KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.2D
/
pp.153-161
/
2010
The city planning of a local government is a continuous process that does not end with the creation of a plan but proceeds through decision-making, monitoring and evaluation phases. As a new city planning is changed and confirmed, there is a chance to construct a large scale road that is connected with an under constructed road. In this case, the expansion of the width and length of road, the addition of bridges or tunnels, and the change of the size and location of interchanges lead to many changes on road design and construction. In the past, the consignment contracts for a road construction have been made in limited numbers and for limited civil works. Now, it is growing in numbers and is making for large scale multi-works. However, the standard process and guidelines for the consignment contracts have not been suggested yet, so there is difficulty in performing the consigned road construction effectively. In this paper, the important factors for the consignment contracts are determined by construction document reviews and expert interviews. Based on these results, a standard process for the consigned contracts and a guideline for agreeing on construction cost are suggested. The costs that should be paid by a consignor are also defined.
Korean Journal of Construction Engineering and Management
/
v.20
no.6
/
pp.98-106
/
2019
Recently, the number of project delay-related claims and disputes in Korean construction projects has been increasing rapidly. This suggests that the domestic construction contract practice, which has traditionally been superior to the client, is changing into a mutually balanced relationship among the contracting parties. The project delay analysis selects the application method according to the type of schedule approved at the start of the construction and how the schedule management was performed during the construction. The most important prerequisite for project delay analysis is that a complete CPM schedule agreed at the beginning of the construction is prepared and the actual progress of such schedule is well documented. This study is about applying the project delay analysis methodology of a case where a contractor claims damages to a client while constructing a large new private building construction project. In this study, it is determined whether the application of the as-planned analysis method is appropriate to the incomplete CPM schedule and then proposes the as-planned vs. as-built analysis method based on the new standard as an alternative. Next, apply the as-planned vs. as-built analysis method to the schedule in the case project, and then compare it with the result of the as-planned analysis method. The purpose of this study is to suggest a project delay analysis method suitable for the domestic schedule management practices, so that it can be used as a meaningful reference in project delay disputes and litigations of domestic construction projects.
Journal of the Korean Institute of Landscape Architecture
/
v.47
no.1
/
pp.10-25
/
2019
This is a study on the ordering status of the cultural property repair work in Seoul, centered on the cultural property construction orders from each local government and affiliated institutions. The scope of this study is spatially based on the city of Seoul. The time range is from October 2015 to September 2017. We can grasp the scale of the cultural asset construction by recognizing the status of the cultural asset of the city and the budget available for repairing the cultural asset. By analyzing the actual situation of the cultural property construction over two years, we were able to learn the total number of orders, the ordering period, the order size and the associated order type. By analyzing the detailed data, we could grasp the actual state of each cultural property type mixing. As a result of that, it was found that one cultural property corporation had difficulty completing construction without the involvement of other types. This suggested the better contract way to a cultural property construction. This study suggests an appropriate ordering method analyzing the tendency of construction orders of cultural properties, which can be utilized as basic data for the placement of cultural property repair technicians in the field. In particular, landscape architecture is an important aspect of the cultural property construction. Despite the need to establish the status of landscaping, there are no papers describing the actual status of contract way to a cultural property construction and the status of the landscape architecture associated with them. This paper empirically reveals the facts for Seoul, and then makes a proposal to establish a complete analysis of the landscape construction business. Specifically, landscape architecture is in a position to take responsibility for the landscape of cultural asset. It is possible to propose the establishment of the status of landscape architecture and to contribute to the securing of business areas that are part of repairing cultural properties.
Baengnyeongdo Island, which belongs to Ongjin-gun, Incheon, is an island in the northernmost part of the West Sea in South Korea. Baengnyeong Island is the 15th largest island in Korea and covers an area of 51 km2. The Korea Ginseng Corporation (KGC) investigated the possibility of growing ginseng on Baengnyeong Island in 1996. In 1997, thanks to the support of cultivation costs from Ongjin-gun, the first ginseng seedbed was built on Baengnyeong Island. In 1999, the seedlings were transplanted to a permanent field under a contract with KGC. In 2003, the first six-year-old ginseng harvest was performed, and KGC purchased all production according to the contract. Since then, KGC has signed on to grow ginseng until 2012 and purchased six-year-old ginseng until the fall of 2016. Since 2014, the GimpoPaju Ginseng Agricultural Cooperative Association has signed a ginseng production contract. According to a survey of nine 6-year-old ginseng fields (total 5,961 units) on Baengnyeong Island, the top five with good growth had a survival rate of 42.6 to 68%, and the bottom four with poor growth had an extremely low survival rate of 11.1 to 21.3%. The four fields with low survival rates were where hot peppers were planted before ginseng cultivation. It is believed that the excess nitrogen remaining in the soil due to the treatment of compost or manure during pepper cultivation causes ginseng roots to rot. The average incidence of Alternaria blight was 8.6%. Six six-year-old ginseng gardens were low at 1.1 to 4.7%, while the other three were high at 16.7 to 20.9%. It is assumed that the reason for the low survival rate and high incidence of Alternaria blight is a rain-leaking shield. Farmers used rain-leaking shields because the precipitation on Baengnyeong Island was smaller than on land. One field showed 3% of leaves with yellowish brown spots, a symptom of physiological disturbance of the leaf, which is presumed to be due to the excessive presence of iron in the soil. To increase the production of ginseng on Baengnyeong Island, it is necessary to develop a suitable ginseng cultivation method for the island, such as strengthening the field management based on the results of a scientific study of soil, using rain-resistant shading, and installing drip irrigation facilities. I hope that ginseng will become a new driving force for the development of Baengnyeong Island, allowing ginseng products and food to thrive in the beautiful natural environment of the island.
