A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.

A calculation method on the loss of labor productivity due to change orders (설계변경으로 인한 작업 생산성 손실 산정방법)

  • Jeon Yong-Deok;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.295-300
    • /
    • 2001
  • Additional costs as well as schedule delay are occurred due to change orders in today's construction projects. Additional costs, overhead calculation methods are of various types. In a foreign country cases, many claims related to the loss of labor productivity quote research statistics data. In domestic cases, the study of the reason why the loss of labor productivity occurs and its effect have not been performed. Therefore, this paper analyzes factors affecting lost productivity and a methodology is presented to estimate the lost productivity.

  • PDF

An Estimation Model of Historical Cost Using BIM Library for Road Project (도로분야 BIM 라이브러리를 활용한 실적공사비 산정모델 구축)

  • Moon, HyounSeok;Ju, KiBeom
    • Korean Journal of Computational Design and Engineering
    • /
    • v.20 no.4
    • /
    • pp.431-442
    • /
    • 2015
  • Currently, a BIM-based quantity takeoff (QTO) system is mainly focused on architectural projects. To perform this, diverse quantity takeoff methods such as an object-based automatic quantity takeoff, manual quantity and base functions of calculation have widely been utilizing. However, since BIM library for road projects includes structural elements associated with alignment, it is necessary to establish cost estimation system interlocked with historical cost using 3D library by each unit length. Accordingly, the aim of this study is to develop cost estimation model with using a historical cost approach so that it can be utilized in construction planning based on the BIM library for road projects. For this, based on the BIM library for road, the standardized quantity is estimated, and a process for calculating historical cost and a verification model with a 5D simulation was developed by mapping a WBS code with each BIM library object. This can be applied during the approximate cost estimation process in a project planning and an initial design phase for road projects. Besides, it is expected that these results will be utilized in constructing an optimal historical cost estimation process for project libraries.

A Comparison of Quantity Take-Offs of RC Structures based on BIM (BIM기반 철근콘크리트구조의 물량산출 비교)

  • Yoon, Jong Deok;Cho, Hyun Sik;Lee, Jae Hong;Shin, Jae Yong;Kim, Eun Suk
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.33 no.1
    • /
    • pp.35-44
    • /
    • 2020
  • In the construction industry, there is a growing demand for the accurate calculation of the quantity take-off and construction budget at the design stage, and it is likewise important to grasp changes in the construction budget and quantity take-off if design alterations are made. In addition, lawsuits related to the quantity take-off and cost of construction are frequent; therefore, the calculation of these factors using building information modeling (BIM) has emerged as an alternative. However, existing 2D-based methods are still used more frequently than BIM-based methods for quantity take-offs and construction budgets. This is because of the lack of BIM experience of estimation workers and the absence of a national standard. However, from a designer's point of view, it is necessary to understand the quantity take-off and construction cost based on BIM and accurately create the design according to the budget. In this study, the quantity take-offs of concrete, rebar, and reinforced concrete structures (apartments) in Seoul and Yeongjong were compared with the quantity take-offs based on 2D and BIM methods. From the viewpoint of the designer, we aim to increase the accuracy of BIM-based quantity take-offs.

Basic study for time analysis of insitu production of composite precast concrete members using linear scheduling method (LSM을 사용한 합성 PC 부재의 현장생산 공기 산정 기초연구)

  • Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.92-93
    • /
    • 2014
  • Green Frame is a method for Rahmen structure construction composed of composite PC members. The composite PC members of Green Frame which are based on in-situ production can reduce the construction cost and are more likely to secure quality when compared to production in factories. Previous studies developed forms for in-situ production of Green Frame composite PC members and proposed algorithms to arrange them on site. However, it requires not only their arrangement, but also calculation of an accurate production period to produce the required PC members in a limited space and supply them in a timely manner. In particular, it is necessary to clearly define the properties of detailed processes for in-situ production of PC members and to calculate the time required for respective process. To do so, this study is a basic research on calculating the time for in-situ production using a linear scheduling method.

