• 제목/요약/키워드: cost calculation

검색결과 1,040건 처리시간 0.025초

초기 설계단계에서 개산 견적의 수량산출에 의한 건축공사비 작성에 대한 고찰 - 공사비 관리 사례 및 작업 방법을 중심으로 - (Consideration on the Creation of Construction Cost by Calculating the Quantity at the Planning Design Stage - Focusing on Construction Cost Management Vases and Work Methods -)

  • 현동명;전상훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.329-330
    • /
    • 2021
  • The calculation of the correct construction value in the construction should be investigated after the quantity is calculated. In order to calculate the quantity requires a lot of cost and time, and the initial accurate quantity calculation is not possible. Therefore, in the planning step in order to successfully complete the project to demonstrate the practicality of the difference between the construction cost by the construction design by presenting a method for calculate the quantity through the estimate with the construction open, floor plan, surface view, section.

  • PDF

공공사업 예정공사비에 대한 실증적 접근 (An Empirical Approach Study on Construction Cost Estimation in Public Work Projects)

  • 유창규;송정규;이윤선;김재준
    • 한국건축시공학회지
    • /
    • 제9권1호
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

조경 공사 내역서 계산 자동화를 위한 소프트웨어 개발에 관한 연구 (A Study on the Software Development to Automate the Calculation for the Landscape Architecture Construction Cost Estimation.)

  • 이규석;황국웅
    • 한국조경학회지
    • /
    • 제20권2호
    • /
    • pp.106-118
    • /
    • 1992
  • The landscape architecture construction cost estimation includes the repeated calculation and updating. Thus, it is time-consuming, and one of the jobs which needs to be automated first. In Korea, the IBM compatible personal computer(PC) is the most widely used one in the landscape architecture firms. However, the software for landscape architecture construction cost estimation is not being used in the PC environment. Therefore, the purpose of this study is to develop the software which can be used to automate the calculation for the landscape architecture construction cost estimation, and runs in the IBM compatible personal computers(PC). The clipper '88 summer is one of the DBMS software packages, and it has many commands and functions and functions which reduces program lines and makes the programing efficient, especially in the programing work whose total source code lines do not exceed over 10,000 lines. So, it was used in this study. The software developed in the this study was tested using the real data, and it was found that it can be efficiently used in the following jobs. They are: (1) to calculate exactly and rapidly. (2) to use resources repeatedly. (3) to print out the results. (4) to store data files for the future use. The software, as discussed in this paper, reduces the time and efforts to be spent in the calculation for the landscape architecture construction cost estimation compared with the traditional approach using the pocket calculator.

  • PDF

해외 건설엔지니어링분야 대가기준 사례분석을 통한 개선방향 마련 (The Establishment of Improvement Direction through Case Analysis of Cost Standards in Overseas Construction Engineering)

  • 고현아;한재구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.165-166
    • /
    • 2020
  • The standard for the cost calculation in the field of domestic construction engineering can be largely divided into the construction cost ratio method and the actual cost addition method. However, the standard for calculating the cost of the construction cost ratio method is a trend to switch to the actual cost addition method due to limitations such as not reflecting the characteristics of the construction. Therefore, this study aims to derive implications by investigating and analyzing examples of cost standards in the field of overseas construction engineering, such as the United States, and deriving directions for improvement in domestic cost standards in the future.

  • PDF

해양레저관광단지의 개발가치 추정 (Estimation of Development Valuation at Marine Tourism complex)

  • 장운재;금종수
    • 해양환경안전학회:학술대회논문집
    • /
    • 해양환경안전학회 2008년도 춘계학술발표회
    • /
    • pp.69-74
    • /
    • 2008
  • 본 연구는 화원레저관광판지 개발에 따른 편익비용을 산출하였다. 편익비용 산출을 위해 본 연구에서는 개선된 여행자비용법과, 교통수단을 다양화하고, 설문응답자의 확신도 고려한 진전된 여행자비용법을 제안하였다. 그 결과 확신도 52%와 할인율 10%시 편익비용은 2928억 5백만원이고, GDP성장률 4%고려시 3045억 17백만원인 것으로 나타났다.