Korean Journal of Construction Engineering and Management
/
v.9
no.1
/
pp.87-95
/
2008
The government wants to apply the construction cost estimating method based on historical data published in the first six months of 2004. Construction companies, however, require the proposed cost estimation model, to be improved which makes it difficult to predict a reasonable construction costs. This paper presents an improved historical data selection model after analyzing the problem of previous method throughout comparing contracted unit prices of reinforced concrete works selected by the previous model to market prices. The model which can select more feasible data would assist participates such as general contractors and sub-contractors to earn a proper profits.
This study was investigated the necessity and possibility of using block-chain technology in online used-goods trading platform. Current online used-goods trading platforms operate a safety trading system, but it is difficult to utilize due to relatively high commission rate. As a result, people mainly use the method of meeting and purchasing in person, which is a relatively costly method. This study discusses how to build a platform to solve or mitigate problems such as privacy, information distortion and omission, fraud, etc. In the platform proposed in this study, it is possible to solve the major fraud and personal information protection problems that may occur in the transaction proceeding by appropriately reflecting the types and characteristics of the block-chain technology. In future work, we will discuss legal framework and technology development plan to apply the proposed platform in this study.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.20
no.1
/
pp.35-44
/
2020
The growing use of public blockchain-based virtual cryptocurrency calls for secure management of blockchain account information managed through cryptocurrency wallet programs. The previously proposed wallet program has high security in terms of managing an account's private key, but low security in managing an account's recovery phrase. Therefore, in this paper, we propose a safe management system of blockchain account recovery string based on the new user authentication method using the user's mobile device information and OTP technique to overcome the problem of the existing account recovery string management method. It also conducts an analysis of the proposed blockchain account recovery string management system based on the expected behavior scenario.
The purpose of this research is to explain what affects the volunteer center's performance on the basis on the program logic model. We assume that internal factors and external factors influence the organizational performance. For the empirical analysis, we use SUR(seemingly unrelated regression). The major findings of this research are as follows: Frist, organizational budget as internal factors are important influential factors. Second, civil society's capacity variable and stakeholder's support variable affect positively volunteer center's performance. Third, the contract out variable's effect as an operation types is not proven statistically. In case of estimating the multi organizational performance, lastly, the SUR method is prefer to the OLS method in the aspect methodology. However, more systemic study is complemented the panel data for organizational performance.
The Potential Induced Degradation(PID) in PV module mainly affected by various performance conditions such as a potential difference between solar cell and frame, ambient temperature and relative humidity. The positive charges as sodium ions in front glass reach solar cell in module by a potential difference and are accumulated in the solar cell. The ions accelerate the recombination of generation electrons within solar cell under illumination, which reduces the entire output of module. Recently, it was generally known that PID generation is suppressed by controlling the thickness of SiNx AR coating layer on solar cell or using Sodium-free glass and high resistivity encapsulant. However, recovery effects for module with PID are required, because those methods permanently prevent generating PID of module. PID recovery method that voltage reversely applies between solar cell and frame contract to PID generation begins to receive attention. In this paper, PID recovery tests by using voltage under various outdoor conditions as humidity, temperature, voltage are conducted to effectively mitigate PID in module. We confirm that this recovery method perfectly eliminates PID of solar cell according to repeative PID generation and recovery as well as the applied voltage of three factors mainly affect PID recovery.
It is true that SOC facilities, such as dams, need long life cycles since more time has to be invested for the phases of planning, examination, feasibility study, design, contract, construction, and maintenance. This longer life cycle is easily exposed to the risk. And thus, brings additional cost by the delayed project, convenient loss according to the additional run of use, and benefit lose of not to using the facilities. So, the purpose of this study is to try to find a solution to reduce these time consuming problems which could diminish the whole national competition. Hence, this study is to show efficient, systematical project performance and network model by using reciprocal analyses between the construction period and cost based on economical analysis of each phase of life cycles. In addition, on the basis of these outputs, the Fast Track Method is suggested as an alternative solution as a new Approach in Life Cycle's Analysis.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.