  • PDF

Improvement of Construction Management System in Public Construction Projects - Focused on the Total Project Cost Management Guidelines - (공공 건설사업의 효율적 건설사업관리수행을 위한 제도개선방안 - 총사업비관리지침을 중심으로 -)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.1
    • /
    • pp.3-11
    • /
    • 2020
  • In large public construction projects with a certain size or larger that need to be carried out over a number of years, the Authority must secure a budget for construction project management activities by the construction manager. There is no problem if the project management budget secured by the issuing Authority and the project management budget executed by the issuing Authority are the same, but if not, various problems will arise. Therefore, in this study, the following measures were proposed to improve the system for efficient operation of construction project management: First, the construction project management terms and tasks specified in the statutes and the guidelines of government agencies should be unified and the standard for calculating consideration should be unified. Second, the total project cost management guideline should be specified so that the missing construction project manager can receive compensation for the technical proposal. Third, if the project cost is changed in the long-term continuous construction project, the construction project management expense should be adjusted accordingly. Fourth, if construction project management service is required from the Authority, the basis for consignment to a specialized institution should be specified in the total project cost management guideline.

A Study on the Factors Affecting the Detailed Design Price of Road Construction Project (국내 도로공사 실시설계 대가영향요인에 관한 연구)

  • Lee, Mi-Young;Seo, Jung-Hoon;Oh, Se-Wook
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.9
    • /
    • pp.44-54
    • /
    • 2018
  • In the construction project, the design field has a crucial effect on the success or failure of the final product, and it is becoming more important as a core area of national industrial development because it creates high value added by technology. In addition, since the design work is carried out based on professional technical personnel, in order to secure the quality and competitiveness of the design, it is necessary to continuously input the excellent manpower and develop the technology, and above all, the appropriate design cost must be ensured. However, as a result of reviewing the current status of the design cost criterion in Korea, problems such as mixed cost calculation method, inaccuracy of construction cost ratio method, and inactivation of cost plus fixed fee method were analyzed. Therefore, it is difficult to calculate the fair value reflecting the characteristics of the project when calculating the construction design price. Therefore, the price criterion should be improved so that the fair value of the design can be determined according to the contents of the project, By analyzing the correlation and multiple regression analysis of the projects and price information of the completed road construction design, the factors influencing the design price and the level of influence were analyzed.

PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

Development of Cost Estimation Model Considering Process Risk for Asbestos Dismantling Work (석면해체 공사의 공정 리스크를 고려한 비용 산정 모델 개발 )

  • Noh, Jae-Yun;Lee, Su-Min;Han, Seung-woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.49-50
    • /
    • 2023
  • Asbestos is a building material that has been actively used because of its excellent durability and heat resistance until 2009, when it was found to be a first-class carcinogen and prohibited in Korea. Currently, asbestos dismantling is an essential process in demolition of old buildings. Workers are likely to be exposed to asbestos in the process of dismantling and removing them, which causes various occupational diseases, suggesting related laws and work standards to ensure the safety of asbestos dismantling process. Accordingly, prior studies have been conducted to analyze the level of asbestos exposure and influencing factors occurring during work, but most of them are mainly concerning health issue while research on process risks considering field characteristics and safety aspects of the work processes is still insufficient. Therefore, this study aims to derive the process risks affecting the safety of workers based on the survey results of asbestos dismantling companies, and further proposed a cost calculation model taking those risks into account.

  • PDF

Profiling of Workers based on Safety Accident Big Data in Construction Site (건설현장 안전사고 빅 데이터 기반 작업자별 프로파일 분석)

  • Kang, Sung Won;Lee, Ki Seok;Yoo, Wi Sung;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.247-248
    • /
    • 2021
  • Recently, the government is pursuing to reduce the serious accidents in most industries, including the construction industry, by enacting laws on punishment. The accident rate tends to be depended on the size and type of construction sites, and the accidents occur frequently due to inadequate implementation of safety management system and management standards, especially, in small and medium-sized sites. This study has performed the profiling of 265,000 accident cases on construction sites by attribute analysis such as the ratio of days lost to work, and pattern of days lost to work compared to the size of the construction. It turned out that the proportion of accident cases was high mainly in small-scale construction sites, and long-term labor losses occurred. Shortly, it is necessary to establish an institutional standard for applying a realistic safety management cost calculation and management system centered on small-scale sites. Therefore, this study is expected to be used as fundamental data or guideline for developing a customized safety management and accident prevention system for a worker reflecting the conditions of a construction site in the future.