  • PDF

철도차량의 RCM 분석을 위한 유지보수비용 산출방안 (Calculation of Maintenance Cost for RCM Analysis of Railway Vehicle)

  • 이창환;박병노;임성수
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2008년도 추계학술대회 논문집
    • /
    • pp.1481-1486
    • /
    • 2008
  • To apply more effective the RCM analysis for railway vehicle, the maintenance cost per equipment should be considered together with failure criticality per equipment considered in existing. This paper is described the systematic calculation of maintenance cost considering the RCM analysis of railway vehicle. To calculate the maintenance cost systematically, the cost breakdown structure was established, and basic cost information and calculated cost items were defined. In addition, the linking between calculated cost and RCM analysis was considered. In future, this proposal would be used to analysis of cost effectiveness through RCM analysis of railway vehicle.

  • PDF

제조업의 재해손실비용산정을 위한 소프트웨어 개발에 관한 연구 (A Study on Development of the Software for Measurement of Safety Cost in Manufacture Industry)

  • 권희봉;조수원;이창호
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2001년도 춘계학술대회
    • /
    • pp.39-43
    • /
    • 2001
  • The existent system of management for Measurement of Safety Cost are not effective because of the data loss and time loss and occurrence of errors through manual calculation. Therefore, tile development of the software for measurement of safety cost can solve the problem through the systematic calculation for safety cost and converting the related data to database, and also can build the strategy of the investment of Safety cost through analysing and comparing with the past data in the database. As a part of development of the software of Measurement of Safety Cost which is appropriate for the domestic environment, this study is developing a software based on Noguji method, which is one of the methods of Measurement of Safety Cost, and to appraise the efficiency of the management of Measurement of Safety Cost we will implement and improve the software in the case of the domestic enterprises.

  • PDF

제조업의 재해 손실 비용 산정을 위한 소프트웨어 개발에 관한 연구 (A Study on Development of the Software for Measurement of Safety Cost in Manufacture Industry)

  • 권희봉;조수원;이창호
    • 대한안전경영과학회지
    • /
    • 제3권1호
    • /
    • pp.1-10
    • /
    • 2001
  • The existent system of management for Measurement of Safety Cost are not effective because of the data loss and time loss and occurrence of errors through manual calculation. Therefore, the development of the software for measurement of safety cost can solve the problem through the systematic calculation for safety cost and converting the related data to database, and also can build the strategy of the investment of Safety cost through analysing and comparing with the past data in the database. As a part of development of the software of Measurement of Safety Cost which is appropriate for the domestic environment, this study is developing a software based on Noguji method, which is one of the methods of Measurement of Safety Cost, and to appraise the efficiency of the management of Measurement of Safety Cost we will implement and improve the software in the case of the domestic enterprises.

  • PDF

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

수질오염총량관리 시행계획 이행평가 사업의 대가산정 방안에 관한 연구 (Cost Calculation of the Implementation Project for the Management of Total Maximum Daily Loads)

  • 김소희;백송이;정나리아;현재명
    • Ecology and Resilient Infrastructure
    • /
    • 제9권3호
    • /
    • pp.174-182
    • /
    • 2022
  • 수질오염총량관리제도 추진 절차 중 시행계획 이행평가 사업의 대가는 기존 환경부 용역비 지원기준에 따라 산정하고 있다. 그러나 용역비 지원기준은 기본금에 해당 유역면적과 인구 규모에 따른 가산금을 합산하여 대가를 산정하도록 구성되어 있어 사업의 특성을 상세히 반영한 대가를 산정하기 어려운 구조이다. 따라서 본 연구에서는 이행평가의 상세 업무별 영향을 미치는 요인으로 단위유역별 면적, 인구, 축산 두수, 폐수배출업소 등을 반영한 표준품셈을 적용하여 대가산정 방안을 제안하고 그 적정성을 검증하였다.