• Title/Summary/Keyword: continuous bridge

Search Result 553, Processing Time 0.033 seconds

Optimal Design of Two-Span Steel Box Girder Bridges by LRFD (LRFD에 의한 2경간 강박스형교 최적화 설계)

  • 국중식;신영석
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2001.04a
    • /
    • pp.173-180
    • /
    • 2001
  • In this study steel box girders used as main members of a two span continuous steel bridge, are optimally designed by a Load and Resistance Factor Design method(LRFD) using an numerical optimization method. The width, height, web thickness and flange thickness of the main girder are set as design variables, and light weight design is attempted by choosing the cross-sectional area as an object function. We studied the results of steel box girders and compared with those of 1-type girders. The main program is coded with C++ and connected with optimization modul ADS. which is coded with FORTRAN.

  • PDF

Analysis of DC-DC Phase-Shifted Full-Bridge Converter in Light Load Condition (경부하에서 위상천이 풀브릿지 DC-DC 컨버터의 동작 분석)

  • Lee, Sunho;Park, Jung-Wook
    • Proceedings of the KIPE Conference
    • /
    • 2018.07a
    • /
    • pp.430-431
    • /
    • 2018
  • DC-DC 위상천이 풀브릿지 컨버터는 경부하 운용시에 영전압 스위칭이 발생하지 않아 큰 스위칭손실이 발생한다. 경부하에서 위상천이 풀브릿지 컨버터의 낮은 효율을 개선하기 위해 DCM (Discontinuous Conduction Mode) 동작을 이용한다. 본 논문은 경부하에서 위상천이 컨버터의 DCM과 CCM (Continuous Conduction Mode) 동작의 특성 및 도통 손실 절감을 위한 동기 정류기의 제어 방법을 이론적으로 분석하고, 시뮬레이션을 통해 검증하였다.

  • PDF

Structural Characteristics Analysis of Steel Box Girder Bridge being stressed the PS Steel Wires at the Upper Slab of the Intermediate Support (지점부 상부슬래브에 PS강선 긴장된 강 박스거더교의 구조적 특성 분석)

  • Cha, Tae-Gweon;Jang, Il-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.2
    • /
    • pp.1-7
    • /
    • 2021
  • The concrete deck slab at the continuous span support of the steel box girder bridge is a structure that is combined with the upper flange. It is a structure that can cause tension cracks in the deck slab at the support causing problems such as durability degradation in long span bridges. This is because the tensile stress in the longitudinal direction of the slab exceeds the design tensile strength due to the effects of dead load and live load when applying a long span. Accordingly, it is necessary to control tensile cracking by adding a reinforcing bar in the axial direction to the slab at the support and to introduce additional compressive stress. To solve this problem, a structural system of a steel box girder bridge was proposed that introduces compressive stress as PS steel wire tension in the tensile stress section of the upper slab in the continuous support. The resulting structural performance was compared and verified through the finite element analysis and the steel wire tension test of the actual specimen. By introducing compressive stress that can control the tensile stress and cracking of the slab generated in the negative moment through the tension of the PS steel wire, it is possible to improve structural safety and strengthen durability compared to the existing steel box girder bridge.

Influence Line of Three- span Continuous Curved Box-Girder Bridge using Elastic Equation (탄성방정식을 이용한 3경간 연속곡선교의 영향선에 관한 연구)

  • 장병순;장준환;김수정
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.14 no.4
    • /
    • pp.423-434
    • /
    • 2001
  • In this paper, a three-span continuous box girder is analysed by using elastic equation based on energy method, concerning the behaviour with the effects of bending and pure torsional moment. The statically indeterminate forces of a three-span continuous curved box girder are calculated by applying the principle of least work to this elastic equation. The influence line of shear force, bending moment, pure torsion, displacement and angle of rotation due to unit vortical load and unit torque for curved box girder are obtained. The internal forces of the curved box girder which the actual load is applied can be calculated using the influence line obtained from this study.

