• Title/Summary/Keyword: construction-based

Search Result 14,484, Processing Time 0.037 seconds

A Study on Safety Information Provision for Workers using Virtual Reality-based Construction Site (Virtual Reality 기반의 가상 공사현장 구축을 통한 작업자 안전정보 제공 방안)

  • Park, Junwon;Lee, Sang-Ho;Kim, Sung-Hoon;Won, Jeong-Hun;Yoon, Young-Cheol
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.1
    • /
    • pp.45-52
    • /
    • 2020
  • Construction industry has a relatively higher industrial accident rate than other domestic industries. Thus, to reduce the accident rate, researches on the methodology of worker's safety education combined with new technologies like IT technology have increased. In the light of workers' safety information provision, this study develops a VR(Virtual Reality)-based construction site using the BIM(Building Information Modeling) data. The target structures and geographical features are included in the VR-based construction site where the construction machinery model and worker model are also created using a game engine. For highly effective provision of safety information, video clips with suitable captions corresponding to working processes were made with proper screen directing. They should be appropriately connected to correct worker's operations to improve the work commitment level, sense of reality and inducement of interest. From this scenario, the 3D VR-based construction site, which can be experienced through a VR equipment, was created and in the same platform, the safety information was provided by the video clip combined with the suitable captions. Although the real construction site involves various requirements depending on field situation and the expertness and experience of workers are not consistent, the developed safety information provision based on the VR construction site is expected to effectively reduce the incomplete factors leading to construction accidents by improving the worker's perception of workplace safety.

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • Journal of the Korea Society of Computer and Information
    • /
    • v.24 no.2
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

Benefit/Cost Analysis of Robot-based Automated Construction System (로봇 크레인 기반 시공자동화공법의 편익/비용 분석)

  • Kim, Tae-Hoon;Lee, Ung-Kyun;Yoo, Wi-Sung;An, Sung-Hoon;Doh, Nak-ju;Cho, Hun-hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.133-134
    • /
    • 2011
  • While researches related with construction automation have dramatically increased, a Robot-based Automatic Construction system (RCA system) has developed for high-rise buildings in Korea. At the aspect that wide adoption of the RCA system is dependent on economic efficiency comparing with a conventional method, feasibility study on the RCA system should be implemented. However, due to practical limitations, the RCA system has tested to a seven story building. Based on the test results, this study implements a cost/benefits analysis to a simulated forty story building in order to derive more reliable data on the RCA system's practicability.

  • PDF

Influence Factors and Management based on Phase of Building Construction for the Improvement of Post Occupancy Indoor Air Quality

  • Lim, Hyoung-Chul
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.6
    • /
    • pp.576-586
    • /
    • 2011
  • In recent years, pollution in residential spaces has been a significant area of concern. In particular, the indoor air quality (IAQ) of an apartment building before occupancy, which is related to the interior material, is a serious problem. Unlike previous research, which has mainly focused on pollution control after construction, this study has derived influencing factors and priority of management with a controlling schedule for IAQ. The objectives of this research are 1) control of schedule or improvement of management for IAQ, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall?based apartment buildings and in column?based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

Development of Expertise-based Safety Performance Evaluation Model

  • Yoo, Wi Sung;Lee, Ung-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.13 no.2
    • /
    • pp.159-168
    • /
    • 2013
  • Construction projects have become increasingly complex in recent years, resulting in substantial safety hazards and frequent fall accidents. In an attempt to prevent fall accidents, various safety management systems have been developed. These systems have mainly been evaluated qualitatively and subjectively by practitioners or supervisors, and there are few tools that can be used to quantitatively evaluate the performance of safety management systems. We propose an expertise-based safety performance evaluation model (EXSPEM), which integrates a fuzzy approach-based analytic hierarchy process and a regression approach. The proposed model uses S-shaped curves to represent the degree of contribution by subjective expertise and is verified by a genetic algorithm. To illustrate its practical application, EXSPEM was applied to evaluate the safety performance of a newly developed real-time mobile detector monitoring system. It is expected that this model will be a helpful tool for systematically evaluating the application of a robust safety control and management system in a complex construction environment.

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF

A Fundamental Study on International Comparison of Labor Productivity in Construction Industry (건설업 노동생산성의 국제비교에 관한 기초 연구)

  • Park, Hwan-Pyo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.310-311
    • /
    • 2018
  • This study compared the labor productivity of the construction industry to the manufacturing and service industries. In addition, It analyzed the construction labor productivity gap of the G7 countries based on data from the Korean Productivity Center. A comparative analysis of construction labor productivity between manufacturing and service industries, based on statistics from the National Statistical Office, revealed a relatively low level and trend of continued decline. In addition, a comparative analysis of the productivity of construction workers in the major G7 countries found that the difference in productivity is very large, with an average of 65.3 %. Therefore, domestic construction companies and the government should prepare Improvement measures to improve productivity by investing in technology development to increase labor productivity and improving the production system of the construction industry.

  • PDF

Non-Value Adding Activities in South African Construction: A Research Agenda

  • Emuze, Fidelis;Smallwood, John
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.3
    • /
    • pp.38-44
    • /
    • 2011
  • The central issue in this particular research is the seemingly inadequate achievement of optimum performance in the construction process, either with respect to value for money for the client and the entire construction supply chain or value in terms of the utility derived from built assets in spite of efforts by government and governmental bodies such as the Construction Industry Development Board (cidb) to increase industry performance. Therefore, based upon an extensive review of related literature, the paper reports on effects and causes of non-value adding activities in the construction industry in general, and South African construction in particular. The research findings indicate that activities that can be referred to as non-value activities are not only prevalent, but they can also be held responsible for performance related issues in terms of cost, time, quality and health and safety (H&S) in construction; and the exploration of pluralism in the research methodology may result in a robust model based upon the system dynamics approach.

A FRAMEWORK FOR SIMULATING CONSTRUCTION PROCESSES FOR OPTIMIZING THE FLOOR CONSTRUCTION CYCLE USING BIM

  • Seung-Jun Ahn;Hyun-Soo Lee;Moonseo Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.835-840
    • /
    • 2009
  • Lately, Building Information Modeling (BIM) emerges as the most promising technology, now is expected to bring a great deal of improvement of productivity in every aspect of the construction industry. One of the BIM based scheduling is to use BIM model as a base for applying to schedule analysis and simulation tools. This type of tools may incorporate a various types of information such as the building model, construction method information, resource information, productivity information, rules and constraints to optimize activity sequencing. This paper proposes a framework of BIM based simulating system which can be used to optimize construction processes, especially for the floor construction cycle. For the purpose, all of the necessary components of the system will be defined and represented, and next an algorithm will be introduced to demonstrate the principle of simulating operation. The benefits of this technique are basically two : to test and optimize construction methods in respect of the construction duration and to reduce the floor construction cycle.

  • PDF