공사비 산정 전산화 방안)

  • Chun Jae-Youl;Cho Jae-ho;Park Sang-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.2 s.6
    • /
    • pp.90-97
    • /
    • 2001
  • The paper considers non-deterministic methods of analysing the risk exposure in a cost estimate. The method(referred to as the 'Monte Carlo simulation' method) interprets cost data indirectly, to generate a probability distribution for total costs from the deficient elemental experience cost distribution. The Monte Carlo method is popular method for incorporating uncertainty relative to parameter values in risk assessment modelling. Non-deterministic methods, they are here presented as possibly effective foundation on which to risk management in cost estimating. The objectives of this research is to develop a computerized algorithms to forecast the probabilistic total construction cost and the elemental work cost at the planning stage.

  • PDF

Observing System Experiments Using KLAPS and 3DVAR for the Upper-Air Observations over the South and West sea during ProbeX-2009 (KLAPS와 3DVAR를 이용한 ProbeX-2009 남·서해상 고층관측자료의 관측 시스템 실험 연구)

  • Hwang, Yoon-Jeong;Ha, Jong-Chul;Kim, Yeon-Hee;Kim, Ki-Hoon;Jeon, Eun-Hee;Chang, Dong-Eon
    • Atmosphere
    • /
    • v.21 no.1
    • /
    • pp.1-16
    • /
    • 2011
  • Numerical prediction capability has been improved over the decades, but progress of prediction for high-impact weather (HIW) was unsatisfactory. One reason of low predictability for HIW is lack of observation data. The National Institute of Meteorological Research (NIMR) has been performed observation program for improvement of predictability, and reduction in social and economical cost for HIW. As part of this observation program, summer intensive observation program (ProbeX-2009) was performed at the observation-gap areas from 25 August to 6 September 2009. Sounding observations using radiosonde were conducted in the Gisang2000 research vessel (R/V) from the Korea Meteorological Administration (KMA) over the West Sea and the Eardo R/V from the Korea Ocean Research and Development Institute (KORDI) over the South Sea. Observation System Experiment (OSE) is carried out to examine the effect of ProbeX-2009 data. OSEs using Korea Local Analysis and Prediction System (KLAPS) and Weather Research and Forecasting (WRF) Model are conducted to investigate the predictability for a short time forecast. And, OSEs using WRF/3DVAR system and WRF forecast model are conducted to study the predictability for an extended time. Control experiment (K_CTL and CNTL) used only GTS observation and experiment (K_EXP and SWEXP) used ProbeX-2009 data from two system are performed. ETS for 3hr accumulated rainfall simulated by KLAPS-WRF shows that K_EXP is higher than K_CTL. Also, ETS for 12hr accumulated rainfall of SWEXP from 3DVAR-WRF is higher than CNTL. The results indicate that observation over the ocean has positive impact on HIW prediction.

Wave Modeling for Low-cost Wave Monitoring System (저가형 해파 모니터링 시스템을 위한 파형 모델링)

  • Lee, Jung-Hyun;Lee, Dong-Wook;Heo, Moon-Beom
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.63 no.3
    • /
    • pp.383-388
    • /
    • 2014
  • This paper describes a wave modeling method using low-cost sensors. Wave modeling is applied to the wave monitoring system for accurate measurement of ocean wave parameters. The observation of ocean wave parameters is necessary to improve the accuracy of forecast of ocean wave condition. However, the ocean wave parameters measured by a low-cost wave monitoring system suffer from several errors. Therefore we introduce a wave modeling method to compensate the ocean wave parameters corrupted by errors. The proposed method is analyzed using experiments within controlled environment. It is verified that the accuracy of low-cost wave monitoring system can be increased by the proposed method.