  • PDF

Prediction of Pumping Efficacy of Left Ventricular Assist Device according to the Severity of Heart Failure: Simulation Study (심실의 부하감소 측면에서 좌심실 보조장치의 최적 치료시기 예측을 위한 시뮬레이션 연구)

  • Kim, Eun-Hye;Lim, Ki Moo
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.12 no.4
    • /
    • pp.22-28
    • /
    • 2013
  • It is important to begin left ventricular assist device (LVAD) treatment at appropriate time for heart failure patients who expect cardiac recovery after the therapy. In order to predict the optimal timing of LVAD implantation, we predicted pumping efficacy of LVAD according to the severity of heart failure theoretically. We used LVAD-implanted cardiovascular system model which consist of 8 Windkessel compartments for the simulation study. The time-varying compliance theory was used to simulate ventricular pumping function in the model. The ventricular systolic dysfunction was implemented by increasing the end-systolic ventricular compliance. Using the mathematical model, we predicted cardiac responses such as left ventricular peak pressure, cardiac output, ejection fraction, and stroke work according to the severity of ventricular systolic dysfunction under the treatments of continuous and pulsatile LVAD. Left ventricular peak pressure, which indicates the ventricular loading condition, decreased maximally at the 1st level heart-failure under pulsatile LVAD therapy and 2nd level heart-failure under continuous LVAD therapy. We conclude that optimal timing for pulsatile LVAD treatment is 1st level heart-failure and for continuous LVAD treatment is 2nd level heart-failure when considering LVAD treatment as "bridge to recovery".

Hydrologic Cycle Simulation of Urban river for Rehabilitation of Water Environment (I) - Anyangcheon Basin - (물 환경 건전화를 위한 도시하천의 물 순환 모의 (I) - 안양천 유역 -)

  • Lee, Jung-Min;Lee, Sang-Ho;Lee, Kil-Seong
    • Journal of Korean Society on Water Environment
    • /
    • v.22 no.2
    • /
    • pp.349-357
    • /
    • 2006
  • Nowadays, the discharges of urban streams during dry season are depleted because the hydrologic cycle in the watershed has been destroyed due to the expansion of the impermeable area, the excessive groundwater pumping, climate change, and so forth. The streamflow depletion may bring out severe water quality problems. This research are to investigate the hydrologic characteristics and to develop a technology to restore sound hydrologic cycle of Anyangcheon watershed. For the hydrological cycle analysis of the Anyangcheon watershed, continuous simulations of urban runoff were performed for the upstream basin of Gocheok bridge whose basin area covered 4/5 of the whole catchment area. The increase of impervious area by urbanization was analysed and its effect on urban runoff was evaluated. The SWMM 5 (Storm Water Management Model 5) was used for the continuous simulation of urban runoff. The analysis results of urbanization effect on runoff are as follows: the surface runoff in 2000 increases to 65% of the whole precipitation whereas the surface runoff in 1975 amounts to 50% of the precipitation; the groundwater runoff in 2000 amounts to 7% and shows 6% decrease during the period from 1975 to 2000.

Successful Bridge to Heart Transplantation through Ventricular Assist Device Implantation and Concomitant Fontan Completion in a Patient with Glenn Physiology: A Case Report

  • Ji Hong Kim;Ji Hoon Kim;Ah Young Kim;Yu Rim Shin
    • Journal of Chest Surgery
    • /
    • v.57 no.3
    • /
    • pp.312-314
    • /
    • 2024
  • A 3-year-old boy with Glenn physiology exhibited refractory heart failure with reduced ejection fraction. To improve the patient's oxygen saturation, he underwent ventricular assist device (VAD) implantation with concomitant Fontan completion. The extracardiac conduit Fontan operation was performed with a 4-mm fenestration. For VAD implantation, Berlin Heart cannulas were positioned at the left ventricular apex and the neo-aorta. Following weaning from cardiopulmonary bypass, a temporary continuous-flow VAD, equipped with an oxygenator, was utilized for support. After a stabilization period of 1 week, the continuous-flow VAD was replaced with a durable pulsatile-flow device. Following 3 months of support, the patient underwent transplantation without complications. The completion of the Fontan procedure at the time of VAD implantation, along with the use of a temporary continuous-flow device with an oxygenator, may aid in stabilizing postoperative hemodynamics. This approach could contribute to a safe transition to a durable pulsatile VAD in patients with Glenn physiology.

A Contact-less Power Supply for Photovoltaic Power Generation System (태양광 발전 시스템을 위한 무접점 전원장치)

  • Lee, Hyun-Kwan;Kong, Young-Su;Kim, Yoon-Ho;Lee, Gi-Sik;Kang, Sung-In;Chung, Bong-Geun;Kim, Eun-Soo
    • The Transactions of the Korean Institute of Power Electronics
    • /
    • v.11 no.3
    • /
    • pp.216-223
    • /
    • 2006
  • The high efficiency full-bridge LLC resonant converter using a contact-less transformer Is proposed for the photovoltaic power generation system. For the series resonance with a series capacitor, the LLC resonant converter utilizes the leakage inductance and magnetizing inductance of a contact-less transformer Unlike the conventional series resonant converter operated to the continuous resonant current at above resonance frequency, the proposed converter operates to the discontinuous resonant current at the narrow frequency control range below resonance frequency. Due to the discontinuous mode resonant current, the proposed converter can be achieved the zero voltage switching (ZVS) in the primary switches and the zero current switching (ZCS) in the secondary rectification diodes without my auxiliary circuit. In this paper, the experimental results of the proposed full-bridge LLC resonant converter using a contact-less transformer are verified on the simulation based on the theoretical analysis and the 150W experimental prototype.

A Study on the Disposition of Cross Beams in Composite Plate Girder Bridge (강합성 플레이트거더교의 가로보 배치에 관한 연구)

  • Park, Yong Myung;Baek, Seung Yong;Hwang, Min Oh
    • Journal of Korean Society of Steel Construction
    • /
    • v.14 no.6
    • /
    • pp.691-699
    • /
    • 2002
  • A study on the evaluationof the proper spacing and required bending rigidity of cross beams in composite multiple I-girder bridge without lateral and sway bracing system was performed. For the purpose, a two-lane 40m simple span and 40+50+40m continuous sample bridge with four girders was designed. For the sample bridges, structural analysis under the design loads including dead load before and after composite, live load, and seismic loads has been performed. The material and geometric nonlinear analysis under dead load before composite has also been performed to evaluate lateral buckling strength of the steel-girder-cross beam grillage. Based on the two phase anlayses, proper spacing and bending righidity of cross beams were proposed.

Equivalent Shrinkage Strain For Steel-Concrete Composite Girder Bridges (합성거더교의 등가 건조수축 변형률)

  • Bae, DooByong;Jung, Dae Jun
    • Journal of Korean Society of Steel Construction
    • /
    • v.16 no.1 s.68
    • /
    • pp.135-144
    • /
    • 2004
  • Since Modern bridges have a tendency to make the spans continuous and longer, the effect of concrete shrinkage and creep is very important and must be evaluated appropriately for the durability and safety of steel-concrete composite bridges. However, highway design specification in current use prescribes $180^{1\;2}$ as the final shrinkage strain. which is for less value than one resulted from many experimental researches and cause some problems in the construction of composite bridges due to the understimation of shrinkage strain. Thus, in this paper nonlinear analysis with time-steps applying the CEB-FIP(90) provision have been conducted for plate girder bridge, box girder bridge and Preflex beam bridge and the linear equivalent shrinkage strain for the design of composite bridges. which produces the stress equal to the values from the nonlinear analysis, has been calculated by comparing the results with the values following highway design specification. The results yield appropriately double values than $180^{1\;2}$ which highway design specification prescribes.